Planning Application Status

PL2022034




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2022034
LOT 9 STREETS OF WEST PRYOR
Commercial Final Development Plan
Commercial Final Development Plan
Approved
02/01/2022
CITY OF LEES SUMMIT
Locations
Contacts
CITY OF LEES SUMMIT, Address:220 SE GREEN ST  
SM ENGINEERING, Address:919 W STEWART RD, Phone:(785) 341-9747  
Reviews
Review Type Outcome Est. Completion Date Completed
Planning Review No Comments 02/28/2023 02/27/2023
Hector Soto Jr.
Engineering Review Approved with Conditions 03/14/2022 03/15/2022
Sue Pyles, P.E.
DE Contact Field Eng. Inspector
Corrective Action Required
03/15/2022

Prior to the commencement of any construction activities, the Contractor shall contact Field Engineering Inspections at (816) 969-1200 to coordinate a preconstruction meeting / conference with the assigned Field Engineering Inspector.
DE Engineers Estimate
Corrective Action Required
03/15/2022

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)), and the water tap and meter setup fee have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $70,102.52
DE Future Repair Work
Corrective Action Required
03/15/2022

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
Building Codes Review No Comments 03/14/2022 03/14/2022
Joe Frogge
Miscellaneous Correction
Resolved
03/14/2022

Utility Note #9 on sheet C4.0 shows option of copper or plastic tubing after water meter. Copper piping is required to be connected to meter and extend at least 10' towards building before transitioning to plastic. This will be verified during inspections.
Planning Review No Comments 03/14/2022 03/14/2022
Jennifer Thompson
Traffic Review No Comments 03/14/2022 03/14/2022
Brad Cooley, P.E., RSPI
Fire Review Approved with Conditions 03/14/2022 03/13/2022
Jim Eden
Code Statement
Corrective Action Required
03/08/2022

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code.
Engineering Review Corrections 02/25/2022 02/25/2022
Sue Pyles, P.E.
Corrective Action Required
02/25/2022

General: • Submit an Engineer's Estimate of Probable Construction Costs. • Show location of all oil/gas wells, or indicate none are present, and cite the source. • Show and label the location and limits of the one percent annual chance flood, as set forth on the current FEMA maps, with reference to the panel number and effective date. Elevations shall be provided if shown on the FEMA map. • Please add a note stating that "...all construction shall follow the City of Lee's Summit Design and Construction Manual as adopted by Ordinance 5813. Where discrepancies exist between these plans and the Design and Construction Manual, the Design and Construction Manual shall prevail." • Please add a note stating: “The contractor shall contact the City’s Development Services Engineering Inspection to schedule a pre-construction meeting with a Field Engineering Inspector prior to any land disturbance work at (816) 969-1200.”
Corrective Action Required
02/25/2022

Sheet C3.0: The proposed fire hydrant is noted as “by others” but is included in this plan set. Please revise label.
Corrective Action Required
02/25/2022

Sheet C4.0: • The wye connections and stub will be installed with the public sanitary sewer extensions. Please revise this plan set to show connection to the stubs. • Waterline Sta. 2+14.90 shows a 45 degree bend, but it would appear to need a 90 degree bend. Please revise Plan and Profile views. • The bend shown in the FH label differ between Plan and Profile labels. Please revise.
Corrective Action Required
02/25/2022

Sheet C8.0: • Include the following note on this and any other profile sheet applicable: “Compacted Fill shall be placed to a minimum 18” above the top of the pipe prior to installation.” Show and label the limits of the compacted fill placement in the Profile view. Use hatching for clarity. • Structure B-1 requires a 0.5’ fall across the structure. Please revise.
Corrective Action Required
02/25/2022

Please add trench and backfill detail.
Planning Review Corrections 02/25/2022 02/25/2022
Jennifer Thompson
Corrective Action Required
02/25/2022

All proposed signs require a sign permit to be submitted and approved prior to installation.
Corrective Action Required
02/25/2022

The landscaping requirements haven't been met for all three lots.
Corrective Action Required
02/25/2022

Provide the manufacturer's specifications for all exterior building lighting.
Corrective Action Required
02/25/2022

Just a reminder the minor plat has not been recorded.
Building Codes Review Approved with Conditions 02/25/2022 02/25/2022
Joe Frogge
Miscellaneous Correction
Corrective Action Required
02/25/2022

Utility Note #9 on sheet C4.0 shows option of copper or plastic tubing after water meter. Copper piping is required to be connected to meter and extend at least 10' towards building before transitioning to plastic. This will be verified during inspections.
Traffic Review No Comments 02/25/2022 02/24/2022
Susan Barry, P.E.
Fire Review Approved with Conditions 02/25/2022 02/11/2022
Jim Eden
Code Statement
Corrective Action Required
02/11/2022

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code.
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Final Development Plan fee $725.00 $725.00 Paid 02/24/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home