Planning Application Status

PL2020036




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2020036
MID-CONTINENT PUBLIC LIBRARY - COLBERN RD
Commercial Final Development Plan
Commercial Final Development Plan
Approved
02/21/2020
MID CONTINENT PUBLIC LIBRARY
Locations
Contacts
MID CONTINENT PUBLIC LIBRARY, Address:15616 E US 24 HWY  
JE DUNN CONSTRUCTION CO, Address:120 S CENTRAL AVE STE 350, Phone:(816) 474-8600  
OLSSON ASSOCIATES (BRIAN LADD), Address:7301 W 133RD ST, SUITE 200, Phone:(913) 748-2550  
SAPP DESIGN ARCHITECTS, Address:3750 S FREMONT, Phone:(417) 877-9600  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review No Comments 05/11/2021 05/10/2021
Sue Pyles, P.E.
DE C&O #11 Pavement Thickness
Corrective Action Required
05/06/2021

Private parking lots shall follow Article 8 of the Unified Development Ordinance for pavement thickness and base requirements.
DE Contact Field Eng. Inspector
Corrective Action Required
05/06/2021

Contact the Field Engineering Inspector at (816) 969-1200 at least 48 hours prior to the onset of construction.
DE Engineers Estimate
Corrective Action Required
05/06/2021

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)), and the water tap and meter setup fee have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $34,761.24
DE Future Repair Work
Corrective Action Required
05/06/2021

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
Engineering Review Corrections 04/23/2021 04/23/2021
Sue Pyles, P.E.
DE C&O #11 Pavement Thickness
Corrective Action Required
04/20/2021

Private parking lots shall follow Article 8 of the Unified Development Ordinance for pavement thickness and base requirements.
DE Contact Field Eng. Inspector
Corrective Action Required
04/20/2021

Contact the Field Engineering Inspector at (816) 969-1200 at least 48 hours prior to the onset of construction.
DE Engineers Estimate
Corrective Action Required
04/20/2021

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)), and the water tap and meter setup fee have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $34,761.24
DE Future Repair Work
Corrective Action Required
04/20/2021

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
Engineering Review Approved with Conditions 04/27/2020 04/24/2020
Sue Pyles, P.E.
DE C&O #11 Pavement Thickness
Corrective Action Required
04/24/2020

Private parking lots shall follow Article 8 of the Unified Development Ordinance for pavement thickness and base requirements.
DE Contact Field Eng. Inspector
Corrective Action Required
04/24/2020

Contact the Field Engineering Inspector at (816) 969-1200 at least 48 hours prior to the onset of construction.
DE Engineers Estimate
Corrective Action Required
04/24/2020

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)), and the water tap and meter setup fee have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $34,761.24
DE Future Repair Work
Corrective Action Required
04/24/2020

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
Fire Review No Comments 04/27/2020 04/20/2020
Shannon McGuire
Traffic Review No Comments 04/27/2020 04/20/2020
Shannon McGuire
Planning Review No Comments 04/27/2020 04/20/2020
Shannon McGuire
Building Codes Review No Comments 04/27/2020 04/20/2020
Joe Frogge
Engineering Review Corrections 04/16/2020 04/14/2020
Sue Pyles, P.E.
Corrective Action Required
04/14/2020

As previously stated, the 100-year WSE must be a minimum of 20’ from any building or property line. The revised location meets that requirement from the property line, but does not appear to be 20’ from the building. Please revise.
Corrective Action Required
04/14/2020

Parking lot pavement sections are specified in UDO Section 8.620, not Design and Construction Manual Section 5200. The proposed sections exceed City requirements. They are acceptable, but not required. If the intent would be to revise to City equirements during construction, please note that a submittal will be required for review and approval. In that case, it would be better to make the revision now rather than later.
Corrective Action Required
04/14/2020

Sheet C7.1: Revise "X" to the correct size in the B1 label in the Structure Table.
Corrective Action Required
04/14/2020

Estimate – Add the following items • Scour Stop • Junction Box 4’ x 4’ • Grate Inlet 4’ x 4’ • Connection to Existing Storm Sewer Estimate – Check and revise the following items if needed: • 6” (estimate) vs. 8” (plans) size of roof drain HDPE • Sizes and quantities of End Sections, plans and estimate do not match • 2” C901 quantity, plans and estimate do not match • Backflow Preventer unit price, typical unit prices range from $12,000 to $18,000 each
Planning Review Corrections 04/16/2020 04/14/2020
Shannon McGuire
Corrective Action Required
04/14/2020

Sheet C4.0 & 4.1 shows CG-1 type curbing at the head of the ADA parking stalls. Is this the correct curb type being proposed?
Fire Review No Comments 04/16/2020 04/10/2020
Jim Eden
Code Statement
Informational
04/09/2020

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Traffic Review No Comments 04/16/2020 04/09/2020
Mike Weisenborn
Building Codes Review No Comments 04/16/2020 04/09/2020
Mike Weisenborn
Engineering Review Corrections 04/06/2020 04/06/2020
Sue Pyles, P.E.
Corrective Action Required
04/06/2020

The 100-year WSE must be a minimum 20’ from any building or property line. It appears that the east side of the detention basin does not meet that requirement in all locations. Please revise.
Corrective Action Required
04/06/2020

Sheet C2.0: Keynote 10 seems to be referencing storm sewer not shown.
Corrective Action Required
04/06/2020

Provide a detail showing the dimensions and slopes for all 4 sides of the turning space east of the entrance.
Corrective Action Required
04/06/2020

Any deviation from the City’s pavement requirements will require a modification be approved by the City Engineer. If you wish to pursue, let me know and I will send you a request form. Please note that justification for the request must be provided, which includes a comparison of the City’s design and the proposed alternate design showing the strength of the alternate is equal to or greater than the standard section.
Corrective Action Required
04/06/2020

Comments on the engineer's estimate will be provided under separate cover later this week.
Corrective Action Required
04/07/2020

It is unclear what the proposed berm and swale system looks like along the west and north edges of the property. Please include additional detail.
Corrective Action Required
04/07/2020

Add reference information on Sheets C5.0 & C5.1 in order to locate Grading Details A-E on Sheets C5.2 & C5.3.
Corrective Action Required
04/07/2020

In the Existing Conditions Analysis section of the Final Stormwater Management Study, the existing drainage from the west is said to drain northwest to Outfall B. Please revise the direction to northeast.
Building Codes Review No Comments 04/06/2020 04/06/2020
Joe Frogge
Planning Review Corrections 04/06/2020 04/05/2020
Mike Weisenborn
Corrective Action Required
04/02/2020

A dashed line indicating the roof line and rooftop mechanical equipment behind the proposed screening wall needs to be show on the proposed elevations. Updated architectural sheets were not provided with the latest submittal. Please provide updated elevations showing this information.
Corrective Action Required
04/02/2020

Heavy duty asphalt is still not identified in the legend on sheets C4.0 & C4.1. Please update the legend to identify the proposed pavement type.
Corrective Action Required
04/02/2020

Thank you for labeling the width of the landscaping islands. As proposed the islands are too narrow for trees to be planted in them. Tree planting areas shall be no less than ten feet in width. Please update the plans to meet the minimum required planting width for trees.
Fire Review Corrections 04/06/2020 04/02/2020
Jim Eden
Code Statement
Informational
04/02/2020

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
FDC
Corrective Action Required
04/02/2020

IFC 903.3.7 - Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official. Action required: The FDC is shown as a pedestal. It is recommended the FDC be building mounted. 3/31 Resubmittal- Sheet C6.0 now shows two locations for the pedestal FDC. Since the new location is next to the building, please place it on the building
Imposed Loads
Resolved
04/02/2020

IFC 503.2.3 - Fire apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus and shall be surfaced so as to provide all-weather driving capabilities. Action required: Heavy duty asphalt shall extend along the front of the building and the east drive lane of the parking lot to the northeast hydrant (FP-4a) C6.0.
Knox Locks
Resolved
04/02/2020

IFC 506.1 - Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type listed in accordance with UL 1037, and shall contain keys to gain necessary access as required by the fire code official. 506.1.1 Locks. An approved lock shall be installed on gates or similar barriers when required by the fire code official. Axction required: A knox box shall be mounted below the sprinkler horn/strobe and above or proximal to the FDC.
Traffic Review No Comments 04/06/2020 04/02/2020
Michael Park
Planning Review Corrections 03/06/2020 03/06/2020
Shannon McGuire
Corrective Action Required
03/06/2020

Please provide a vicinity map with north arrow indicating the location of the property within the City.
Corrective Action Required
03/06/2020

Sheet C3.0 does not scale out. It shows 1”=30’ but scales at 1”=28”. It may have just been printed wrong. Please check this and update as needed.
Corrective Action Required
03/06/2020

Please show the location, height, intensity and type of outside lighting fixtures.
Corrective Action Required
03/06/2020

Please provide a photometric diagram indicating the foot candle levels throughout the site and at the property lines.
Corrective Action Required
03/06/2020

Please provide the manufacturer’s specification sheets for proposed exterior lighting to include both parking lot pole mounted and wall mounted fixtures. The specification sheets shall indicate the exact fixture to be used.
Corrective Action Required
03/06/2020

Sheet C4.0 – labels for the parking stall and drive aisles do not line up with the drawing. Please check this and update the plans as needed.
Corrective Action Required
03/06/2020

Are any free standing signs being proposed? If so please show the location, size, and type of material of all proposed monument or freestanding signs.
Corrective Action Required
03/06/2020

Please show a dashed line indicating the roof line and rooftop mechanical equipment behind the proposed screening wall.
Corrective Action Required
03/06/2020

All plant materials and sizes for landscaping, buffers and tree replacement shall meet the ordinance requirements. Trees must be a minimum 3” cal. At the time of planting. Please update the landscape plan to reflect this requirement.
Corrective Action Required
03/06/2020

Please provide a completed Landscaping Worksheet.
Corrective Action Required
03/06/2020

Please label the total number of trees and shrubs being proposed on sheets L500 & L510.
Corrective Action Required
03/06/2020

Sheet C10.0 appears to show details for a trash enclosure but is not labeled as such. Please confirm of this is indeed the details for the proposed trash enclosure. If it the materials for the proposed gate will need to be called out.
Corrective Action Required
03/06/2020

Sheets 4.0 & C4.1 shows a cross hatching for heavy duty asphalt and concrete but is not identified in the key. Please check this and update the plans accordingly.
Corrective Action Required
03/06/2020

Please label the width of the landscaping islands.
Corrective Action Required
03/06/2020

Please label the width of the sidewalk that is in the landscaped parking lot island. Can this sidewalk be centered in the island?
Corrective Action Required
03/06/2020

All parking stall shall be 9’ wide x 19’ deep, placed at the prescribed angle so that it lies between the curb and the aisle. A 9’ wide x 17’ deep parking spaces is permitted when the parking space abuts a 6’ wide sidewalk or when abutting a curbed open green/landscaped space. The stalls in the northeast corner of the parking lot at labeled as 18’ deep but the abutting sidewalk is only 5’. The sidewalk needs to be 6’ minimum. The parking stall on the interior of the parking lot are short as well. Please update these to comply with the UDO requirements.
Corrective Action Required
03/06/2020

The legend on Sheet C3.0 calls out the curb and gutter as type “B” re: details and type “B-dry” re: details. The standard details on sheet C10.2 show numerous curb types. Please identify the curb detail to be used. CG-1 curbing is the only curb type allowed for the parking lot. Please update the plan sheets as needed to show this requirement. Additionally, please differentiate between curb types (CG-1 vs. CG-1 Dry) on sheets C4.0 & C4.1.
Corrective Action Required
03/06/2020

Please add the note that the ADA parking stall sign will be the R7-8 style to the detail sheet.
Corrective Action Required
03/06/2020

Prior to the issuance of building permits the property will be required to be platted.
Traffic Review No Comments 03/06/2020 03/03/2020
Michael Park
Engineering Review Corrections 03/06/2020 03/02/2020
Sue Pyles, P.E.
Corrective Action Required
03/02/2020

General: • Submit an Engineer's Estimate of Probable Construction Costs. • Submit the SWPPP and a copy of the MDNR Land Disturbance Permit. • Include a cover sheet with the following information: o Project title. o Vicinity map. o Developer’s name, address, phone number, and email address. o Utility contact information. • Show and label the 100-year WSE throughout the plan set. • Remove the existing driveway curb that is being demolished from the proposed views throughout the plan set. • Remove the property line along the east edge of the building, as it will be removed in the platting process. • Clearly show and label all easements throughout the plan set.
Corrective Action Required
03/02/2020

Sheet C1.0: • Please revise all specification references to only the City of Lee’s Summit. Any APWA specifications are a part of City specifications by reference. • Please revise General Utility Note 14 to reference the correct city.
Corrective Action Required
03/02/2020

Sheet C2.0: Keynote 08 is used 3 times. Please revise.
Corrective Action Required
03/02/2020

Sheet C3.0: • Please revise the pavement hatching in the Legend to visually match the Plan view. • Keynote 13 indicates a 6” berm will keep drainage from the east off of the site by diverting it around the site. If this berm is intended to be within the property boundary, as it appears, then please account for this drainage area in the stormwater report and the drainage map. By diverting along a berm, sheet flow will be converted to concentrated flow. Provide calculations showing shear strength requirements for this concentrated flow will be met in order to keep erosion from occurring. Provide a detail of the required berm section. • Lee’s Summit refers to curb and gutter as CG-1 or CG-2. Please revise Type B to match the City’s designation as shown in the standard detail.
Corrective Action Required
03/02/2020

Sheets C4.0-C4.1: No keynotes are used, so please remove the keynote legend.
Corrective Action Required
03/02/2020

Sheets C5.0-C5.1: • Revise overlapping text for clarity, such as east of the entrance and west of the handicap parking. • All proposed contours need to tie back to existing contours. Please review and revise as needed. • A 2% minimum slope is required for the bottom of the detention basin. Please verify this requirement is being met. • Include some type of reference to know where Grading Details A-E, as shown on the following 2 sheets, are located.
Corrective Action Required
03/02/2020

Sheets C5.2-C5.3: • Detectable warnings are not required for ADA-accessible ramps at entrances. Please remove. • Please check the scale for Grading Detail C. Revise if needed. • Please review the criteria listed in Table LS-5, and section views specified in 5304.8 in Section 5304.8 of the Design and Construction Manual and include all required information. This includes slopes and lengths of each edge of all sections. • A turning space is required where the private sidewalk connects to the public sidewalk.
Corrective Action Required
03/02/2020

Sheet C6.0: • The backflow vault needs to be located outside the public right-of-way and easements. Platting will require a 10’ utility easement be located along the Colbern Road frontage. Please locate the vault beyond the easement. • The backflow vault is a part of the private fire line, so it does not get placed within an easement. Please remove the proposed utility easement shown around the vault location. • Show and label the water meter. Is this the existing water meter and location, or proposed? • Label the sanitary connection as a cut-out wye. • Roof drains labeled ST-5 are not shown draining to the detention basin elsewhere in the plans and roof drains labeled ST-6 don’t drain to the detention basin as labeled. Please revise.
Corrective Action Required
03/02/2020

Sheet C7.0: • Show the existing pipe flowline information at Structure A1 in the Storm Line A Profile view. Is the proposed MH a “Doghouse” MH? If so, please label as such. • Relocate overlapping text in the Storm Line A Profile view for clarity. • A 0.5’ drop between the proposed and existing pipe at Structure A1 is required. This information will be checked when the existing pipe flowline is provided. • There appears to be an extra section of pipe, end section, and B1 label in the Plan view. Please remove on this sheet and all other sheets it appears. • The APWA/MARC BMP Manual Section 8.10.5 requires that consideration be given to locating the basin outlet as far away from the basin inlet as possible to prevent water from short-circuiting the facility. The proposed locations are both located at the south end of the basin only 20’ apart. It appears that it is feasible to locate the inlet and outlet a greater distance apart. Please revise or provide an explanation as to why it isn’t possible. • In the Structures Information Table description for Structure A3, please refer to the sheet containing the outflow structure design information. • Where invert elevations both in and out of a structure are provided in Profile view, make sure they correspond to the flow direction. • Other plan sheets indicate that there is a pipe and end section upstream of Structure A3. Please revise accordingly.
Corrective Action Required
03/02/2020

Sheet C7.1: • Remove the extra B3 label in the Plan view. • Where invert elevations both in and out of a structure are provided in Profile view, make sure they correspond to the flow direction. • Show Structure B1 as an end section in the Profile view. • Please “X” with the proposed size in the Structures Information Table description for Structure B1. • It would appear that rip-rap or some other erosion prevention is required at Structure B1. Please provide calculations to show the design of the proposed area is adequate for the outlet flows and velocities expected. • Profiles are required for all pipes greater than 6” diameter. If the proposed roof drains are 12” diameter, as shown elsewhere in the plans, please include pipe profiles. • Include flowline information at any connections between roof drains and storm sewer.
Corrective Action Required
03/02/2020

Sheet C7.2: • Label Structure B6 in the Plan view, • Where invert elevations both in and out of a structure are provided in Profile view, make sure they correspond to the flow direction.
Corrective Action Required
03/02/2020

Sheet C8.0: The roof drains are shown draining to multiple outlets. Revise the drainage map to reflect this plan.
Corrective Action Required
03/02/2020

Sheet C8.1: Revise the calculations to reflect the revision to the drainage map required by the comment above.
Corrective Action Required
03/02/2020

Sheets C9.0-C9.2: • Sheets C9.0 & C9.2 have the sheet titles reversed. • Revise “XX Acres” to the actual disturbed area in the Legend. • The Staging Chart includes BMP A7, but it is not shown on the plan. Please reconcile. • Include site specific construction details for the sediment trap. • Show and label the sediment trap emergency spillway location.
Corrective Action Required
03/02/2020

Sheets C10.0-C10.6: • Only include standard details for items on this project. Remove the others. • Verify that all items shown in the plan have a standard detail included. At a glance, there are no details included for curb inlets and grate inlets.
Corrective Action Required
03/02/2020

Sheet C10.0: The pavement sections don’t meet City requirements. Some exceed, which is fine, but didn’t want that to cause a problem during construction. Some don’t meet requirements, and need revised. Please refer to City requirements and revise as needed.
Corrective Action Required
03/02/2020

Sheet C10.6: • The Control Structure elevations don’t match the Final Stormwater Management Study. Please • Required freeboard has not been provided. Please revise. • The 11” weir opening dimension shown on Section A-A overlaps with the centerline graphically. Please adjust for clarity.
Corrective Action Required
03/02/2020

Final Stormwater Management Study • The report is missing extensive information. Please refer to the City’s Stormwater Report Requirements , available on the City’s website, for a list of information required. See also the report recently approved for the MCPL – East Lee’s Summit Library Final Development Plan as it contained the required information. • The first two sections of the report indicate the existing library will remain. Please revise. • The Outfall A section of the Proposed Conditions Analysis indicates all impervious areas drain to the detention basin. Part of the impervious area will drain undetained to Colbern Road. Please revise. • The Conclusion and Recommendations section refer to “detention basins” in the plural. Please revise for clarity as there is only one detention basin proposed. • A complete review of the study will be performed when complete design calculations have been submitted.
Building Codes Review Corrections 03/06/2020 02/27/2020
Joe Frogge
Corrective Action Required
03/31/2020

Irrigation design conflicts with MEP. Action required: Resolve conflict.
Fire Review Corrections 03/06/2020 02/26/2020
Jim Eden
Code Statement
Informational
02/26/2020

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
FDC
Corrective Action Required
02/26/2020

IFC 903.3.7 - Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official. Action required: The FDC is shown as a pedestal. It is recommended the FDC be building mounted.
Imposed Loads
Corrective Action Required
02/26/2020

IFC 503.2.3 - Fire apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus and shall be surfaced so as to provide all-weather driving capabilities. Action required: Heavy duty asphalt shall extend along the front of the building and the east drive lane of the parking lot to the northeast hydrant (FP-4a) C6.0.
Knox Locks
Corrective Action Required
02/26/2020

IFC 506.1 - Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type listed in accordance with UL 1037, and shall contain keys to gain necessary access as required by the fire code official. 506.1.1 Locks. An approved lock shall be installed on gates or similar barriers when required by the fire code official. Axction required: A knox box shall be mounted below the sprinkler horn/strobe and above or proximal to the FDC.
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Final Development Plan fee $600.00 $600.00 Paid 02/21/2020
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Date Uploaded File Type Document Name
02/21/2020 Receipt Receipt for transaction: 2020-000750
02/21/2020 Plans MCPL - Colbern Road FDP Technical Studies
02/21/2020 Letter Routing Sheet - FDP
03/06/2020 Letter Applicant Letter - FDP (DFDP)
03/30/2020 FDP 3.30.20
03/30/2020 Landscape Worksheet
03/30/2020 Lighting Cut Sheets
03/30/2020 Response Letter
03/30/2020 Stormwater Report
03/30/2020 Stormwater Response Letter
03/31/2020 Engineer Report/Study Colbern Road Sitework Estimate
03/31/2020 Engineer Report/Study 2020.03.30_SWPPP_MCPL Colbern Road
04/07/2020 Letter Applicant Letter - FDP (DFDP)
04/09/2020 Engineer Report/Study 4.9.20 80330_Colbern_Final_Storm Study_Rev Reduced
04/14/2020 Letter 2020.04.07_MCPL Colbern Road _Comment Response Letter 1
04/15/2020 Letter Applicant Letter - FDP (DFDP)
04/17/2020 Engineer Report/Study Colbern Road Site Cost Estimate
04/17/2020 Letter 2020.04.17 Response Letter
04/20/2020 Photograph Existing Backflow
04/24/2020 Activity Document Fees PL2020036 Mid-Continent Public Library FDP
04/27/2020 Letter Applicant Letter - FDP (DFDP)
04/28/2020 Approved Plans APPROVED CONSTRUCTION DOCUMENTS - MCPL - COLBERN RD - Rev 1 reduced
04/28/2020 Approved Plans APPROVED ELEVATIONS
04/28/2020 Approved Plans APPROVED LANDSCAPE, HARDSCAPE AND LIGHTING
04/20/2021 Plans WP10 COLBERN ROAD BRANCH DETENTION AS-BUILTS
04/23/2021 Plans PL2020036 Mid-Continent Public Library - Colbern Rd Det Basin As-Built Comments
05/06/2021 Plans 21.04.27 WP10 COLBERN ROAD BRANCH DETENTION AS-BUILTS
07/16/2021 Email PL2020036 Mid-Continent Public Library - Colbern Road FDP Det_ Basin As-Built
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.