Review Type |
Outcome |
Est. Completion Date |
Completed |
Engineering Review
|
No Comments
|
01/20/2022
|
01/14/2022
|
|
Sue Pyles, P.E.
|
|
DE C&O #11 Pavement Thickness
Corrective Action Required
Private parking lots shall follow Article 8 of the Unified Development Ordinance for pavement thickness and base requirements.
|
|
DE Contact Field Eng. Inspector
Corrective Action Required
Prior to the commencement of any construction activities, the Contractor shall contact Field Engineering Inspections at (816) 969-1200 to coordinate a preconstruction meeting / conference with the assigned Field Engineering Inspector.
|
|
DE Engineers Estimate
Corrective Action Required
The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)), and the water tap and meter setup fee have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $22,095.92
|
|
DE Future Repair Work
Corrective Action Required
Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
|
|
|
Building Codes Review
|
No Comments
|
01/20/2022
|
01/12/2022
|
|
Mike Weisenborn
|
|
|
Planning Review
|
No Comments
|
01/20/2022
|
01/12/2022
|
|
Mike Weisenborn
|
|
|
Traffic Review
|
No Comments
|
01/20/2022
|
01/12/2022
|
|
Mike Weisenborn
|
|
|
Fire Review
|
Approved with Conditions
|
01/20/2022
|
01/12/2022
|
|
Mike Weisenborn
|
|
Code Statement
Corrective Action Required
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 nternational Fire Code.
|
|
FDC
Corrective Action Required
IFC 903.3.7 - Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official.
Action required- Show the location of the FDC.
|
|
|
Traffic Review
|
No Comments
|
12/30/2021
|
01/07/2022
|
|
Mike Weisenborn
|
|
|
Planning Review
|
No Comments
|
12/30/2021
|
12/27/2021
|
|
Hector Soto Jr.
|
|
|
Engineering Review
|
Approved with Conditions
|
12/30/2021
|
12/22/2021
|
|
Sue Pyles, P.E.
|
|
DE C&O #11 Pavement Thickness
Corrective Action Required
Private parking lots shall follow Article 8 of the Unified Development Ordinance for pavement thickness and base requirements.
|
|
DE Contact Field Eng. Inspector
Corrective Action Required
Prior to the commencement of any construction activities, the Contractor shall contact Field Engineering Inspections at (816) 969-1200 to coordinate a preconstruction meeting / conference with the assigned Field Engineering Inspector.
|
|
DE Engineers Estimate
Corrective Action Required
The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)), and the water tap and meter setup fee have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $22,095.92
|
|
DE Future Repair Work
Corrective Action Required
Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
|
|
|
Building Codes Review
|
No Comments
|
12/30/2021
|
12/21/2021
|
|
Mike Weisenborn
|
|
|
Fire Review
|
Approved with Conditions
|
12/30/2021
|
12/21/2021
|
|
Mike Weisenborn
|
|
Code Statement
Corrective Action Required
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 nternational Fire Code.
|
|
FDC
Corrective Action Required
IFC 903.3.7 - Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official.
Action required- Show the location of the FDC.
|
|
|
Engineering Review
|
Corrections
|
12/21/2021
|
12/20/2021
|
|
Sue Pyles, P.E.
|
|
Corrective Action Required
ADA-accessible sidewalk ramps are required at each of the proposed entrances to the site. Please show throughout the plan set. Specific designs are required for each ramp, please add to the plan set. Update the estimate to include a line item for the 5 ramps on the site.
|
|
|
Fire Review
|
Approved with Conditions
|
12/21/2021
|
12/20/2021
|
|
Jim Eden
|
|
Code Statement
Corrective Action Required
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 nternational Fire Code.
|
|
FDC
Corrective Action Required
IFC 903.3.7 - Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official.
Action required- Show the location of the FDC.
|
|
|
Traffic Review
|
No Comments
|
12/21/2021
|
12/20/2021
|
|
Brad Cooley, P.E., RSPI
|
|
|
Planning Review
|
Corrections
|
12/21/2021
|
12/17/2021
|
|
Hector Soto Jr.
|
|
Corrective Action Required
PARKING LOT SCREENING. It isn't clear how the previous comment made requiring compliance with the parking lot screening requirements of UDO Section 8.820 along both street frontages is being met on the revised landscape plan. "C" under said section provides four options to meet the screening requirement. It does not appear that there is compliance with any of the four screening options.
|
|
|
Building Codes Review
|
No Comments
|
12/21/2021
|
12/16/2021
|
|
Joe Frogge
|
|
Miscellaneous Correction
Update utility plan to show either 1" or 2" tap for water meter. 1-1/2" not available.
|
|
|
Engineering Review
|
Corrections
|
10/12/2021
|
10/13/2021
|
|
Sue Pyles, P.E.
|
|
Corrective Action Required
Additional comments will be sent under separate cover in the next few days regarding Storm Sewer Line C.
|
|
Corrective Action Required
General:
• Submit an Engineer's Estimate of Probable Construction Costs.
• Submit the SWPPP.
• Include City standard details within the plan set.
|
|
Corrective Action Required
Sheet C-001:
• Please revise “Development Plan” to “Final Development Plan” in the project title.
• Please direct questions to the engineer, not the architect, in Construction Note 7.
• Please revise the legal description, the plat name is incorrect.
|
|
Corrective Action Required
Sheet C-201:
• Please either clearly show and label the proposed retaining wall or remove it from the Legend.
• ADA-accessible sidewalk ramps are located at the entrances. Please revise.
• All ADA-accessible ramps must have a specific design detail which must include, at a minimum, the design details specified in Section 5304.8 of the Design and Construction Manual. Elevation call-outs, although required, are not sufficient. Other design details specified in this section are required, including slope call-outs which comply with the criteria listed in Table LS-5, and section views specified in 5304.8. Please note the maximum design slopes allowed by the City are 1.5% and 7.5%.
• Please clarify curb types and locations, several designations are shown. Include standard details for each type.
• The sidewalk is shown narrowing around 2 existing curb inlets. As this creates differential settlement within the sidewalk, please revise the alignment to eliminate this trip hazard.
|
|
Corrective Action Required
Sheet C-301: Please revise overlapping text and graphics at the flume.
|
|
Corrective Action Required
Sheet C-401:
• Please include material size, thickness, gradation information for the flume rip-rap.
• Please delete the “KC-1” reference from the proposed fire hydrant label and include a 6” Gate Valve.
• Label structure B1.
• Update the stationing in the structure EX1 & B2 labels.
• Include installation of a restrained valve and show the material type and size for the proposed fire line.
|
|
Corrective Action Required
Sheet C-411:
• Relocate overlapping text at EX1 in Line A & B Profile views.
• Include design HGLs in all profiles.
• Include the following note on any profile sheet applicable: “Compacted Fill shall be placed to a minimum 18” above the top of the pipe prior to installation.” Show and label the limits of the compacted fill placement in the Profile view. Use hatching for clarity.
|
|
Corrective Action Required
Sheet L-100: Clearly show all public easements. Note that only ornamental tree varieties of trees are allowed in public easements. Please review and revise if needed.
|
|
Corrective Action Required
Please revise C1 from an end section to a field inlet. Connect it to the existing storm sewer pipe that drains to the existing curb inlet. Grading in that area will be required to ensure the adjacent property has adequate drainage to the field inlet. When the storm sewer for this development was designed and constructed, this existing storm sewer line (pipe + end section) was called out as temporary.
|
|
|
Traffic Review
|
No Comments
|
10/12/2021
|
10/12/2021
|
|
Brad Cooley, P.E., RSPI
|
|
|
Planning Review
|
Corrections
|
10/12/2021
|
10/11/2021
|
|
Hector Soto Jr.
|
|
Corrective Action Required
PROPERTY LINE DIMENSIONS. Label the platted property line dimensions along NE McBaine Dr in place of the chord length between the two property corners.
|
|
Corrective Action Required
EASEMENTS.
- Label the existing 15' U/E along the NE McBaine Dr. street frontage.
- Label the existing 20' U/E along the NE Independence Ave street frontage.
|
|
Corrective Action Required
RIGHT-OF-WAY. Correct the labeled ROW widths for both NE McBaine Dr and NE Independence Ave as 60' wide, not 50'.
|
|
Corrective Action Required
DRIVEWAY AND DRIVE AISLE WIDTHS. The two driveway entrances, the internal drives along the east side of the building and internal drive leading to the parking spaces at the southeast building corner are shown as 25' wide from back-of-curb to back-of-curb. Said driveways and internal drive aisles shall be widened to 28' from back-of-curb to back-of-curb in order to meet UDO requirements.
|
|
Corrective Action Required
PARKING LOT SCREENING. The parking lot shall be screened from view along NE McBaine Dr and NE Independence Ave in accordance with UDO Section 8.820.
|
|
Corrective Action Required
MECHANICAL EQUIPMENT. Show the location of all ground-mounted and roof-mounted equipment on the site plan and/or building elevations (by dashing in their location on the elevations) as appropriate for said type of equipment. All ground-mounted equipment shall be fully screened from view using masonry walls or evergreen landscaping at least equal to the height of the equipment at the time of planting. All roof-mounted equipment shall be fully screened from view using parapet walls at least equal to the height of the equipment (please take into account the added height of the curbs onto which the RTUs are placed when determining the parapet wall heights).
|
|
Corrective Action Required
FOUR-SIDED ARCHITECTURE. All sides of a building are required to include similar architectural details, materials and colors. The proposed left side and rear building elevations do not incorporate any projects, contrasting colors or other elements used on the other two building elevations. Horizontal and vertical elements shall be extended on the left side and rear elevations in accordance with UDO Section 8.180.A and B.
|
|
Corrective Action Required
FLAT ROOF. UDO Section 8.180.C.2. requires flat-roofed buildings to incorporate detailed parapets or exaggerated cornice lines to provide architectural relief. No parapet or cornice is provided along the rear building elevation.
|
|
Corrective Action Required
TRASH ENCLOSURE.
- Provide a trash enclosure detail. Each trash enclosure shall be constructed of masonry walls or steel architecturally designed walls with either a solid steel opaque gate painted to be compatible with the color of the masonry or steel walls and building it is to serve or a steel framed semi-opaque gate with a screen mesh material approved by the Director that provides an appropriate visual barrier.
- Each trash enclosure shall be protected through the installation of four-inch bollards along the rear wall of the trash enclosure.
|
|
|
Fire Review
|
Corrections
|
10/12/2021
|
10/07/2021
|
|
Jim Eden
|
|
Code Statement
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 nternational Fire Code.
|
|
FDC
Corrective Action Required
IFC 903.3.7 - Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official.
Action required- Show the location of the FDC.
|
|
|
Building Codes Review
|
Corrections
|
10/12/2021
|
10/07/2021
|
|
Joe Frogge
|
|
Miscellaneous Correction
Corrective Action Required
Update utility plan to show either 1" or 2" tap for water meter. 1-1/2" not available.
|
|
|