Review Type |
Outcome |
Est. Completion Date |
Completed |
Record Drawings Review
|
No Comments
|
10/24/2024
|
10/18/2024
|
|
Gene Williams, P.E.
|
|
|
Record Drawings Review
|
Corrections
|
10/23/2024
|
10/17/2024
|
|
Gene Williams, P.E.
|
|
Corrective Action Required
Mssing Sheets 6.3 and 6.4. Following items are needed in as-built form: 1) top of embankment, 2) 100 year clogged WSE, 3) 100 year WSE, 4) emergency spillway elevation, 5) flowline elevations of all aspects of outlet structure, including inlet pipes, outlet pipes, weirs, orifices, top of outlet control structures, etc., 5) bottom of basin spot elevation callouts, and 6) 100 year storage volume for the design condition (i.e., not the clogged condition). Correction required.
|
|
|
Building Codes Review
|
Approved with Conditions
|
03/17/2023
|
03/15/2023
|
|
Joe Frogge
|
|
Miscellaneous Correction
Corrective Action Required
Provide engineered light pole base detail.
2/28/23 - deferred to permit submttal
|
|
Miscellaneous Correction
Corrective Action Required
Specify type and location of irrigation system backflow preventer.
2/28/23 - deferred to permit submttal
|
|
|
Planning Review
|
Approved with Conditions
|
03/17/2023
|
03/15/2023
|
|
Hector Soto Jr.
|
|
Corrective Action Required
EXISTING SANITARY SEWER LINE AND EASEMENT. The existing public main and easement that conflict with the proposed building location shall be relocated (the main) and easement vacated prior to the issuance of a building permit for the building.
|
|
|
Fire Review
|
Approved with Conditions
|
03/17/2023
|
03/14/2023
|
|
Jim Eden
|
|
Code Statement
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Action required- Show the proposed location of the FDC.
|
|
FDC
IFC 903.3.7 - Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official.
The proposed location is obstructed and exceeds 100 feet to a hydrant. Locate the FDC on the north side of the building near the hydrant.
|
|
|
Engineering Review
|
Approved with Conditions
|
03/17/2023
|
03/14/2023
|
|
Gene Williams, P.E.
|
|
DE Engineers Estimate
Corrective Action Required
The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)), and the water tap and meter setup fee have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $60,318.31
|
|
DE Contact Field Eng. Inspector
Corrective Action Required
Prior to the commencement of any construction activities, the Contractor shall contact Field Engineering Inspections at (816) 969-1200 to coordinate an inspections coordination meeting with the assigned Field Engineering Inspector.
|
|
DE Commercial Detention Basin
Corrective Action Required
The applicant shall submit and the City shall accept an “As-built / As-graded” detention basin plan for both detention basins prior to issuance of any occupancy permit for the proposed development.
|
|
DE Future Repair Work
Corrective Action Required
Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
|
|
|
Traffic Review
|
No Comments
|
03/17/2023
|
03/10/2023
|
|
Diana Johnson
|
|
|
Building Codes Review
|
Approved with Conditions
|
02/27/2023
|
02/28/2023
|
|
Joe Frogge
|
|
Miscellaneous Correction
- Provide cleanout near where sanitary leaves footprint of building per 2018 IPC 708.1.3.
- Provide additional cleanout to comply with 100' rule per 2018 IPC 708.1.2.
|
|
Miscellaneous Correction
Corrective Action Required
Provide engineered light pole base detail.
2/28/23 - deferred to permit submttal
|
|
Miscellaneous Correction
Corrective Action Required
Specify type and location of irrigation system backflow preventer.
2/28/23 - deferred to permit submttal
|
|
|
Engineering Review
|
Approved with Conditions
|
02/27/2023
|
02/27/2023
|
|
Gene Williams, P.E.
|
|
DE Engineers Estimate
Corrective Action Required
The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)), and the water tap and meter setup fee have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $60,318.31
|
|
DE Contact Field Eng. Inspector
Corrective Action Required
Prior to the commencement of any construction activities, the Contractor shall contact Field Engineering Inspections at (816) 969-1200 to coordinate an inspections coordination meeting with the assigned Field Engineering Inspector.
|
|
DE Commercial Detention Basin
Corrective Action Required
The applicant shall submit and the City shall accept an “As-built / As-graded” detention basin plan for both detention basins prior to issuance of any occupancy permit for the proposed development.
|
|
DE Future Repair Work
Corrective Action Required
Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
|
|
|
Planning Review
|
Approved with Conditions
|
02/27/2023
|
02/27/2023
|
|
Hector Soto Jr.
|
|
Corrective Action Required
EXISTING SANITARY SEWER LINE AND EASEMENT. The existing public main and easement that conflict with the proposed building location shall be relocated (the main) and easement vacated prior to the issuance of a building permit for the building.
|
|
|
Traffic Review
|
No Comments
|
02/27/2023
|
02/27/2023
|
|
Brad Cooley, P.E., RSPI
|
|
|
Fire Review
|
Corrections
|
02/27/2023
|
02/23/2023
|
|
Jim Eden
|
|
Code Statement
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Action required- Show the proposed location of the FDC.
|
|
FDC
Corrective Action Required
IFC 903.3.7 - Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official.
The proposed location is obstructed and exceeds 100 feet to a hydrant. Locate the FDC on the north side of the building near the hydrant.
|
|
|
Building Codes Review
|
Corrections
|
01/31/2023
|
02/01/2023
|
|
Joe Frogge
|
|
Miscellaneous Correction
Corrective Action Required
- Provide cleanout near where sanitary leaves footprint of building per 2018 IPC 708.1.3.
- Provide additional cleanout to comply with 100' rule per 2018 IPC 708.1.2.
|
|
Miscellaneous Correction
Corrective Action Required
Provide engineered light pole base detail.
|
|
Miscellaneous Correction
Corrective Action Required
Specify type and location of irrigation system backflow preventer.
|
|
|
Planning Review
|
Corrections
|
01/31/2023
|
02/01/2023
|
|
Hector Soto Jr.
|
|
Corrective Action Required
EXISTING SANITARY SEWER LINE AND EASEMENT. For your information, the existing public main and easement that conflict with the proposed building location shall be relocated (the main) and easement vacated prior to the issuance of a building permit for the building. The associated vacation of easement (VOE) application is currently undergoing the approval process.
|
|
Corrective Action Required
DROP-OFF AREAS. The drop-off lane serving the building entry at the southwest building corner has a single lane. Staff assumes the intent is for vehicles to circulate in a counter-clockwise manner so the passenger side of a vehicle is on the building side. Provide "One-way" signage at the entrance and "Do Not Enter/Exit Only" signage at the exit plus pavement markings in order to direct circulation.
|
|
Corrective Action Required
MONUMENT SIGNS. For your information, the review and approval of all exterior signage (i.e. monument signs and wall signs) is done under separate cover through a sign permit application.
|
|
|
Engineering Review
|
Corrections
|
01/31/2023
|
01/27/2023
|
|
Gene Williams, P.E.
|
|
Corrective Action Required
Sanitary sewer and water line alignment will likely change based on discussions with Water Utilities, and the revised layout shall be included on the Final Development Plan.
|
|
Corrective Action Required
Overall grading plan shall include notes and labels for the stream buffer. Please revise.
|
|
Corrective Action Required
In addition to elevation and dimension callouts on the ADA-accessible parking space plan, slope callouts shall also be provided with the design slope no greater than 1.5% in any direction within the ADA-accessible space. Please revise.
|
|
Corrective Action Required
Erosion and sediment control plan does not show the installation of the detention basins on the staging chart. This shall be one of the first items required as part of the project (i.e., installation of the detention basins), as they directly-affect water quality. It may be necessary to design these basins as temporary sediment basins until such time that the project is completed. Please evaluate and revise as appropriate.
|
|
Corrective Action Required
Note W5 on the utility plan specifies a 2 inch line. This shall be specified as copper to the meter, and a minimum of 10 feet beyond the meter as copper. Please revise.
|
|
Corrective Action Required
Rip rap dimensions, including thickness, shall be shown on the plans. Reliance on a formula is not sufficient. Please callout the specific dimensions, including thickness, on the rip rap plans.
|
|
Corrective Action Required
Trenching and backfill detail should be updated to the July 2020 standard of 12 inch aggregate over the top of pipe. Please revise.
|
|
Corrective Action Required
The method of draining the backflow vault sump shall be shown. We have seen the following methods used in the past: 1) daylighting with a small diameter pipe, 2) connection to a storm box, or 3) construction of an infiltration gallery in the form of a 2 foot diameter hole lined with permeable geotextile and filled with clean 3/4 inch rock. In lieu of the above, a sump pump could be installed. Please evaluate and revise as appropriate.
|
|
Corrective Action Required
A single sheet or perhaps two sheets should be prepared for the detention basins. This shall include the plan view, section views of dam/emergency spillway, and the outlet structures. The reason for this consolidation of the detention basin plans is that an occupancy permit cannot be obtained until an as-built detention basin plan has been accepted by the City. Placing these plans on one or two sheets will make it easier to meet this requiremenet post-construction.
|
|
Corrective Action Required
A note should be placed on the detention basin and outlet structure sheets that the detention basins shall be constructed along with the erosion and sediment control devices and measures, and prior to any other activity on the project. In addition, a note shall be provided on these sheets indicating an as-graded and as-built survey shall be submitted and accepted by the City prior to occupancy permit being granted.
|
|
Corrective Action Required
The following information is required on the detention basin sheets: 1) outlet structure details, including flowline elevations of all weirs, orifices, top elevation, bottom elevations, etc., 2) grading plan of the detention basin, 3) 100 year water surface elevation within the basin shown graphically and numerically, 4) 100 year water surface elevation for the 100% clogged/zero available storage event, 5) cross-section of the dam in relation to an emergency spillway, with callouts showing the 100% clogged/zero available storage condition is a minimum of 1.00 feet below the top of the dam, 6) cross-section of the dam showing the 100 year water surface elevation for the nominal condition (i.e., fully-functioning and not clogged) is a minimum of 0.50 feet below the crest of the emergency spillway, 7) bottom of the basin with slope callouts and elevations, 8) 100 year storage volume callouts. These figures shall be compared to the as-built condition prior to issuance of an occupancy permit to determine whether storage volumes have been met, and whether elevations of the outlet works have been met.
|
|
Corrective Action Required
Dimensions shall be shown between the 100 year water surface elevation for the 100% clogged, zero available storage event and any property line or building, and shall be no less than 20 feet.
|
|
Corrective Action Required
A plat is needed to fully-evaluate the alignment of the public sanitary sewer and public water lines to be relocated for this project. The plat is also needed to evaluate the project in terms of other issues including setbacks, easements, etc. Please submit a proposed layout of the plat.
|
|
Corrective Action Required
Concrete low-flow channel is not allowed in the City of Lee's Summit unless a waiver is granted by the City Engineer. Please revise.
|
|
Corrective Action Required
A single 1 inch diameter orifice or 1.5 inch diameter orifice shown for the detention basin outlet structures does not meet the recommendations of the MARC manual. According to guidance supplied in the MARC manual, any calculated orifce less than 4 inches in diameter should utilize a perforated riser or other means to regulate the 90% mean annual event. Please evaluate and revise as appropriate.
|
|
Corrective Action Required
Orifice 2 on the north detention basin outlet structure on Sheet C7.4 does not appear to match the pond setup sheet shown in the report. Please review and revise as appropriate, including a re-run of the routing calculations.
|
|
Corrective Action Required
Concerning the above comment on the 2 inch orifice, is a 2 inch orifice appropriate for both of these outlet structures? This would appear prone to clogging and high maintenance. Please evaluate and revise as appropriate.
|
|
Corrective Action Required
Landscaping Plan: Please show the location of all public water lines and public sanitary sewer lines to ensure a minimum of 5 feet from the mature tree trunk is maintained between the outside of the pipe and any tree trunk.
|
|
Corrective Action Required
Ensure no lighting pole bases are within any City easements. This would appear to be a concern for the north property line, where the new sanitary sewer will be located.
|
|
Corrective Action Required
A curb and gutter detail showing the extension of subgrade (i.e., aggregate base and geotextile) a minimum of 1 foot beyond the back of curb was not shown. Please provide a typical section view showin the minimum 1.0 feet extension beyond the back of curb. Alternatively, you may wish to update the asphaltic concrete and PCC section details to show the section in relation to a curb and gutter, and how the subgrade will be extended a minimum of 1 foot beyond the back of curb. Please evaluate and revise as appropriate.
|
|
Corrective Action Required
Were both discharge pipes from the two detention basins sized to manage the 100 year event? These pipes shall be designed to manage the 100 year event without reliance on the emergency spillway. The emergency spillway shall be utilized only in the event of a storm event that exceeds the 100 year event, or when the outlet works becomes clogged. Please evaluate and revise as appropriate.
|
|
Corrective Action Required
If an emergency spillway(s) is not necessary based on grades (i.e., if overtopping would not lead to a catastrophic failure of the dam due to it being placed within a depression), please discuss in the stormwater reporr. This would include a discussion of the 100 year water surface elevation in relation to the existing grades at the toe of the dam or other considerations. Based on what I can gather from the gradinig plan, it would appear there may be the opportunity to delete the requirement for an emergency spillway, but we will need you to evaluate and make this independent determination based on your design.
|
|
Corrective Action Required
In addition to olevation callouts on the ADA-accessible ramps, slope callouts are required. A maximum cross-slope of 1.50% shall be shown for the sidewalk and ADA-accessible ramps, and no more than 7.50% running slope for the ADA-accessible ramps. Please revise as appropriate.
|
|
Corrective Action Required
The 5 foot minimum width ADA-accessible route across the commercial entrances shall be shown, including width, cross-slope, and elevations. Please revise as appropriate.
|
|
Corrective Action Required
A gate valve is required immediately prior to the backflow vault on the public side. Please revise.
|
|
Corrective Action Required
An itemized and sealed Engineer's Estimate of Probable Construction Costs should accompany your final submittal drawings. Items to include in the estimate are: 1) pavement, 2) aggregate subbase, including the area one (1) foot beyond the back of curb, 3) geogrid, including the area one (1) foot beyond the back of curb, 4) compaction and grading for parking lot, 5) detention basin grading, 6) private storm lines and structures, 7) detention basin outlet structure and piping, 8) sanitary sewer laterals and wyes and tracer wire in accordance with the standard detail, 9) water lines and connections, 10) fire hydrants, 11) sidewalk, 12) ADA-accessible ramps, 13) curb and gutter, 14) rip rap, 15) erosion and sediment control measures and devices, and 16) final restoration including sodding, seeding, topsoil, fertilzer, mulch, and final removal of erosion and sediment control measures and devices.
|
|
|
Fire Review
|
Corrections
|
01/31/2023
|
01/22/2023
|
|
Jim Eden
|
|
Code Statement
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Action required- Show the proposed location of the FDC.
|
|
FDC
Corrective Action Required
IFC 903.3.7 - Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official.
|
|
|
Traffic Review
|
No Comments
|
01/31/2023
|
01/18/2023
|
|
Brad Cooley, P.E., RSPI
|
|
|