Summary
PL2021416
SUMMIT POINT 2ND PLAT - PUBLIC ROAD PLANS
Engineering Plan Review
Engineering Plan Review
Void
10/21/2021
SUMMIT POINT PHASE II LLC
Locations
Contacts
SUMMIT POINT PHASE II LLC, Address:331 SOQUEL AVE STE 100  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review No Comments 03/28/2022 03/28/2022
Gene Williams, P.E.
Traffic Review No Comments 03/28/2022 03/23/2022
Brad Cooley, P.E., RSPI
Engineering Review Corrections 12/08/2021 12/09/2021
Sue Pyles, P.E.
Corrective Action Required
12/09/2021

Please combine into one complete set of plans. Incorporate all of the cover sheet information, notes, etc. expected in a plan set.
Corrective Action Required
12/09/2021

What is the dashed line approximately 24’ beyond the ROW?
Corrective Action Required
12/09/2021

Show the 15’ U/E on all sheets.
Corrective Action Required
12/09/2021

The erosion and sediment callouts and details are outdated. Please revise the plans to the current standards.
Corrective Action Required
12/09/2021

Please include dimensions on the ADA ramps. These ramps do not require detectable warnings.
Traffic Review No Comments 11/30/2021 11/29/2021
Brad Cooley, P.E., RSPI
Engineering Review Corrections 11/04/2021 11/04/2021
Gene Williams, P.E.
Corrective Action Required
10/26/2021

Sidewalk is shown with 4 foot width. The City of Lee's Summit requires a 5 foot sidewalk. Please revise.
Corrective Action Required
10/26/2021

Pavement section is not in accordance with Design and Construction Manual. Please refer to the Design and Construction Manual for specific requirements for a local access street, and please ensure the typical section view shows the appropriate subgrade design, including either subgrade stabilization or geogrid, along with the respective MoDOT Type 5 aggregate thickness.
Corrective Action Required
10/26/2021

Plans were lacking an erosion and sediment control plan.
Corrective Action Required
10/26/2021

A detailed grading plan was not provided. Please provide a grading plan.
Corrective Action Required
10/26/2021

ADA ramps were not shown with specific details for their construction. Generic ramp details were provided which are not acceptable. Please provide a detail for each ADA-accessible ramp with appropriate elevation callouts, and slope callouts. Please ensure the City requirements of no more than 7.5% running slope and 1.5% cross slope are followed, which are above and beyond the requirements of PROWAG.
Corrective Action Required
10/26/2021

Fire hydrant too close to sidewalk. It appears it will need to be relocated as part of this project. Please show the location where it will be relocated, along with sufficient notes for the contractor/inspector.
Corrective Action Required
10/26/2021

There were numerous strikeovers in plans that are illegible. Please ensure the plans are reviewed in terms of strikeovers.
Corrective Action Required
10/26/2021

Typical pavement section shall show the subgrade design a minimum of 1 foot beyond the back of curb.
Corrective Action Required
10/26/2021

Water line plans are missing, including the relocation of the fire hydrant at the cul-de-sac, and the short extension of the water main to a point just beyond the plat boundary (i.e., near the beginning of the PC of the cul-de-sac bulb). It would appear a short extension of water line is necessary, with relocation of the fire hydrant to a point between the sidewalk and the cul-de-sac, along with all callouts for bends, thrust blocks, and/or straddle blocks and valves.
Corrective Action Required
10/26/2021

Sanitary manhole is in conflict near cul-de-sac. What is the plan for ensuring the manhole frame and lid conforms to ADA requirements within the sidewalk? Can it be adjusted to meet requirements?
Corrective Action Required
10/26/2021

Existing cul-de-sac at end of English Manor Dr. shall be removed as part of this project. This was a temporary turnaround to be removed when a permanent cul-de-sac was installed. Please provide plans for this removal and replacement.
Traffic Review No Comments 11/04/2021 11/03/2021
Brad Cooley, P.E., RSPI
Hearings

There are no hearings for this planning application.

Documents & Images
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home