Review Type |
Outcome |
Est. Completion Date |
Completed |
Planning Review
|
No Comments
|
10/09/2020
|
10/07/2020
|
|
Shannon McGuire
|
|
|
Engineering Review
|
Approved with Conditions
|
10/09/2020
|
10/06/2020
|
|
Loic Nguinguiri, E.I.
|
|
DE Future Repair Work
Corrective Action Required
Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
|
|
DE Engineers Estimate
Corrective Action Required
The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)), and the water tap and meter setup fee have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $550.30
|
|
DE Contact Field Eng. Inspector
Corrective Action Required
Prior to the commencement of any construction activities, the Contractor shall contact Field Engineering Inspections at (816) 969-1200 to coordinate a preconstruction meeting / conference with the assigned Field Engineering Inspector.
|
|
DE C&O #11 Pavement Thickness
Corrective Action Required
Private parking lots shall follow Article 8 of the Unified Development Ordinance for pavement thickness and base requirements.
|
|
|
Traffic Review
|
No Comments
|
10/09/2020
|
10/06/2020
|
|
Michael Park
|
|
|
Building Codes Review
|
No Comments
|
10/09/2020
|
10/05/2020
|
|
Joe Frogge
|
|
|
Fire Review
|
No Comments
|
10/09/2020
|
10/05/2020
|
|
Jim Eden
|
|
|
Building Codes Review
|
No Comments
|
09/24/2020
|
09/24/2020
|
|
Dawn Bell
|
|
|
Engineering Review
|
Corrections
|
09/24/2020
|
09/24/2020
|
|
Loic Nguinguiri, E.I.
|
|
Corrective Action Required
Please add the owner/developer direct phone number.
|
|
Corrective Action Required
It appears the dimensions for pavement and aggregate thicknesses have been reversed. Therefore, the concrete pavement detail does not meet the City’s parking lot pavement requirements, found in Section 8.620 of the Unified Development Ordinance. Please revise accordingly.
|
|
Corrective Action Required
On the EOOPCC, costs for both concrete paving and MoDOT aggregate appear low. Please check and revise as necesary.
|
|
|
Planning Review
|
Corrections
|
09/24/2020
|
09/22/2020
|
|
Shannon McGuire
|
|
Corrective Action Required
Please provide a signed application and a signed/notarized ownership affidavit from. The documents that were resubmitted are still lacking the required signatures and notarization.
|
|
Corrective Action Required
Please provide the manufacture speciation sheet for the proposed overhead door.
|
|
|
Fire Review
|
No Comments
|
09/24/2020
|
09/21/2020
|
|
Jim Eden
|
|
|
Traffic Review
|
No Comments
|
09/24/2020
|
09/17/2020
|
|
Michael Park
|
|
|
Engineering Review
|
Corrections
|
09/11/2020
|
09/11/2020
|
|
Loic Nguinguiri, E.I.
|
|
Corrective Action Required
On the cover sheet, please include the following items:
o “Cosentinos - Warehouse modification” as project name
o Developer’s contact information
o Table of contents
|
|
Corrective Action Required
Please seal and sign the set of plans.
|
|
Corrective Action Required
Please provide an Engineer’s Opinion of Probable Construction Cost (EOOPCC) sheet.
|
|
Corrective Action Required
Please include the CG-1 curb construction standard detail.
|
|
Corrective Action Required
Please revise general note to mention “Article 8” instead of “Article 12”, on to the cover sheet.
|
|
Corrective Action Required
Show location of all oil/gas wells, or indicate none are present, and cite the source.
|
|
Corrective Action Required
Plan view calls for new asphalt pavement but pavement detail shows new concrete pavement. Please clarify which one is intended to be installed and revise plan, as needed.
|
|
Corrective Action Required
Please make sure to show proper drainage on-site along with spot elevations.
|
|
|
Planning Review
|
Corrections
|
09/11/2020
|
09/10/2020
|
|
Shannon McGuire
|
|
Corrective Action Required
Please provide a signed application and a signed/notarized ownership affidavit from.
|
|
Corrective Action Required
Please provide the location of all oil and/or gas wells within the subject property. If none are present please add a note stating such and cite your source of information.
|
|
Corrective Action Required
Will there be any new lighting? If so please show the location, height, intensity and type of outside lighting fixtures. Also please provide a photometric diagram indicating the foot candle levels throughout the site and at the property lines and the manufacturer’s specification sheets for proposed exterior lighting.
|
|
Corrective Action Required
Will any existing landscaping (shrubs or trees) be removed. If so please provide a landscaping plan that shows the landscaping to be removed and where it will be replaced.
|
|
Corrective Action Required
Please provide a standard detail for the proposed CG-1 curb.
|
|
Corrective Action Required
Please provide elevations of the building showing the proposed new overhead door, including notation indicating building materials to be used.
|
|
|
Fire Review
|
No Comments
|
09/11/2020
|
09/10/2020
|
|
Jim Eden
|
|
|
Traffic Review
|
No Comments
|
09/11/2020
|
08/31/2020
|
|
Michael Park
|
|
|
Building Codes Review
|
No Comments
|
09/11/2020
|
08/28/2020
|
|
Joe Frogge
|
|
|