Planning Application Status

PL2021410




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2021410
Lee's Summit Commerce Center(Logistics) - ESC
Engineering Plan Review
Engineering Plan Review
Complete
10/18/2021
LOWKAP LLC
Locations
Contacts
LOWKAP LLC, Address:12709 WOODWARD ST  
OLSSON ASSOCIATES, Address:1301 BURLINGTON, SUITE 100, Phone:(816) 361-1171  
SCANNELL PROPERTIES #603 LLC, Address:8801 RIVER CROSSING BLVD STE 300  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review No Comments 03/08/2022 03/04/2022
Sue Pyles, P.E.
Engineering Review Corrections 01/28/2022 01/28/2022
Sue Pyles, P.E.
Corrective Action Required
01/28/2022

Sheet LD2.4: • Revise the Erosion Control Notes 1 & 2 to reference Lee’s Summit, not the Unified Government. • Delete Erosion Control Note 10 since there are no sediment traps proposed. • Since the Sediment Fence standard detail includes installation of woven wire fabric for additional strength, please verify that the Reinforced Silt Fence Slope Barrier Detail meets or exceeds the standard detail requirements. Please note that the slice method of installation is required except in locations where impractical.
Corrective Action Required
01/28/2022

Inclusion of pdf sheets 14-24 appear to be for the public street improvements. Please clarify if that work is included in this ESC plan set or not. If so, then there is no need to duplicate standard details.
Engineering Review Corrections 11/10/2021 11/10/2021
Sue Pyles, P.E.
Corrective Action Required
11/10/2021

Please submit: • Engineer's Estimate of Probable Construction Costs. • SWPPP and copy of the MDNR Land Disturbance Permit.
Corrective Action Required
11/10/2021

Include a cover sheet and notes (see other review comments for this development).
Corrective Action Required
11/10/2021

Show the proposed water line(s). Clearly delineate between proposed and existing.
Corrective Action Required
11/10/2021

Please include a specific plan for the diversion berm and other erosion and sediment control features for the RCB construction.
Hearings

There are no hearings for this planning application.

Documents & Images
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home