Planning Application Status

PL2023319




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2023319
Outlaw Harley Davidson
Commercial Preliminary Development Plan
Commercial Preliminary Development Plan
Withdrawn
11/17/2023
CRCP INVESTMENTS LLC
Harley-Davidson dealership 34,000 sqft with training area and future event space. Located at the northeast corner of NE Strother Rd and NE Ralph Powell Rd.
Locations
Contacts
ENGINEERING SOLUTIONS, Address:50 SE 30TH ST, Phone:(816) 623-9888  
MATT SCHLICHT, Address:50 SE 30TH ST, Phone:(816) 623-9888  
CRCP INVESTMENTS LLC, Address:3170 NE CARNEGIE DR STE 400  
Reviews
Review Type Outcome Est. Completion Date Completed
Planning Review No Comments 01/19/2024 01/19/2024
Shannon McGuire
Engineering Review Approved with Conditions 01/19/2024 01/16/2024
Gene Williams, P.E.
DE C&O #01 Eng Plans – FDP/PDP
Corrective Action Required
01/16/2024

All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final development plan. All public infrastructure must be substantially complete, prior to the issuance of any certificates of occupancy.
DE C&O #03 Eng & Insp Fees
Corrective Action Required
01/16/2024

All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any site development permits or the start of construction (excluding land disturbance permit).
DE C&O #04 Cert FA or Escrow
Corrective Action Required
01/16/2024

All subdivision-related public improvements must have a Certificate of Final Acceptance prior to approval of the final plat, unless security is provided in the manner set forth in the City's Unified Development Ordinance (UDO) Section 7.340. If security is provided, building permits may be issued upon issuance of a Certificate of Substantial Completion of the public infrastructure as outlined in Article 3, Division V, Sections 3.540 and 3.550 and Article 3, Division IV, Section 3.475 of the UDO, respectively.
DE C&O #06 Land Disturbance
Corrective Action Required
01/16/2024

A Land Disturbance Permit shall be obtained from the City if groundbreaking will take place prior to the issuance of a site development permit, building permit, or prior to the approval of the Final Development Plan / Engineering Plans.
DE C&O #07 Easements
Corrective Action Required
01/16/2024

All permanent off-site easements, in a form acceptable to the City, shall be executed and recorded with the Jackson County Recorder of Deeds prior to the issuance of a Certificate of Substantial Completion or approval of the final plat. A certified copy shall be submitted to the City for verification.
DE C&O #11 Pavement Thickness
Corrective Action Required
01/16/2024

Private parking lots shall follow Article 8 of the Unified Development Ordinance for pavement thickness and base requirements.
DE C&O #12 Cut & Fill
Corrective Action Required
01/16/2024

Any cut and / or fill operations, which cause public infrastructure to exceed the maximum / minimum depths of cover shall be mitigated by relocating the infrastructure vertically and / or horizontally to meet the specifications contained within the City’s Design and Construction Manual.
Engineering Review Approved with Conditions 01/03/2024 01/03/2024
Gene Williams, P.E.
Corrective Action Required
01/03/2024

The artificial turf grass shown over the public main along Vanderbilt Ln. is considered a non-allowed use according to the City of Lee's Summit Encroachment Policy. The artificial turf grass shall be moved so that no portion of the artificial turf grass is within five (5) feet of the public water main.
DE C&O #01 Eng Plans – FDP/PDP
Corrective Action Required
01/16/2024

All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final development plan. All public infrastructure must be substantially complete, prior to the issuance of any certificates of occupancy.
DE C&O #03 Eng & Insp Fees
Corrective Action Required
01/16/2024

All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any site development permits or the start of construction (excluding land disturbance permit).
DE C&O #04 Cert FA or Escrow
Corrective Action Required
01/16/2024

All subdivision-related public improvements must have a Certificate of Final Acceptance prior to approval of the final plat, unless security is provided in the manner set forth in the City's Unified Development Ordinance (UDO) Section 7.340. If security is provided, building permits may be issued upon issuance of a Certificate of Substantial Completion of the public infrastructure as outlined in Article 3, Division V, Sections 3.540 and 3.550 and Article 3, Division IV, Section 3.475 of the UDO, respectively.
DE C&O #06 Land Disturbance
Corrective Action Required
01/16/2024

A Land Disturbance Permit shall be obtained from the City if groundbreaking will take place prior to the issuance of a site development permit, building permit, or prior to the approval of the Final Development Plan / Engineering Plans.
DE C&O #11 Pavement Thickness
Corrective Action Required
01/16/2024

Private parking lots shall follow Article 8 of the Unified Development Ordinance for pavement thickness and base requirements.
DE C&O #12 Cut & Fill
Corrective Action Required
01/16/2024

Any cut and / or fill operations, which cause public infrastructure to exceed the maximum / minimum depths of cover shall be mitigated by relocating the infrastructure vertically and / or horizontally to meet the specifications contained within the City’s Design and Construction Manual.
Fire Review No Comments 01/03/2024 01/02/2024
Grant White
Code Statement
Corrective Action Required
12/22/2023

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Dead Ends
Corrective Action Required
12/22/2023

IFC 503.2.5 - Dead-end fire apparatus access roads in excess of 150 feet (45 720 mm) in length shall be provided with an approved area for turning around fire apparatus. Recommend more of a turn around at the southeast end of the parking lot.
Imposed Loads
Corrective Action Required
12/22/2023

IFC 503.2.3 - Fire apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus and shall be surfaced so as to provide all-weather driving capabilities. Fire lanes shall support 75,000-pounds.
Fire Lanes - Marking
Corrective Action Required
12/22/2023

IFC 503.3 - 503.3 Marking. Where required by the fire code official, approved signs or other approved notices or markings that include the words NO PARKING—FIRE LANE shall be provided for fire apparatus access roads to identify such roads or prohibit the obstruction thereof. The means by which fire lanes are designated shall be maintained in a clean and legible condition at all times and be replaced or repaired when necessary to provide adequate visibility. Fire lanes may be marked in one or a combination of methods as approved by the fire code official. Curbs. All curbs and curb ends shall be painted red with four inch (4") white lettering stating "FIRE LANE—NO PARKING". Wording may not be spaced more than fifteen feet (15') apart. Where no curb exists or a rolled curb is installed, a 6-inch (6") wide painted red stripe applied to the concrete or asphalt with four inch (4") white lettering stating "FIRE LANE—NO PARKING. "Signs. In areas where fire lanes are required, but no continuous curb is available, one of the following methods shall be used to indicate the fire lane. Option 1 : A sign twelve inches (12") wide and eighteen inches (18") in height shall be mounted on a metal post set in concrete a minimum of depth of eighteen inches (18") set back one foot (1') in from the edge of the roadway with the bottom of the sign being seven feet (7') from finished grade. Signs shall face oncoming traffic. Spacing of signs shall not exceed fifty feet (50') between signs. Signs shall be reflective material with a white color background with symbols, letters and border in red color. "FIRE LANE—NO PARKING". Option 2 : A sign twelve inches (12") wide and eighteen inches (18") in height shall be mounted on the side of a structure or other permanent fixture approved by the Fire Code Official. The bottom of the sign being seven feet (7') from finished grade. Spacing of signs shall not exceed fifty feet (50') between signs. Signs shall be reflective material with a white color background with symbols, letters and border in red color. "FIRE LANE—NO PARKING". Post the lane coming from Vanderbilt and the southest end of the parking lot.
FDC
Corrective Action Required
12/22/2023

IFC 903.3.7 - Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official. Show the location of the FDC on the building.
Planning Review Corrections 01/03/2024 12/28/2023
Shannon McGuire
Corrective Action Required
12/28/2023

Sheet A2.1 still is showing the 24’ tall monument sign. Please remove this drawing from the plans.
Corrective Action Required
12/28/2023

Please label the width of the sidewalks adjacent to the building to ensure they are a minimum of 6’.
Corrective Action Required
12/28/2023

Easements may not be vacated by minor plat. This will require separate applications. Please remove these labels form the plan documents.
Traffic Review No Comments 01/03/2024 12/22/2023
Scott Ready
Planning Review Corrections 12/08/2023 12/10/2023
Shannon McGuire
Corrective Action Required
12/10/2023

Building Elevations – Please provide color elevations of the proposed building.
Corrective Action Required
12/10/2023

Ground cover - Open areas not covered with other materials shall be covered with sod. Please label these areas.
Corrective Action Required
12/10/2023

Trash Enclosures - A detailed drawing of enclosure and screening methods to be used in connection with trash storage containers on the property shall be included with the landscaping plan. Where will the dumpsters be located for this site?
Corrective Action Required
12/10/2023

Island width - Tree planting areas shall be no less than 10 feet in width. No tree shall be located less than 4 feet from the back of curb. The trees along NE Vanderbilt seem to be squeezed in. Please label the setback of the trees from the curbing and syntactic turf area. Please also label the width between the curbing and the turf in this area.
Corrective Action Required
12/10/2023

Parking lot screening - Screening to a height of 2.5 feet must be provided along the edge of the parking lot or loading area closest to and parallel to the street. Please add additional shrubs along the east edge of the parking lot adjacent to NE Ralph Powell Rd.
Corrective Action Required
12/10/2023

Parking dimensions – Parking stalls are required to be 9’ wide x 19’ deep or 9’ wide x 17’ deep if the parking space abuts a 6’ wide sidewalk or when abutting a curbed open green/landscaped space. The parking stall along the outer perimeter are to short, 15.5’. Please also label the sidewalk with between the building and parking stalls adjacent to the south and west facades of the building.
Corrective Action Required
12/10/2023

Curbing - CG-1 concrete curbing is required around all parking areas and access drives in office, commercial and industrial districts. You will need a modification to seek relief from this requirement for curbing around the “test area”.
Corrective Action Required
12/10/2023

Accessible Parking Space Size - Accessible parking spaces shall have an adjacent aisle 5 feet wide, and one in every 8 accessible spaces (but no less than one) shall be adjacent to an aisle 8 feet wide and the space shall be clearly marked with a sign indicating that the space is “van accessible. Please label the width of the ADA aisles.
Corrective Action Required
12/10/2023

Accessible Parking Space Location - Accessible spaces shall be located at the nearest point to the front building entry and/or accessible ramp. Such spaces separated by a drive aisle shall have clearly discernable cross walks. Please relocate the ADA stalls nearest to the main entrance of the proposed building.
Corrective Action Required
12/10/2023

Accessible Parking Space Location – Please show the accessible route from the parking stall to the entrance. As show there is curbing blocking the rout from both sets of ADA stalls to the entrances.
Corrective Action Required
12/10/2023

Accessible Parking Space Location – How will you protect the building from errant vehicles parking in the ADA stalls? The use of curb blocks at the head of accessible parking spaces when they are adjacent to a pedestrian walkway with no raised curb is acceptable.
Corrective Action Required
12/10/2023

Accessible Parking Standards - All accessible parking shall comply with the requirements of the federal Americans with Disabilities Act.
Corrective Action Required
12/10/2023

Signs – The UDO limits the number of signs to 3 for a single tenant building in this zoning district. You will need to seek approval of your proposed sign package. Please do so by providing a written narrative providing justification for the requested sign package. Staff can support the signs package excluding the monument sign. See the below comment for more about the monument sign.
Corrective Action Required
12/10/2023

Monument sign – A monument sign is defined as a freestanding sign in which the entire bottom of the sign is in contact with the ground, or which is mounted on a solid base at least two-thirds of the width of the sign face, providing a solid and continuous background for the sign face from the ground to the top of the sign. The base of the proposed monument sign does not meet the minimum width requirement. Currently the sign bass is only 40.3% of the width of the overall sign. It needs to be a minimum of 66.6% or 95.9” wide.
Corrective Action Required
12/10/2023

Signs – A monument sign is limited to 72 sq. ft. for the sign face area and 96 sq. ft. for the structure area with a maximum height of 12’ tall in the CP-2 zoning district. The proposed sign far exceeds these limitations. Please reduce the size of the sign to meet the UDO requirements. Staff cannot support a sing this large.
Corrective Action Required
12/10/2023

Motorcycle sales is an allowed use in the CP-2 zoning district as long as there is no outdoor display. If you would like outdoor display of the motorcycles you will need to seek a modification.
Corrective Action Required
12/10/2023

Modification Statement - A narrative statement that explains the need for and justification for all requested modifications of the applicable zoning district regulations, shall be submitted in support of the application for the preliminary development plan approval.
Corrective Action Required
12/10/2023

Please show the proposed monument sign on the site plan, Sheet C. 101. There are 2 boxes on sheet C. 101 shown in the south east corner of the property but they are not labeled. Are these the monument sign?
Corrective Action Required
12/10/2023

Setbacks – Please label the set back of the bathroom building from the property line.
Corrective Action Required
12/10/2023

Easements may not be vacated by minor plat. This will require separate applications. Please remove these labels form the plan documents.
Corrective Action Required
12/10/2023

Label the width of the drive entrance from NE Ralph Powell Rd.
Corrective Action Required
12/10/2023

The south east corner of the proposed building look to be over the building setback line. Is this part of the building or is it something else?
Corrective Action Required
12/10/2023

The UDO requires all roof top units to be screened by a parapet wall at least the height of the units. Please provide more detail on how the RTUs will be screened. Are you proposing an inset parapet wall, are these boult on screens or are you proposing another screening method? Will there be any ground mounted mechanical units?
Corrective Action Required
12/10/2023

Metal is a conditional material that will require the approval of the Planning Commission and City Council. Please label the total % of each façade material.
Corrective Action Required
12/10/2023

What material is being proposed on the underside of the awnings and roof overhangs?
Engineering Review Corrections 12/08/2023 12/07/2023
Gene Williams, P.E.
Corrective Action Required
12/07/2023

The private water main shown on the utility plan needs substantial work. In addition, there are several conflicts with easements that need to be eliminated. The storm line shown in the southwest connecting to the curb inlet on Ralph Powell Rd. likely needs to be replaced. Features are called-out without any identification, and there are questionable materials shown on the call-outs. Finally, there is a private storm line crossing onto Lot 9-C without any apparent private easement. Please see separate sheet showing markups showing the various issues with the utility plan. This sheet will be provided separate from these comments.
Corrective Action Required
12/07/2023

Utility easements and egress/ingress easements shown on the previous plat need to be vacated by separate document to eliminate conflicts. This would include the cul-de-sac bulb, the easements shown around the cul-de-sac bulb, and any other areas where existing easements create conflicts with the placement of private stormwater structures, lighting, backflow vaults, etc.
Corrective Action Required
12/07/2023

As shown on the Preliminary Development Plan, it would appear Lot 9-C of the parent plat will be responsible for the majority of the private road maintenance serving this development from the north. There is no clear delineation of who maintains what, nor to what limits they are maintained. Please define on the replat who will be responsible for maintenance, and where they will be responsible for maintenance.
Corrective Action Required
12/07/2023

Nyloplast inlets are called-out on the private street access road. Please use the City standard curb inlet rather than a nyloplast inlet.
Corrective Action Required
12/07/2023

Trees are shown directly on top of the public sanitary main near the west side of the project. A minimum of 5 feet is required from the outside of the pipe or manhole to the outside of the mature tree trunk. Even though these trees are ornamental, it appears there are better alternatives than placing on top of the sanitary sewer line. Please revise.
Fire Review Approved with Conditions 12/08/2023 12/07/2023
Jim Eden
Code Statement
Corrective Action Required
12/07/2023

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Dead Ends
Corrective Action Required
12/07/2023

IFC 503.2.5 - Dead-end fire apparatus access roads in excess of 150 feet (45 720 mm) in length shall be provided with an approved area for turning around fire apparatus. Recommend more of a turn around at the southeast end of the parking lot.
Imposed Loads
Corrective Action Required
12/07/2023

IFC 503.2.3 - Fire apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus and shall be surfaced so as to provide all-weather driving capabilities. Fire lanes shall support 75,000-pounds.
Fire Lanes - Marking
Corrective Action Required
12/07/2023

IFC 503.3 - 503.3 Marking. Where required by the fire code official, approved signs or other approved notices or markings that include the words NO PARKING—FIRE LANE shall be provided for fire apparatus access roads to identify such roads or prohibit the obstruction thereof. The means by which fire lanes are designated shall be maintained in a clean and legible condition at all times and be replaced or repaired when necessary to provide adequate visibility. Fire lanes may be marked in one or a combination of methods as approved by the fire code official. Curbs. All curbs and curb ends shall be painted red with four inch (4") white lettering stating "FIRE LANE—NO PARKING". Wording may not be spaced more than fifteen feet (15') apart. Where no curb exists or a rolled curb is installed, a 6-inch (6") wide painted red stripe applied to the concrete or asphalt with four inch (4") white lettering stating "FIRE LANE—NO PARKING. "Signs. In areas where fire lanes are required, but no continuous curb is available, one of the following methods shall be used to indicate the fire lane. Option 1 : A sign twelve inches (12") wide and eighteen inches (18") in height shall be mounted on a metal post set in concrete a minimum of depth of eighteen inches (18") set back one foot (1') in from the edge of the roadway with the bottom of the sign being seven feet (7') from finished grade. Signs shall face oncoming traffic. Spacing of signs shall not exceed fifty feet (50') between signs. Signs shall be reflective material with a white color background with symbols, letters and border in red color. "FIRE LANE—NO PARKING". Option 2 : A sign twelve inches (12") wide and eighteen inches (18") in height shall be mounted on the side of a structure or other permanent fixture approved by the Fire Code Official. The bottom of the sign being seven feet (7') from finished grade. Spacing of signs shall not exceed fifty feet (50') between signs. Signs shall be reflective material with a white color background with symbols, letters and border in red color. "FIRE LANE—NO PARKING". Post the lane coming from Vanderbilt and the southest end of the parking lot.
FDC
Corrective Action Required
12/07/2023

IFC 903.3.7 - Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official. Show the location of the FDC on the building.
Traffic Review No Comments 12/08/2023 12/05/2023
Grant White
Resolved
12/04/2023

The size of the building is significantly larger than the one presented at the pre-application meeting. This will require a traffic study for the developement.
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Commercial Preliminary Development Plan fee $2,175.00 $2,175.00 Paid 11/30/2023
9110076-Legal Notice Publishing Charge $165.00 $165.00 Paid 11/30/2023
9110076-Legal Notice Publishing Charge $165.00 $165.00 Paid 11/30/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Planning Commission Meeting 01/25/2024 05:00 PM Council Chambers 01/25/2024 05:00 PM
Agenda Item
Approved
01/25/2024
City Council Public Hearing 02/27/2024 6:00 PM Council Chambers 02/27/2024 06:00 PM
Agenda Item
Approved
02/27/2024
City Council Ordinance 2nd Reading 04/09/2024 6:00 PM Council Chambers 04/09/2024 06:00 PM
Agenda Item
Continued
City Council Ordinance 2nd Reading 06/18/2024 6:00 PM Council Chambers 06/18/2024 06:00 PM
Agenda Item
Continued
City Council Ordinance 2nd Reading 07/09/2024 6:00 PM Council Chambers 07/09/2024 06:00 PM
Agenda Item
Pending
07/09/2024
Documents & Images
Date Uploaded File Type Document Name
11/17/2023 Application Form Application Form_PL2023319
11/17/2023 Plans Civil Plans_Rev 0_PL2023319
11/17/2023 Engineer Report/Study Storm water letter_PL2023319
11/17/2023 Plans Elevations_Rev 0_PL2023319
11/17/2023 Plans Renderings_Rev 0_PL2023319
11/17/2023 Plans Signage Plan_Rev 0_PL2023319
11/17/2023 Plans Signage Elevations_Rev 0_PL2023319
11/29/2023 Activity Document Adjacent Property List_PL2023319
11/30/2023 Activity Document Adjacent Property report_PL2023319
11/30/2023 Receipt Payment Receipt_PL2023319
12/07/2023 Letter Staff Markup of Utility Plan_Rev 0_PL2023319
12/10/2023 Letter Applicant Letter_Rev 0_PL2023319
12/22/2023 Letter UDO Modification Request_PL2023319
12/22/2023 Meeting Summary Neighborhood Meeting Notes_PL2023319
12/22/2023 Letter Responses to Applicant Letter_Rev 0_PL2023319
12/22/2023 Plans Civil Plans_Rev 1_PL2023319
12/22/2023 Plans Signage Elevations_Rev 1_PL2023319
01/03/2024 Letter Applicant Letter_Rev 1_PL2023319
01/04/2024 Public Notice Document Public notice newspaper_PL2023319
01/04/2024 Public Notice Document Public notice Sign photo 1_PL2023319
01/04/2024 Public Notice Document Public notice Sign photo 2_PL2023319
01/11/2024 Engineer Report/Study TIA_PL2023319
01/16/2024 Plans Civil Plans_Rev 2_PL2023319
01/16/2024 Plans Elevations_Rev 2_PL2023319
01/16/2024 Public Notice Document Public notice affidavit_PL2023319
01/19/2024 Letter PL2023-319 PDP Outlaw Harley Davidson
02/08/2024 Public Comment 2-10 Public hearing PL2023-319
02/28/2024 Presentation Presentation CC 2.27.2024
Upload Documents
  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:
Browse..





    Portal Home