PL2021227




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2021227
East Trails Middle School - Sanitary Sewer Upgrades Segment #2
Engineering Plan Review
Engineering Plan Review
Complete
06/22/2021
CITY OF LEES SUMMIT
Locations
Contacts
CITY OF LEES SUMMIT, Address:PO BOX 1600  
THE CITY OF LEES SUMMIT, Address:220 SE GREEN ST  
TURNEY JAMES F & BARBARA L, Address:1251 SE HOOK LN  
CONSTABLE VIVIAN L TRUSTEE OF CONSTABLE VIVIAN L TRUST DATED 3/04/21, Address:12809 RANSON RD  
OLSSON ASSOCIATES, Address:1301 BURLINGTON, SUITE 100, Phone:(816) 361-1171  
Reviews
Review Type Outcome Est. Completion Date Completed
Record Drawings Review No Comments 08/31/2023 08/31/2023
Gene Williams, P.E.
Redesign Review Approved with Conditions 12/30/2021 12/29/2021
Mike Weisenborn
This review was performed by Amanda Bagwell in Water Utilites as it dealt with approval of an alternate design for stream crossing.
Engineering Review No Comments 10/29/2021 10/28/2021
Gene Williams, P.E.
Engineering Review No Comments 09/03/2021 09/02/2021
Gene Williams, P.E.
Engineering Review Corrections 08/02/2021 08/02/2021
Gene Williams, P.E.
Corrective Action Required
08/02/2021

Railroad concurrence shall be required prior to installation of the railroad crossing. For purposes of approval, the railroad portion is acceptable to the City, and it is recommended this portion of the plans be submitted to the railroad.
Corrective Action Required
08/02/2021

Is a USACE permit being acquired for the project? Is it required? If so, a copy of the permit shall be submitted prior to approval.
Corrective Action Required
08/02/2021

Floodwater Elevation: tops of manholes shall extend a minimum 1'-0" above the calculated 100-year floodwater elevation, provided that such extension shall not exceed 4 feet above final finish grade. Where these requirements result in a manhole with a rim at or below the 100-year floodwater elevation, the manhole shall be equipped with watertight ring and bolt-downcover assembly with neoprene gaskets. It appears some of the manholes are extended as high as desired by Water Utilities, but are below the 100 year water surface elevation, or do not extend the minimum distance of 1.0 feet. This would include manholes 56-006, 007, 008, 009, 010, and 011.
Corrective Action Required
08/02/2021

Anywhere ductile iron pipe is specified, it shall conform to the ductile iron specfications contained within the Design and Construction Manual. Currently, the City only allows zinc-coated ductile iron pipe.
Corrective Action Required
08/02/2021

It is unclear whether the stream channel flowline is being altered in terms of elevation. Is rock liner being installed beneath the existing stream flowline? This will have a direct bearing on the location of the sanitary line in order to achieve minimum depth of cover. If the dashed line represents the existing stream flowline, the depth of cover appears sufficient.
Corrective Action Required
08/02/2021

Manhole 47-069 is shown with insufficient drop across the manhole. A minimum of 0.5 feet is required.
Corrective Action Required
08/02/2021

Are there other manhole rims that do not meet the 1.0 feet of freeboard requirement between the calculated 100 year water surface elevation and the top of the rim? If so, please see previous comment for guidance.
Corrective Action Required
08/02/2021

Recommend evaluating the casing carrier pipe requirement prior to submittal to the railroad. A portion is "x'ed" out, and might generate additional delays by the railroad. The City is ok with the alignment under the railroad, but shall yield to any requirements mandated by them.
Hearings

There are no hearings for this planning application.

Documents & Images
Date Uploaded File Type Document Name
07/15/2021 Plans 21-07-15_ Technical Specs Combined
08/02/2021 Letter DE-Comment Letter (Engineering Plans)
08/20/2021 Letter 21-08-20_DE-Comment Letter (Engineering Plans)_Olsson Response
09/02/2021 Email STKY APPROVAL CONDITIONS
10/15/2021 Plans 21-10-14_Interceptor Sewer Upsizing-REV 2-Sealed
10/22/2021 Activity Document MDNR Concurrence Letter SANSegment2 (002)
10/25/2021 Activity Document Sanitary Sewer Turney
10/25/2021 Activity Document Temporary Construction Turney
10/25/2021 Activity Document Constable SSE Signed
10/25/2021 Activity Document Constable TCE Signed
11/01/2021 Activity Document City Reimbursement Update 10-08-21
11/01/2021 Engineers Estimate Big Creek Interceptor Bid Form
11/01/2021 Engineers Estimate Big Creek interceptor Proposal
11/01/2021 Activity Document 2021 Nationwide Permit General Conditions
11/01/2021 Activity Document 3287-12 - City of Lees Summit - Pipeline - Sedalia Sub - Lees Summit, Jackson, MO
11/01/2021 Activity Document MO_RegCon (1)
11/04/2021 Activity Document LSMS#4 - Interceptor Schedule
11/12/2021 Activity Document FeeWorksheetSeg2InterceptorUpgrade
11/16/2021 Plans ESC_Interceptor Sewer Upsizing
11/17/2021 Email RFI Requiest PL2021227 New Lee's Summit Middle School #4 - Interceptor Sewer
11/17/2021 Email WU RFI Response PL2021227 New Lee's Summit Middle School #4 - Interceptor Sewer
11/19/2021 Activity Document MDNR BigCreek_MO0058629_20211119_MOGSE0295_CP
11/30/2021 Activity Document 20211130094535400
12/29/2021 Specifications 21-12-28_WTWW_Technical Specs Combined_Sealed
12/29/2021 Plans 21-12-29_WTWW_Interceptor Sewer Upsizing-Rev 4_Sealed
12/29/2021 Email Email from WU approving the alternate stream crossing design
06/22/2022 Activity Document City Reimbursement Update 06-22-22
08/31/2023 Accepted Record Drawings ACCEPTED RECORD DRAWING
08/24/2023 Plans 23-07-25_WTWW_Interceptor Sewer Upsizing-ASBUILTS_Flattened
11/23/2021 Ordinance 9276 License Agreement
11/23/2021 Ordinance 9291 License Agreement 1st Amendment
11/17/2021 Email NO USACE PERMIT REQUIRED EMAIL STRING
12/30/2021 Approved Plans East Trails Middle School Interceptor Sewer Upsizing Revision Approved 12.30.21
01/04/2022 Email REVISION APPROVAL LETTER EMAIL
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home