Review Type |
Outcome |
Est. Completion Date |
Completed |
Fire Review
|
Approved with Conditions
|
11/23/2021
|
11/23/2021
|
|
Jim Eden
|
|
Code Statement
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Information only- Buildings on Lot 9C a 9A may require additional fire protection depending on occupant load and method of construction.
|
|
|
Planning Review
|
Approved with Conditions
|
11/23/2021
|
11/23/2021
|
|
Jennifer Thompson
|
|
Corrective Action Required
The roof line for the PNC building needs to have varying heights, it's completely horizontal.
|
|
|
Engineering Review
|
Approved with Conditions
|
11/23/2021
|
11/22/2021
|
|
Sue Pyles, P.E.
|
|
DE C&O #01 Eng Plans – FDP/PDP
Corrective Action Required
All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final development plan. All public infrastructure must be substantially complete, prior to the issuance of any certificates of occupancy.
|
|
DE C&O #03 Eng & Insp Fees
Corrective Action Required
All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any site development permits or the start of construction (excluding land disturbance permit).
|
|
DE C&O #09 FDP Reviews
Corrective Action Required
Certain aspects of the development plan will be further reviewed during the Final Development Plan phase of the project. This includes detailed aspects of the design to help ensure that the plan meets the design criteria and specifications contained in the Design and Construction Manual.
|
|
DE C&O #11 Pavement Thickness
Corrective Action Required
Private parking lots shall follow Article 8 of the Unified Development Ordinance for pavement thickness and base requirements.
|
|
|
Traffic Review
|
No Comments
|
11/23/2021
|
11/22/2021
|
|
Brad Cooley, P.E., RSPI
|
|
|
Traffic Review
|
Corrections
|
10/29/2021
|
11/02/2021
|
|
Brad Cooley, P.E., RSPI
|
|
Corrective Action Required
Please provide a traffic memo, providing trip generation information for the change in use(s). If 100+ additional trips are anticipated, we will need to amend the traffic impact study.
|
|
|
Fire Review
|
Corrections
|
10/29/2021
|
11/01/2021
|
|
Jim Eden
|
|
FDC
Corrective Action Required
IFC 903.3.7 - Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official.
Action required: Show the locations of the FDC's on the building. The FDC;s on buildings 9A and 9B exceeds 100 feet. Provide a hydrant.
|
|
Code Statement
Corrective Action Required
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
|
|
|
Planning Review
|
Corrections
|
10/29/2021
|
10/29/2021
|
|
Jennifer Thompson
|
|
Corrective Action Required
Elevations were missing for the proposed Crack Shack building.
|
|
Corrective Action Required
The west elevation for the PNC building needs additional vertical/horizontal details and additional increased material changes.
The roof line should have varying heights, it's completely horizontal.
|
|
Corrective Action Required
Provide color renderings for the Chase Bank building.
Label the orientation for each elevation.
Additional materials need to be provided on portions of the elevations, the use of fiber cement paneling is very predominate.
|
|
Corrective Action Required
Is the trash enclosure needed on the eastern portion of the lot?
|
|
Corrective Action Required
Provide the manufacturer's specifications for all exterior building lighting.
|
|
Corrective Action Required
What is the proposed height of the relocated retaining wall?
|
|
Corrective Action Required
Is a minor plat proposed? To date a minor plat subdividing the property into 3 lots has not been submitted.
|
|
Corrective Action Required
All signs require a sign permit and separate review for the proposed site/buildings.
|
|
|
Engineering Review
|
Corrections
|
10/29/2021
|
10/26/2021
|
|
Sue Pyles, P.E.
|
|
Corrective Action Required
Sheet C1.0: KCP&L is now Evergy. Please revise on this sheet and throughout the plan set.
|
|
Corrective Action Required
Alta Survey: The FEMA Firm Panel referenced twice on this sheet is outdated and the Property Description and Surveyor’s General Note 3 are incomplete.
|
|
Corrective Action Required
Sheet C3.0:
• The CG1 label and leaders shown in the parking spaces to the west of the drive thru lanes needs relocated.
• ADA Ramps 1-3 are included in the detail callout list. What about ADA Ramps 4 & 5?
|
|
Corrective Action Required
Sheet C4.0:
• Please remove the text box masking in the north building sanitary main connection label for clarity.
• Please relocate overlapping text within the middle building’s footprint.
• The 8” sanitary sewer line extending from the existing MH to the south will be a public main extension. Please label as such.
• The water meter callout “20B” is not used.
|
|
Corrective Action Required
Sheet C5.0: Please include top and bottom wall elevations.
|
|
Corrective Action Required
Sheets C6.0 and C7.0 may be removed if you should choose to, erosion control is not reviewed with a Preliminary Development Plan.
|
|
Corrective Action Required
Sheet C10.0: The geogrid referenced in the pavement details is not on the City’s approved product list. This will be required at Final Development Plan review.
|
|
|