Planning Application Status

PL2020044




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2020044
AUTOMOTIVE SALES AND DETAIL CENTER
Commercial Preliminary Development Plan
Commercial Preliminary Development Plan
Approved
02/21/2020
LEES SUMMIT TOWN CENTRE LLC
Locations
Contacts
LEES SUMMIT TOWN CENTRE LLC, Address:6515 GRAND TETON PLZ STE 300  
LEES SUMMIT TOWN CENTRE LLC, Address:6515 GRAND TETON PLZ STE 300  
DAVIDSON ARCHITECTURE & ENGINEERING, Address:4301 INDIAN CREEK PKWY, Phone:(913) 451-9390  
Not shown for privacy reasons.
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review Approved with Conditions 03/31/2020 03/31/2020
Sue Pyles, P.E.
Miscellaneous Correction
Corrective Action Required
03/31/2020

Revise the project name to “Automotive Sales and Detail Center” on the cover sheet and in the title block on all sheets prior to Planning Commission.
Miscellaneous Correction
Corrective Action Required
03/31/2020

Revise the Stormwater Report to reflect the requirements of APWA Section 5601.5.A.4.a, Default Strategy – Comprehensive Protection, with release rates as indicated in Section 5608.4.C.1. As it appears there is sufficient area to revise the detention basin should the change to the Comprehensive Protection method require, the preliminary report is acceptable for this Preliminary Development Plan. This revision will be required with the Final Development Plan submittal.
Miscellaneous Correction
Corrective Action Required
03/31/2020

The sheet reference in General Note 1 on Sheet C1.2 is incorrect, as are the “Standard Pavement with Curb” detail sections shown on Sheet C1.2. Please revise with the Final Development Plan submittal.
DE C&O #01 Eng Plans – FDP/PDP
Corrective Action Required
03/31/2020

All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final development plan. All public infrastructure must be substantially complete, prior to the issuance of any certificates of occupancy.
DE C&O #03 Eng & Insp Fees
Corrective Action Required
03/31/2020

All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any infrastructure permits or the start of construction (excluding land disturbance permit).
DE C&O #06 Land Disturbance
Corrective Action Required
03/31/2020

A Land Disturbance Permit shall be obtained from the City if ground breaking will take place prior to the issuance of an infrastructure permit, building permit, or prior to the approval of the Final Development Plan / Engineering Plans.
DE C&O #09 FDP Reviews
Corrective Action Required
03/31/2020

Certain aspects of the development plan will be further reviewed during the Final Development Plan phase of the project. This includes detailed aspects of the design to help ensure that the plan meets the design criteria and specifications contained in the Design and Construction Manual.
DE C&O #11 Pavement Thickness
Corrective Action Required
03/31/2020

Private parking lots shall follow Article 8 of the Unified Development Ordinance for pavement thickness and base requirements.
Traffic Review Approved with Conditions 03/31/2020 03/31/2020
Michael Park
Corrective Action Required
03/31/2020

Sidewalk needed on the north side of the driveway along Independence Ave to the property line.
Planning Review Approved with Conditions 03/31/2020 03/30/2020
Hector Soto Jr.
Corrective Action Required
03/30/2020

PAVEMENT. The shading used on Sheet C1.2 identifies heavy duty pavement used for the parking spaces and standard duty asphalt used for all of the drive aisles. This needs to be reversed. This revision will be picked up on the final development plan.
Corrective Action Required
03/30/2020

EXTERIOR BUILDING MATERIALS. - THE FOLLOWING COMMENT FROM THE INITIAL COMMENT LETTER IS RETAINED FOR INFORMATIONAL PURPOSES: Because the subject property is zoned commercially (CP-2), the use of metal as an exterior building material is limited to incidental use unless specifically approved by the City Council. Historically, the use of metal in non-industrial zoning districts has only been approved for architectural-grade metal products such as ACM. The proposed ribbed and textured metal wall panel materials appear to be standard industrial-type metal panel systems. - Staff acknowledges the statement in the applicant's response letter that material samples for the two proposed metal panels shall be submitted for review at such time as City Hall is re-opened to staff and the public. - The applicant's response letter states that the textured stucco finished flat metal wall panel has been utilized at the Shamrock Business Park. To staff's point and concern mentioned in the first comment that this appears to be an industrial-type material rather than a material used in commercial areas, Shamrock Business Park is an industrial area in the city. But staff will reserve making a final recommendation on both metal panel systems until such time as a material sample can be provided.
Fire Review Approved with Conditions 03/31/2020 03/26/2020
Jim Eden
Code Statement
Corrective Action Required
03/31/2020

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Misc.
Resolved
03/26/2020

An automatic fire sprinkler system is required.
FDC
Resolved
03/26/2020

IFC 903.3.7 - Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official. Actio required/: Show the location of the FDC and the fire hydrant within 100'.
Hydrants
Resolved
03/26/2020

IFC 507.5.1 - Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 300 feet from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the fire code official.
Traffic Review Corrections 03/06/2020 03/06/2020
Mike Weisenborn
Corrective Action Required
03/03/2020

The PDP should illustrate the location of existing driveways along the east side of Independence Ave. It appears the proposed driveway aligns with existing in compliance with code.
Corrective Action Required
03/03/2020

Sidewalk is required along Independence Ave. and Town Center Drive within the property limits.
Corrective Action Required
03/03/2020

Is there an associated Conceptual Plan Application with this PDP or is the illustration included in the submittal only for representation of how this PDP is not influenced nor influencing the develpoment of surrounding property? If a Concept Plan Application is required, a traffic impact study is needed for review and would include a separate phase for the PDP. A concept plan should generally depict the City planned/designed roundabout at the intersection of Independence Ave. and Town Centre Blvd.
Planning Review Corrections 03/06/2020 03/06/2020
Hector Soto Jr.
Corrective Action Required
03/06/2020

TITLE BLOCK. All of the plan sheets are labeled with "A Preliminary Concept". They need to be re-labeled as Preliminary Development Plan. However, Sheet A1.0 should remain labeled as a concept plan because the intent is to show how the remaining surrounding property could develop, rather than serving as a plan for approval of the larger area.
Corrective Action Required
03/06/2020

PAVEMENT. The shading used on Sheet C1.2 to identify the proposed standard and heavy duty asphalt pavement is mistakenly reversed from that shown in the Construction Legend.
Corrective Action Required
03/06/2020

DRIVE WIDTHS. All driveway entrances to the site and internal drive aisles shall have a minimum pavement width of 24', excluding curb and gutter. All driveway entries have 22' wide pavement. All internal drive aisle entries flanked by landscape islands on one or both sides also have only 22' wide pavement.
Corrective Action Required
03/06/2020

SIDEWALKS. 5' sidewalks shall be provided along both the NE Town Centre Dr and NE Independence Ave street frontages.
Corrective Action Required
03/06/2020

LANDSCAPE PLAN. The Landscape Requirements table at the lower left-hand side of Sheet L1.1 incorrectly lists the building footprint area as 12,262 sq. ft. Correct it to read 12,862 sq. ft.
Corrective Action Required
03/06/2020

EASEMENTS. Show and label all existing and proposed utility easements on the property.
Corrective Action Required
03/06/2020

EXTERIOR BUILDING MATERIALS. Because the subject property is zoned commercially (CP-2), the use of metal as an exterior building material is limited to incidental use unless specifically approved by the City Council. Historically, the use of metal in non-industrial zoning districts has only been approved for architectural-grade metal products such as ACM. The proposed ribbed and textured metal wall panel materials appear to be standard industrial-type metal panel systems. Submit material samples for review.
Engineering Review Corrections 03/06/2020 03/05/2020
Sue Pyles, P.E.
Corrective Action Required
03/05/2020

General: • Show and label the 100-year WSE and emergency spillway location throughout the plan set. • Please note that the detention basin 100-year WSE must be located a minimum of 20’ from the property line. • Include information in the plans indicating the existing pond will be removed.
Corrective Action Required
03/05/2020

Sheet C1.0: • Revise as needed so the Project Title on this sheet, the title blocks of all sheets, and the application all match. • Revise the Sheet Index to match the sheet numbers and descriptions for all sheets in the submitted plan set. Remove duplicate sheets and update sheet numbers as needed.
Corrective Action Required
03/05/2020

Sheet C1.2: • Include a construction note with callouts for the 3 commercial entrances. • Revise the Construction Notes sheet references, they are incorrect. • Revise “Cirt” to “City” in Construction Note 7. • Construction Notes 10 & 11 have been omitted from the Plan view. Please revise. • A 30’ section of concrete pavement is required, as measured from the enclosure doors. Please revise to meet this requirement. • The first two General Notes are not applicable for this City. Please remove. • Revise the “Kansas” to “Missouri” in the survey General Note. • Show and label existing storm sewer, sanitary sewer, and water line infrastructure on this sheet and throughout the plan set.
Corrective Action Required
03/05/2020

Sheet C1.3: • The existing sanitary sewer that runs along the south edge of this property is a private 2” low pressure system. In order to connect to it, you would need to submit permission from the owners of the system as well as a sanitary sewer analysis of the system for review and approval. Alternately, it would perhaps be a much better option to connect to the existing public gravity sanitary sewer just west of the west proposed entrance. Revise plans accordingly. • The existing water main along the south edge of the property is a 12”, not 8”, main. Please revise accordingly. • Water meter size and location will be reviewed with the Final Development Plan phase of the project. • A storm sewer is shown along the east edge of the property. Is this existing or proposed? • The scale shown is labeled incorrectly. Please revise.
Corrective Action Required
03/05/2020

Sheets C2.2-C2.3: Erosion and Sediment Control will be reviewed with the Final Development Plan phase of the project. Please remove these sheets from this plan set.
Corrective Action Required
03/05/2020

Sheet C2.4: Label the swale location in Plan view.
Corrective Action Required
03/05/2020

Sheet C3.1: • The Existing Drainage Area Map is incomplete. There is an existing pond to the west that drains thru this site, and the area to the west is not shown at all. Please revise. • Show and label the existing pond. • Remove all proposed features from the existing condition map.
Corrective Action Required
03/05/2020

Sheet C3.2: The Proposed Drainage Area Map does not show the offsite drainage impacting the site, please revise.
Corrective Action Required
03/05/2020

Sheet C3.3: The storm sewer Plan and Profile will be reviewed with the Final Development Plan phase of the project.
Corrective Action Required
03/05/2020

Sheets C4.1-C4.3: Standard details will be reviewed with the Final Development Plan phase of the project. Please note that the pavement sections provided do not meet the City’s requirements. Please revise prior to submitting the Final Development Plan.
Corrective Action Required
03/05/2020

Stormwater Report: • The “Stormwater Report – Detail Center” dated Feb. 20, 2020 was incomplete. The following items were missing from the report: 1. An existing condition drainage area map, with points of interest identified where sheet flow converges to concentrated flow 2. A post-developed drainage area map with points of interest as identified above 3. Discussion within the body of the report concerning the emergency spillway design, including the required freeboard of 0.5 feet minimum from the 100 year water surface elevation, and the crest of the emergency spillway, as well as a discussion of the clogged condition and zero available storage freeboard requirement of 1.0 feet from the top of the dam 4. Discussion within the report concerning the off-site contributors to stormwater flow, including how the off-site drainage from the pond to the west will be managed, including any private easements which must be granted, additional storm line to install, etc. 5. Discussion within the report of allowable peak flow release rates, water quality design, and how post-development release rates compare to the allowable. 6. Discussion of the proposed outlet structure and how the existing stormwater infrastructure might be utilized. 7. Discussion of any waivers that would be required for drainage areas and points of interest which do not follow the Design and Construction Manual regarding the allowable peak flow rates for the various storm events. 8. Discussion of the existing pond and it’s mitigation. • The report makes multiple references to the 1-year event, which is not required. Please replace with the 2-year event. • Please coordinate revisions to the plans with revisions to this report. • As discussed above, the report is incomplete, and no further review is being provided at this time.
Fire Review Corrections 03/06/2020 03/02/2020
Jim Eden
Code Statement
Corrective Action Required
03/02/2020

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Misc.
Corrective Action Required
03/02/2020

An automatic fire sprinkler system is required.
FDC
Corrective Action Required
03/02/2020

IFC 903.3.7 - Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official. Actio required/: Show the location of the FDC and the fire hydrant within 100'.
Hydrants
Corrective Action Required
03/02/2020

IFC 507.5.1 - Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 300 feet from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the fire code official.
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Commercial Preliminary Development Plan fee $1,800.00 $1,800.00 Paid 02/21/2020
9110076-Legal Notice Publishing Charge $165.00 $165.00 Paid 02/21/2020
9110076-Legal Notice Publishing Charge $165.00 $165.00 Paid 02/21/2020
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Planning Commission Meeting 05/14/2020 05:00 PM Council Chambers 05/14/2020 05:00 PM
Public Hearing Review
Approved
05/14/2020
City Council Public Hearing 06/09/2020 06:15 PM Council Chambers 06/09/2020 06:15 PM
Public Hearing Review
Approved
06/02/2020
City Council Ordinance 2nd Reading 06/16/2020 06:15 PM Council Chambers 06/16/2020 06:15 PM
Public Hearing Review
Approved
Documents & Images
Date Uploaded File Type Document Name
02/21/2020 19076 A1.1
02/21/2020 19076 A3.1
02/21/2020 19076 A3.2
02/21/2020 19076 L1.1
02/21/2020 19076.CSheetsPDP.02.21.2020
02/21/2020 19076.DrainageReport.02.20.2020
02/21/2020 20163PH-PH1
02/21/2020 Detail Center elevations A3.1 color
02/21/2020 Legal Description
02/21/2020 19076 A1.0
02/21/2020 Letter Routing Sheet
02/21/2020 Receipt Receipt for transaction: 2020-000765
03/06/2020 Letter Applicant Letter - Dev. Apps (DRCP)
03/10/2020 Plans Subaru Sanitary
03/23/2020 Letter 19076.DetailFacility.ResponseLetter.03.23.2020
03/23/2020 Public Notice Document Balderston Detail Center Neighborhood meeting information
03/23/2020 Plans MBCI 7.2 horizontal ribbed wall panel photos
03/23/2020 Plans Textured stucco finish flat metal wall panel sample and photos
03/23/2020 Plans 2020-03-24 Detail Center PDP Drawings revision 1
03/23/2020 Engineer Report/Study 19076.DrainageReport.03.23.2020
03/31/2020 Email PROJECT TITLE EMAIL
03/31/2020 Letter Applicant Letter - Dev. Apps (DRCP)
04/01/2020 Photograph LS Volkswagen metal panel
04/21/2020 Letter ASDC May 14th Zoom Notice
05/07/2020 Drawing Location Map
05/07/2020 Engineer Report/Study PL2020044 Automotive Detail Center TIA
05/07/2020 Engineer Report/Study Drainage Report 03.23.2020_text only
05/07/2020 Engineer Report/Study PL2020044 Automotive Detail Center TIA
05/08/2020 Letter PC Staff Report
05/12/2020 Letter Packet Information Form
06/02/2020 Activity Document Staff Presentation
04/05/2022 Ordinance 8896 Executed Ordinance
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home