PL2023181




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2023181
Casey's General Store
Commercial Final Development Plan
Commercial Final Development Plan
Approved
07/11/2023
150 HIGHWAY LEES SUMMIT LLC
Locations
Contacts
150 HIGHWAY LEES SUMMIT LLC, Address:7217 W 110TH ST  
Casey's Marketing Company, Address:Attn: Shannon Gerard  
SBB Engineering, LLC, Address:Attn: Jeff Laubach, Phone:(785) 215-8630  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review Approved with Conditions 10/30/2023 11/02/2023
Sue Pyles, P.E.
DE C&O #06 Land Disturbance
Corrective Action Required
11/01/2023

A Land Disturbance Permit shall be obtained from the City if groundbreaking will take place prior to the issuance of a site development permit, building permit, or prior to the approval of the Final Development Plan / Engineering Plans.
DE Contact Field Eng. Inspector
Corrective Action Required
11/01/2023

Prior to the commencement of any construction activities, the Contractor shall contact Field Engineering Inspections at (816) 969-1200 to coordinate a preconstruction meeting / conference with the assigned Field Engineering Inspector.
DE Engineers Estimate
Corrective Action Required
11/01/2023

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)), and the water tap and meter setup fee have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $56,333.32
DE Future Repair Work
Corrective Action Required
11/01/2023

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
Traffic Review No Comments 10/30/2023 10/25/2023
Erin Ralovo
Building Codes Review Approved with Conditions 10/30/2023 10/23/2023
Joe Frogge
Miscellaneous Correction
Resolved
10/23/2023

2018 IPC 708.1.2 Building sewers. Building sewers smaller than 8 inches shall have cleanouts located at intervals of not more than 100 feet. Building sewers 8 inches and larger shall have a manhole located not more than 200 feet from the junction of the building drain and the building sewer and at intervals of not more than 400 feet. The interval length shall be measured from the cleanout or manhole opening, along the developed length of the piping to the next drainage fitting providing access for cleaning, a manhole or the end of the building sewer. 2018 IPC 708.1.3 Building drain and building sewer junction. The junction of the building drain and the building sewer shall be served by a cleanout that is located at the junction or within 10 feet of the developed length of piping upstream of the junction. For the requirements of this section, the removal of a water closet shall not be required to provide cleanout access. Action required: Provide additional cleanouts to comply. One more near exit from building and another to satisfy 100' rule. 10/23/23 - Cleanout near building exit still required. See IPC 708.1.3 above.
Miscellaneous Correction
Corrective Action Required
10/23/2023

Architectural plans not part of this review. Action required: comment is informational.
Planning Review No Comments 10/30/2023 10/23/2023
Scott Ready
Fire Review Approved with Conditions 10/30/2023 10/23/2023
Scott Ready
Code Statement
Corrective Action Required
10/23/2023

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Hazmat
Corrective Action Required
10/23/2023

IFC 105.6.20 - A Hazardous materials permit is required for the using, dispensing, transporting, handling, and/or storing of extremely hazardous substances. “Extremely Hazardous Substances (EHS) Facilities” are defined as facilities subject to the provisions of Superfund Amendments and Reauthorization Act of 1986 (SARA TITLE III), Section 302, for storing, dispensing, using, or handling of listed chemicals in excess of their threshold planning quantities (TPQ). See amended Section 5001.4 of the 2018 International Fire Code. A Hazardous Materials Permit may be required depending on total quantity of fuel to be stored.
Building Codes Review Corrections 10/20/2023 10/23/2023
Joe Frogge
Miscellaneous Correction
Corrective Action Required
10/13/2023

2018 IPC 708.1.2 Building sewers. Building sewers smaller than 8 inches shall have cleanouts located at intervals of not more than 100 feet. Building sewers 8 inches and larger shall have a manhole located not more than 200 feet from the junction of the building drain and the building sewer and at intervals of not more than 400 feet. The interval length shall be measured from the cleanout or manhole opening, along the developed length of the piping to the next drainage fitting providing access for cleaning, a manhole or the end of the building sewer. 2018 IPC 708.1.3 Building drain and building sewer junction. The junction of the building drain and the building sewer shall be served by a cleanout that is located at the junction or within 10 feet of the developed length of piping upstream of the junction. For the requirements of this section, the removal of a water closet shall not be required to provide cleanout access. Action required: Provide additional cleanouts to comply. One more near exit from building and another to satisfy 100' rule. 10/23/23 - Cleanout near building exit still required. See IPC 708.1.3 above.
Miscellaneous Correction
Resolved
10/23/2023

Additional pipe size information needed. Action required: Specify 2" piping from taps to meters.
Miscellaneous Correction
Corrective Action Required
10/13/2023

Architectural plans not part of this review. Action required: comment is informational.
Fire Review Approved with Conditions 10/20/2023 10/20/2023
Jim Eden
Code Statement
Corrective Action Required
10/20/2023

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Hazmat
Corrective Action Required
10/23/2023

IFC 105.6.20 - A Hazardous materials permit is required for the using, dispensing, transporting, handling, and/or storing of extremely hazardous substances. “Extremely Hazardous Substances (EHS) Facilities” are defined as facilities subject to the provisions of Superfund Amendments and Reauthorization Act of 1986 (SARA TITLE III), Section 302, for storing, dispensing, using, or handling of listed chemicals in excess of their threshold planning quantities (TPQ). See amended Section 5001.4 of the 2018 International Fire Code. A Hazardous Materials Permit may be required depending on total quantity of fuel to be stored.
Traffic Review Corrections 10/20/2023 10/20/2023
Erin Ralovo
Informational
10/25/2023

The ramps crossing the south drive will require detectable sufaces. While it is understood that these improvements will be completed with the Public improvements, they are not shown in these drawings. Ramps are included on Public Improvements but comment was acknowledged by applicant.
Resolved
10/25/2023

The winding sidewalk on the east side of the property is not subject to the rule of following the slope of the raod and will need to meet the maximum 5% ADA slope requirements.
Engineering Review Corrections 10/20/2023 10/20/2023
Sue Pyles, P.E.
Corrective Action Required
10/20/2023

• The FEMA panel number and MoDOT right-of-way notes were revised on the cover sheet, but not elsewhere in the plan set. Please revise all instances. • Include the domestic water pipe material requirement, Soft Type K Copper, from the main to 10’ beyond the water meter. • All pipe greater than 6” diameter require pipe profiles. Please add profiles for the pipe revised to 8” diameter. • Please revise the pipe backfill detail to a detail that ill be sent under separate cover.
Planning Review No Comments 10/20/2023 10/19/2023
Shannon McGuire
Engineering Review Corrections 08/30/2023 08/30/2023
Sue Pyles, P.E.
Corrective Action Required
08/30/2023

General: • Show location of all oil/gas wells, or indicate none are present, and cite the source. • Please add a note stating: “The contractor shall contact the City’s Development Services Engineering Inspection to schedule an inspection coordination meeting with a Field Engineering Inspector prior to any land disturbance work at (816) 969-1200.” • Submit an Engineer's Estimate of Probable Construction Costs. • SWPPP and a copy of the MDNR Land Disturbance Permit. • Please include the following standard details: o Inlet protection. o Pipe backfill. o Nyloplast inlet.
Corrective Action Required
08/30/2023

Sheet C-001: • Please add Lee’s Summit Public Works as the stormwater contact. • General Note 6 references MoDOT. This site abuts both MoDOT and Lee’s Summit right-of-way. Please clarify the note on this sheet and all other occurrences throughout the plan set.
Corrective Action Required
08/30/2023

Sheet C-100: There is a typo in the FEMA panel number. Please revise.
Corrective Action Required
08/30/2023

Sheets C-101 & C-102: Please include all of the Nyloplast structures on these sheets in the same manner as the other storm structures are shown.
Corrective Action Required
08/30/2023

Sheet C-201: How is the low point within the 1004 contour north of the trash enclosure expected to drain?
Corrective Action Required
08/30/2023

Sheet C-301: • Please review Design and Construction Manual Section 6900 for the following: o Section6901.I – Backflow vault placement and domestic water line connection requirements. o Section 6901.L – Water meter placement. • The plans show the public sanitary sewer along M150 being extended to the west property line. This public extension is terminating at the MH shown on the east side of the property. • Include water line material in the Site Plan Key Notes. • Please show how the backflow vault will be drained. We have seen the following methods used in the past: 1) daylighting with a small diameter pipe, 2) connection to a storm box, or 3) construction of an infiltration gallery in the form of a 2-foot diameter hole lined with permeable geotextile and filled with clean ¾-inch rock. In lieu of the above, a sump pump could be installed. Please evaluate and revise as appropriate.
Corrective Action Required
08/30/2023

Sheet C-302: • It’s unlikely that the 1.33 acres is going to be captured in structure A4. Please design for now as well as looking to the future development of that pad site. • Curb inlets are not to be placed where there is no curb. Perhaps it can be an area inlet that is later converted to a curb inlet. Please evaluate and revise as appropriate. • Please account for the Nyloplast structures in the drainage information. They are a part of the stormwater system on this site. Even though the 6” pipe size will not require pipe profiles be provided, design information is still required.
Corrective Action Required
08/30/2023

Sheet C-303: • Include pipe lengths in Profile views. • What is the “2’ Separation” near Sta. 10+60 in the Storm A Profile view? • Please show the design HGL in Profile views. If the pipe does not convey the 100-year flow, please provide an appropriate overflow path. • Include the following note: “Compacted Fill shall be placed to a minimum 18” above the top of the pipe prior to installation.” Show and label the limits of the compacted fill placement in the Profile view. Use hatching for clarity.
Corrective Action Required
08/30/2023

Sheet C-601: The curb and gutter detail or pavement detail must show that the aggregate base and compaction of native subgrade extends a minimum of one (1) foot beyond the back of curb.
Planning Review Corrections 08/30/2023 08/29/2023
Shannon McGuire
Corrective Action Required
08/29/2023

Filing Fee – Please ensure the filing fee of $725.00 is paid.
Corrective Action Required
08/29/2023

Legal Description – Please provide the legal description in a selectable format.
Corrective Action Required
08/29/2023

Oil & Gas Wells – Please show the location of all oil and gas wells. If none are present, please add a note stating so and cite your source of information.
Corrective Action Required
08/29/2023

Building Elevations – Please provide Elevations of all sides of proposed buildings including notation indicating building materials to be used on exteriors and roofs.
Corrective Action Required
08/29/2023

Roof Line – On the elevations please show a dashed line indicating the roof line and rooftop mechanical equipment.
Corrective Action Required
08/29/2023

Floor Plan – Please provide a Floor plan showing dimensions and areas of all floors within the proposed building.
Corrective Action Required
08/29/2023

Land Use Schedule – Int site data table on sheet C-103, please include the Floor Area Ratio (FAR).
Corrective Action Required
08/29/2023

Parking Dimensions – Parking stalls are required to be 9’ wide x 19’ deep, placed at the prescribed angle so that it lies between the curb and the aisle. The proposed bollards are shortening the usable stall depth. Please label the depth of parking stalls to the proposed bollards to ensure a minimum depth of 19’.
Corrective Action Required
08/29/2023

Curbing - Temporary asphalt curbs may be used in areas to be expanded only as shown and approved on the development plan. Please show temporary asphalt curbing at the ends of the drive stubs along the western property line.
Corrective Action Required
08/29/2023

Accessible Parking Space Size - Accessible parking spaces shall have an adjacent aisle 8 feet wide. Please label the width between the bollards in the ADA aisle to ensure the minimum clear path in maintained.
Corrective Action Required
08/29/2023

Accessible Parking Standards - All accessible parking shall comply with the requirements of the federal Americans with Disabilities Act.
Corrective Action Required
08/29/2023

Signs - All signs must comply with the sign requirements as outlined in the sign section of the UDO and will be reviewed under separate application
Corrective Action Required
08/29/2023

Parking lot design - Trash enclosure areas shall be improved with a Portland cement concrete pad and a Portland cement concrete approach 30 feet in length, measured from the enclosure opening. The pad and approach shall be improved with a minimum six inches of full depth unreinforced Portland cement concrete constructed on a sub-grade of four inches of granular base course.
Corrective Action Required
08/29/2023

Improvement of Parking Area – Please provide standard details for the proposed parking lot pavement.
Fire Review Approved with Conditions 08/30/2023 08/29/2023
Jim Eden
Traffic Review Corrections 08/30/2023 08/28/2023
Erin Ralovo
Corrective Action Required
08/28/2023

If the Preschool/Daycare application does not proceed as fast as this development all access will need to go in with this development.
Corrective Action Required
08/28/2023

All Public Improvement Plans must be approved before this application will be approved. MoDOT must also sign off on the approvements.
Corrective Action Required
08/28/2023

Please add a ONE WAY sign in the median along MO 150.
Building Codes Review Corrections 08/30/2023 08/23/2023
Joe Frogge
Miscellaneous Correction
Corrective Action Required
08/23/2023

2018 IPC 708.1.2 Building sewers. Building sewers smaller than 8 inches shall have cleanouts located at intervals of not more than 100 feet. Building sewers 8 inches and larger shall have a manhole located not more than 200 feet from the junction of the building drain and the building sewer and at intervals of not more than 400 feet. The interval length shall be measured from the cleanout or manhole opening, along the developed length of the piping to the next drainage fitting providing access for cleaning, a manhole or the end of the building sewer. 2018 IPC 708.1.3 Building drain and building sewer junction. The junction of the building drain and the building sewer shall be served by a cleanout that is located at the junction or within 10 feet of the developed length of piping upstream of the junction. For the requirements of this section, the removal of a water closet shall not be required to provide cleanout access. Action required: Provide additional cleanouts to comply. One more near exit from building and another to satisfy 100' rule.
Miscellaneous Correction
Corrective Action Required
08/23/2023

Additional pipe size information needed. Action required: Specify 2" piping from taps to meters.
Miscellaneous Correction
Corrective Action Required
08/23/2023

Architectural plans not part of this review. Action required: comment is informational.
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Final Development Plan fee $725.00 $725.00 Paid 10/13/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
City Council Ordinance 2nd Reading 10/15/2024 6:00 PM Council Chambers 10/15/2024 06:00 PM
Agenda Item
Pending
Documents & Images
Date Uploaded File Type Document Name
08/16/2023 Plans AL 401 Dumpster Enclosure
08/16/2023 Plans Building Elevations
08/16/2023 Plans C-701 Landscape Plan
08/16/2023 Plans Civil Plans
08/16/2023 Application Form FDP Applicaiton - Casey's Arborwalk
08/16/2023 Plans Lee's Summit, MO - Sign Packet 08-02-22
08/16/2023 Plans Lighting Plans
08/31/2023 Letter Applicant Letter - FDP (DFDP)
10/13/2023 Receipt Receipt for transaction:2023-007759
10/13/2023 Letter Applicant Letter - FDP (DFDP)-responses
10/13/2023 Plans Civil Plans 2023_10_13
10/13/2023 Engineers Estimate Cost Estimate
10/13/2023 Plans Lee's Summit Proposed Elevations
10/13/2023 Plans Lee's Summit Proposed Floor Plan
10/13/2023 3rd Party Permit/Approval MDNR Permit NOI
10/13/2023 Engineer Report/Study SWPPP - Casey's Lee's Summit
10/23/2023 Letter Applicant Letter - FDP (DFDP)
10/23/2023 Letter Applicant Letter - FDP Responses
10/23/2023 Plans Civil Plans 2023_10_23
11/01/2023 Activity Document Fees PL2023181 Caseys FDP
11/02/2023 Letter Applicant Letter - FDP (DFDP)
12/01/2023 Approved Plans Approved Casey's FDP_Arborwalk West_12012023
08/16/2024 Engineer Report/Study Traffic Study Memo_Revised_Approved_08162024
08/16/2024 Letter MoDOT Approval Memo_Revised_08162024
08/22/2024 Letter FDP Approval Extension Request Letter - Casey's - PL2023181
09/16/2024 Letter FDP Approval Extension CC Memo - Casey's - PL2023181
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home