Planning Application Status

PL2021452




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2021452
Pergola Park 5th Plat - Public Water
Engineering Plan Review
Engineering Plan Review
Approved
11/18/2021
NLV PERGOLA PARK LLC
Locations
Contacts
RUSSELL PEARSON, Address:3152 GRANDSTAND CIR, Phone:(913) 735-9861  
DAVID RINNE, Address:SCHLAGEL ASSOCIATES  
Scott Ready, Phone: 8169691225  
NLV PERGOLA PARK LLC, Address:3152 SW GRANDSTAND CIR  
Reviews
Review Type Outcome Est. Completion Date Completed
Record Drawings Review No Comments 06/03/2023 06/01/2023
Sue Pyles, P.E.
Engineering Review No Comments 09/28/2022 09/15/2022
Sue Pyles, P.E.
Traffic Review No Comments 09/28/2022 09/14/2022
Scott Ready
Engineering Review Corrections 08/29/2022 08/29/2022
Sue Pyles, P.E.
Corrective Action Required
08/29/2022

The road crossing for the 6th Plat connection is acceptable. Please revise the Line 1-Line 3 connection as discussed.
Traffic Review No Comments 08/29/2022 08/17/2022
Scott Ready
Engineering Review Corrections 08/02/2022 08/02/2022
Sue Pyles, P.E.
Corrective Action Required
08/02/2022

Please revise the Line 1 / Line 3 connection location as shown in the attached exhibit in order to eliminate the skewed storm crossing and the need to locate the tee on a slope.
Corrective Action Required
08/02/2022

Please show the storm crossing located just north of the Street A curb inlet in Profile view.
Corrective Action Required
08/02/2022

With the revision to make the Lumberman’s Row water main plan a long dead end, where will the Pergola Park 6th Plat water main extension be connected? It would appear that a line should be extended across Blue Ribbon Lane just north of the roundabout.
Traffic Review No Comments 08/05/2022 07/22/2022
Scott Ready
Engineering Review No Comments 04/12/2022 04/12/2022
Sue Pyles, P.E.
Traffic Review No Comments 04/12/2022 04/06/2022
Brad Cooley, P.E., RSPI
Engineering Review Corrections 03/07/2022 03/07/2022
Sue Pyles, P.E.
Corrective Action Required
03/07/2022

Please replace General Note 13 on Sheet 1 with the following: “The contractor shall contact the City’s Development Services Engineering Inspection to schedule a pre-construction meeting with a Field Engineering Inspector prior to any land disturbance work at (816) 969-1200."
Corrective Action Required
03/07/2022

Please dimension the minimum 6” required below the bottom of the pipe in the Trench and Backfill Detail.
Corrective Action Required
03/07/2022

Please submit an Engineer's Estimate of Probable Construction Costs. The estimate submitted was for the sanitary sewer.
Traffic Review No Comments 03/07/2022 03/07/2022
Brad Cooley, P.E., RSPI
Engineering Review Corrections 12/03/2021 12/03/2021
Sue Pyles, P.E.
Corrective Action Required
12/03/2021

Please submit an Engineer's Estimate of Probable Construction Costs.
Corrective Action Required
12/03/2021

Sheet 1: • KCP&L is now Evergy. Please revise the Utility contacts list accordingly. • Dena Mezger is no longer the Public Works Director. No contact name is necessary, but Michael Park is now the PW Director. • Please replace General Note 13 with the following: “The contractor shall contact the City’s Development Services Engineering Inspection to schedule a pre-construction meeting with a Field Engineering Inspector prior to any land disturbance work at (816) 969-1200.” • Remove the approval signature block for the City. A stamp will be provided electronically when approved.
Corrective Action Required
12/03/2021

Sheets 3-4: • Several areas appear to fail to meet the 42” minimum cover requirement for water lines. Please review and revise as needed. • Horizontal bends are shown in order to meet maximum deflection requirements. Are these requirements being met vertically? If not, vertical bends are required. Please revise as needed. • There is a typo in the Sta. 5+01.16 label in Profile view.
Corrective Action Required
12/03/2021

Sheet 5: • Remove the Trench Check standard detail, it is not used. • Please add a trench/backfill standard detail.
Traffic Review No Comments 12/03/2021 11/29/2021
Brad Cooley, P.E., RSPI
Hearings

There are no hearings for this planning application.

Documents & Images
Date Uploaded File Type Document Name
11/18/2021 Plans 20-189-WAT-FUTURE LAYOUT
11/18/2021 Plans 20-189-WAT (REV0)
12/03/2021 Letter DE-Comment Letter (Engineering Plans)
02/18/2022 Letter Response to Comments dated 12-3-21 for Pergola Park 5th Plat - Water
02/18/2022 Plans 20-189-WAT(rev1)
02/18/2022 Engineers Estimate 20-189-Engineers Cost Estimate
03/07/2022 Letter DE-Comment Letter (Engineering Plans)
04/04/2022 Plans 20-189-WAT (rev2)
04/13/2022 Email PL2021-45s Pergola Park 5th Plat Water Pending Items
07/22/2022 Plans 20-189-WAT (REV3)
07/26/2022 Drawing PP5 Final Water Line Alignment Requirement
08/02/2022 Letter DE-Comment Letter (Engineering Plans)
08/17/2022 Plans 20-189-WAT(REV4)
08/17/2022 Letter Response to Comments dated 8-17-2022 - Water DE-Comment Letter - Engineering Plans
08/29/2022 Letter DE-Comment Letter (Engineering Plans)
09/14/2022 Plans 20-189-WAT (rev6)
09/15/2022 Letter PL2021452 Pergola Park 5th Plat MDNR Conc. Letter WAT Signed
09/15/2022 Engineer Report/Study Pergola Park 5th Plat Water Model
09/19/2022 Activity Document Fees PL2021452 Pergola Park 5th Plat Water
09/19/2022 Email PL2021452 Pergola Park 5th Plat Water Pending Items
10/10/2022 mo1010459-1000134-22-lees-summit-pws-20221007-cp-fa-jackson-dw
10/10/2022 Approved Plans Pergola Park 5th Plat - water Approved 10.10.22
10/11/2022 Letter DE-Engineering Plans Approval Letter
05/17/2023 Plans 20-189-WAT (ASBUILTS)
06/01/2023 Accepted Record Drawings Pergola Park 5th Water AsBuilts Accepted RD
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home