Planning Application Status

PL2020363




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2020363
Paragon Star Village - Lot 20 / HUB Building
Commercial Final Development Plan
Commercial Final Development Plan
Withdrawn
12/04/2020
CITY OF LEES SUMMIT
Locations
Contacts
PARAGON STAR LLC, Address:4025 NE LAKEWOOD WAY, Unit 250, Phone:(816) 207-4500  
LAND3 STUDIO, LLC, Address:317 SE MAIN ST, Unit A, Phone:(816) 207-6019  
CITY OF LEES SUMMIT, Address:PO BOX 1600  
GEORGE BUTLER ASSOCIATES INC, Address:9801 RENNER BLVD, Phone:(913) 492-0400  
HAPPY VALLEY PROPERTIES LLC, Address:801 NW COMMERCE DR  
Reviews
Review Type Outcome Est. Completion Date Completed
Planning Review Approved with Conditions 04/07/2021 04/07/2021
Jennifer Thompson
Corrective Action Required
04/07/2021

The overall replatting of the Paragon Star development remains to be completed. Additional discussion is needed whether or not a building permit could be issued for this project prior to the plats being recorded.
Engineering Review Approved with Conditions 04/07/2021 04/06/2021
Sue Pyles, P.E.
DE C&O #11 Pavement Thickness
Corrective Action Required
04/06/2021

Private parking lots shall follow Article 8 of the Unified Development Ordinance for pavement thickness and base requirements.
DE Contact Field Eng. Inspector
Corrective Action Required
04/06/2021

Prior to the commencement of any construction activities, the Contractor shall contact Field Engineering Inspections at (816) 969-1200 to coordinate a preconstruction meeting / conference with the assigned Field Engineering Inspector.
DE Engineers Estimate
Corrective Action Required
04/06/2021

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)), and the water tap and meter setup fee have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $81,092.00
DE Future Repair Work
Corrective Action Required
04/06/2021

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
Building Codes Review No Comments 04/07/2021 03/31/2021
Mike Weisenborn
Traffic Review No Comments 04/07/2021 03/31/2021
Mike Weisenborn
Fire Review Approved with Conditions 04/07/2021 03/31/2021
Mike Weisenborn
Code Statement
Corrective Action Required
03/31/2021

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Traffic Review No Comments 03/30/2021 03/30/2021
Mike Weisenborn
Planning Review Corrections 03/30/2021 03/30/2021
Jennifer Thompson
Corrective Action Required
03/30/2021

The UDO requires trash enclosure areas to be improved with a Portland cement concrete pad and a Portland cement concrete approach 30 feet in length, measured from the enclosure opening. I apologize, I overlooked this on first submittal review.
Corrective Action Required
03/30/2021

The overall replatting of the Paragon Star development remains to be completed. The plats are scheduled for Planning Commission on April 8, 2021. Additional discussion is needed whether or not a building permit could be issued for this project prior to the plats being recorded.
Engineering Review Corrections 03/30/2021 03/30/2021
Sue Pyles, P.E.
Corrective Action Required
03/30/2021

Submit an Engineer's Estimate of Probable Construction Costs.
Fire Review Approved with Conditions 03/30/2021 03/26/2021
Jim Eden
Code Statement
Corrective Action Required
03/30/2021

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Building Codes Review No Comments 03/30/2021 03/23/2021
Joe Frogge
Planning Review Corrections 12/18/2020 12/18/2020
Jennifer Thompson
Corrective Action Required
12/17/2020

CG-1 curbing is required around the entire parking/drive aisle areas. It's noted there is no curbing shown on the south portion of the site. Please revise.
Corrective Action Required
12/17/2020

The Unified Development Ordinance requires all roof top units to be screened via a parapet wall. The proposed perforated metal screening would require a modification to the ordinance. Please revise the elevations.
Corrective Action Required
12/18/2020

The overall replatting of the Paragon Star development remains to be completed.
Engineering Review Corrections 12/18/2020 12/17/2020
Sue Pyles, P.E.
Corrective Action Required
12/16/2020

The FDP boundary shown on Sheet C001 doesn’t match the extent of the proposed work included in the plan set. Please rectify.
Corrective Action Required
12/16/2020

There are so many hatchings and shadings used it is difficult to differentiate between what they are all showing. This is especially true when grading, elevations, dimensions, or anything else specific is added to the mix. Please more clearly show the information and make sure all hatching is used is included in the Legend.
Corrective Action Required
12/16/2020

Please label the proposed retaining wall to clearly indicate it is not included in this project.
Corrective Action Required
12/16/2020

Include water meter size.
Corrective Action Required
12/16/2020

The pipe lengths shown in Water Line Construction Notes W1 and W4 appear incorrect. Please verify and revise as needed.
Corrective Action Required
12/16/2020

Please remove the Modular Block Retaining Wall detail. If a FH is added, please include the appropriate standard detail.
Traffic Review No Comments 12/18/2020 12/17/2020
Michael Park
Fire Review Corrections 12/18/2020 12/15/2020
Jim Eden
Code Statement
Corrective Action Required
12/15/2020

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
FDC
Corrective Action Required
12/15/2020

IFC 903.3.7 - Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official. Action required- Show the location of the FDC and provide a hydrant within 100 feet.
Building Codes Review No Comments 12/18/2020 12/10/2020
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Final Development Plan fee $600.00 $600.00 Paid 12/07/2020
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Date Uploaded File Type Document Name
12/04/2020 Plans 2020_12_04_PSVILLAGE_LOT20_HUB
12/04/2020 Engineer Report/Study 2020_12_4 Paragon Star Hub Final Storm Letter
12/07/2020 Receipt Receipt for transaction:2020-007881
12/07/2020 Application Form Checklist
12/07/2020 Application Form Paragon Star - Final Development Plan Application
12/18/2020 Letter Applicant Letter - FDP (DFDP)
03/22/2021 Plans 2021_03_22_RESUBMITTAL_DRAWINGS
03/22/2021 Letter 2021_03_22_RESUBMITTAL_Comments Response
03/30/2021 Letter Applicant Letter - FDP (DFDP)
03/31/2021 Plans 2021_03_31_LOT20_RESUBMIT
03/31/2021 Engineers Estimate 2021_3_31 Village Hub Estimate
03/31/2021 Letter 2021_3_31 Village Hub FDP Comments Response
04/07/2021 Letter Applicant Letter - FDP (DFDP)
04/12/2021 Activity Document Fees PL2020363 Paragon Star Village Lot 20 HUB Building FDP
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home