Planning Application Status

PL2019072




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2019072
PARAGON STAR FIRST PLAT
Final Plat
Final Plat
Recorded
02/15/2019
CITY OF LEE'S SUMMIT MISSOURI
Locations
Contacts
PARAGON STAR LLC, Address:4025 NE LAKEWOOD WAY, Unit 250, Phone:(816) 207-4500  
CITY OF LEE'S SUMMIT MISSOURI, Address:220 SE GREEN ST  
GEORGE BUTLER ASSOCIATES INC, Address:9801 RENNER BLVD, Phone:(913) 492-0400  
BUSHYHEAD LLC, Address:315 SE MAIN ST, Phone:(816) 207-6032  
HAPPY VALLEY PROPERTIES LLC, Address:801 NW COMMERCE DR  
Reviews
Review Type Outcome Est. Completion Date Completed
Planning Review No Comments 09/16/2021 09/20/2021
Jennifer Thompson
GIS Review No Comments 09/16/2021 09/17/2021
Kathy Kraemer
Engineering Review Approved with Conditions 09/16/2021 09/14/2021
Sue Pyles, P.E.
DE C&O #01 Eng Plans – FP/PP
Corrective Action Required
09/09/2021

All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final plat and approved prior to the approval of the final plat. All public infrastructure must be substantially complete, prior to the issuance of any building permits.
DE C&O #03 Eng & Insp Fees
Corrective Action Required
09/09/2021

All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any site development permits or the start of construction (excluding land disturbance permit).
DE C&O #09 FDP Reviews
Corrective Action Required
09/09/2021

Certain aspects of the development plan will be further reviewed during the Final Development Plan phase of the project. This includes detailed aspects of the design to help ensure that the plan meets the design criteria and specifications contained in the Design and Construction Manual.
GIS Review No Comments 03/15/2021 03/15/2021
Kathy Kraemer
Engineering Review Approved with Conditions 03/15/2021 03/15/2021
Sue Pyles, P.E.
DE C&O #01 Eng Plans – FP/PP
Corrective Action Required
03/15/2021

All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final plat and approved prior to the approval of the final plat. All public infrastructure must be substantially complete, prior to the issuance of any building permits.
DE C&O #03 Eng & Insp Fees
Corrective Action Required
03/15/2021

All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any site development permits or the start of construction (excluding land disturbance permit).
DE C&O #09 FDP Reviews
Corrective Action Required
03/15/2021

Certain aspects of the development plan will be further reviewed during the Final Development Plan phase of the project. This includes detailed aspects of the design to help ensure that the plan meets the design criteria and specifications contained in the Design and Construction Manual.
Planning Review Corrections 03/15/2021 03/15/2021
Jennifer Thompson
Corrective Action Required
03/15/2021

The plat title on Sheet 2 is incorrect (in the title area and the certification area.
Traffic Review Corrections 03/15/2021 03/10/2021
Michael Park
Corrective Action Required
03/10/2021

Revise Sheet 2, Tract A-G Note, for Tract G, such that the ownership and maintenance of Tract G is not specifically assigned to the City of Lee's Summit, but rather owned and maintained consistent with applicable rights-of-ways contiguous to the View High Drive right-of-way. Otherwise the plat may be inconsistent with adjacent ROW ownership and agreements for maintenance.
Fire Review No Comments 03/15/2021 03/08/2021
Mike Weisenborn
Engineering Review Corrections 02/25/2021 02/25/2021
Sue Pyles, P.E.
Corrective Action Required
02/25/2021

Please show and label all stream buffer boundaries within the plat boundary.
Planning Review Corrections 02/25/2021 02/25/2021
Jennifer Thompson
Corrective Action Required
02/22/2021

The City signature lines are required to be on both sheets. Please align them in the same general location on sheet for ease of completing the signatures
Corrective Action Required
02/22/2021

Revise the Planning Commission Secretary to John Lovell.
Corrective Action Required
02/22/2021

Does the gas/oil well note describe the entire boundaries within this plat? Please revise to simplify the description.
Corrective Action Required
02/22/2021

A D/E is noted within the plat, however a definition is not provided, please include a definition.
Corrective Action Required
02/22/2021

Label the width of the sidewalks (5'). Provide a label for the sidewalks along the north side of Tract A.
Corrective Action Required
02/22/2021

How many tracts are proposed for this plat? The plat title indicates A and B, but there are labels for A-G. Tracts A-D are defined on Sheet 2. Please define the others. Provide a note referencing and designating the entity responsible for maintenance and ownership of all Tracts.
Corrective Action Required
02/22/2021

The final plat shall not be recorded by the developer until the Director of Development Services and the City Attorney have reviewed and approved the Easements, Covenants, and Restrictions Agreement referenced on the plat. In addition, the approved Easements, Covenants and Restrictions Agreement shall be recorded at the time of the recording of the final plat.
Corrective Action Required
02/25/2021

Provide the coordinate table.
Corrective Action Required
02/25/2021

What are the lines that seem like contours? Can these be removed?
Corrective Action Required
02/25/2021

Can the line weight for the surrounding property owners be even lighter? It makes the plat very busy.
Corrective Action Required
02/25/2021

Please provide a review sheet without all the bearings and distances.
GIS Review Corrections 02/17/2021 02/17/2021
Kathy Kraemer
Corrective Action Required
02/17/2021

There are 2 distances coming from the point of beginning on Lot 1: 10046.92 and 1049.86. Which is correct?
Corrective Action Required
02/17/2021

On the east side of the southern cul-de-sac, does the curve go left or right on the dimension 2.46?
Corrective Action Required
02/17/2021

On the northern end of tract B (where it meets tract A) there seems to be some missing curve data after the dimension 13.59 bearing N14-7-45W.
Corrective Action Required
02/17/2021

On the curve with the radius of 198, there are 2 lengths: 103.03 and 259.56. Which is correct?
Fire Review No Comments 02/17/2021 02/17/2021
Jim Eden
Traffic Review Corrections 02/17/2021 02/16/2021
Michael Park
Corrective Action Required
02/16/2021

Tract G is not described; similar to Tract A, B, and C; except that Tract G is assumed future dedication as ROW to View High Drive as a portion of the roundabout matching ROW lines/Tract lines depicted on the infrastructure engineering plans.
Traffic Review Corrections 05/12/2020 05/12/2020
Michael Park
Corrective Action Required
05/12/2020

The plat description of Tract A for all roads and omission of any ROW for View High Parkway and portions of roundabout along View High Drive is confusing. River and Paragon Pkwy are private streets. Is View High Pkwy not a future public street, or at least a portion thereof being on the KCMO street plan? If so, it (or portions thereof) should be ROW though maintained in the interim by the TDD under terms of agreement?
Corrective Action Required
05/12/2020

The portion of Tract A near the intersection of View High Drive and Paragon Parkway may need revisions to encompass the entire right-of-way needed for the roundabout. The existing ROWs for View High Dr., proposed roundabout design and proposed Tract A don't make a clean delineation of responsiblity for the public road, private street and roundabout. Typically, ROW at a roundabout would include the approaching splitter islands.
Corrective Action Required
05/12/2020

Engineering Review Corrections 05/12/2020 05/12/2020
Sue Pyles, P.E.
Corrective Action Required
05/12/2020

Please provide an exhibit that only shows the plat boundary, lot/tract lines, existing easements, and proposed easements to aid in the plat review. It is very difficult to verify existing and proposed easements, and this exhibit will help determine if any of the existing easements will need to be vacated. Revisions to the plat may be required, pending review of this exhibit.
Corrective Action Required
05/12/2020

If the same type of easement, such as sanitary, is granted to multiple entities, please differentiate in labeling for clarity.
Corrective Action Required
05/12/2020

Are easements labeled "By Plat" existing easements that were dedicated on a previous plat and "By This Plat" proposed easements being dedicated now?
Corrective Action Required
05/12/2020

Show and label all stream buffers and include the following language on the plat: “In the areas designated as “Stream Buffer Easement” there is hereby granted to the City an easement for the purpose of prohibiting any development of any kind and prohibiting the erection, construction, placement or maintenance of any structures upon such land, as the term “structure” shall be defined in the City’s Unified Development Ordinance in Chapter 27 of the City Code of Ordinances, and prohibiting any change in the grade and elevation of such land, and prohibiting the alteration of the natural course and flow of the water in the stream, and prohibiting the damming or stoppage of the water in the stream, and to require the owners of such land to keep and maintain such land in its natural vegetative state and to tend, maintain and mow such land as required by the City’s Property Maintenance Code in Chapter 16 of the City Code of Ordinances, which easement shall constitute a servitude upon the land so encumbered and which shall run with the land in perpetuity and be binding upon the land owners, their successors and assigns and all other parties claiming under them, and shall remain in full force and effect forever.”
Planning Review Corrections 05/12/2020 05/11/2020
Jennifer Thompson
Corrective Action Required
05/11/2020

Revise the department title for Ryan A. Elam to read: Development Services.
Corrective Action Required
05/11/2020

Revise the Planning Commission Secretary name to Carla Dial.
Corrective Action Required
05/11/2020

Label the proposed sidewalks along Tract A. The sidewalks shall be on both sides of the roadway/tract. Additional clarification is needed on the limits and extent of the sidewalk needed.
Corrective Action Required
05/11/2020

Provide a general building setback line dedication. Are setback lines proposed for the lots and tracts?
Corrective Action Required
05/11/2020

The standard easement language needs to be added to the easement dedication paragraph. This can be found at: https://library.municode.com/mo/lee's_summit/codes/unified_development_ordinance?nodeId=ART7SU
Corrective Action Required
05/11/2020

Provide easements that are required in conjunction with the development plan that is in review.
Corrective Action Required
05/11/2020

The final plat shall not be recorded by the developer until the Director of Development Services and the City Attorney have reviewed and approved the Easements, Covenants, and Restrictions Agreement referenced on the plat. In addition, the approved Easements, Covenants and Restrictions Agreement shall be recorded at the time of the recording of the final plat.
Corrective Action Required
05/12/2020

Provide an exhibit that shows the footprints of the proposed buildings in relationship to the lots/tracts/easements, etc.
Corrective Action Required
05/12/2020

Provide a correspondence/response letter based on staff's comments.
Fire Review No Comments 05/12/2020 04/30/2020
Jim Eden
Planning Review Corrections 02/28/2019 03/01/2019
Jennifer Thompson
Legal Description
Corrective Action Required
02/25/2019

Please submit an electronic copy of the legal description. Microsoft Word document or selectable text PDF are the preferred file formats. The legal description can be emailed to the planner's email address above.
Corrective Action Required
02/25/2019

Provide the lot numbers and tracts within the plat title.
Corrective Action Required
02/25/2019

Revise the Mayor's last name to Baird.
Corrective Action Required
02/25/2019

Revise the department title for Ryan A. Elam to read: Development Services.
Corrective Action Required
02/25/2019

Plat dedication paragraph is missing the undersigned name reference.
Corrective Action Required
02/25/2019

When resubmitting please provide the final plat in electronic format.
Corrective Action Required
02/25/2019

Can the line weight defining the lot lines be darker?
Corrective Action Required
02/25/2019

Update the vicinity map for the accurate location.
Corrective Action Required
02/25/2019

Update the year in the City of Lee's Summit signature block.
Corrective Action Required
02/25/2019

The description paragraph seems incorrect? Please clarify.
Corrective Action Required
02/25/2019

Label the proposed sidewalks along Tract A. The sidewalks shall be on both sides of the roadway/tract.
Corrective Action Required
02/25/2019

Provide a general building setback line dedication.
Corrective Action Required
02/25/2019

The final plat shall not be recorded by the developer until the Director of Development Services and the City Attorney have reviewed and approved the Easements, Covenants, and Restrictions Agreement referenced on the plat. In addition, the approved Easements, Covenants and Restrictions Agreement shall be recorded at the time of the recording of the final plat.
Corrective Action Required
02/25/2019

Provide the tract width dimensions.
Corrective Action Required
02/25/2019

An additional dedication statement is needed dedicating any public infrastructure.
Corrective Action Required
03/01/2019

Provide easements that are required in conjunction with the development plan that is in review.
Engineering Review Corrections 02/28/2019 03/01/2019
Sue Pyles, P.E.
Corrective Action Required
03/01/2019

Show and label all public easements.
Corrective Action Required
03/01/2019

The north line is incorrectly labeled as the east line. Please revise.
Traffic Review Corrections 02/28/2019 02/26/2019
Michael Park
Corrective Action Required
02/26/2019

Tract A should be subdivided into Tract A and Tract B, with one or the other assigned to the portion of View High Parkway that will have a right-of-way assigned to LSMO (and KCMO beyond the plat boundary). The portion of River Road (a private street) without right-of-way will remain in a tract. The separation of tracts at their intersection of View High Parkway and River Road should occur at or near the south end of the roundabout approach splitter island.
Corrective Action Required
02/26/2019

The portion of Tract A near the intersection of View High Drive and Paragon Parkway may need revisions to encompass the entire right-of-way needed for the roundabout.
Corrective Action Required
02/26/2019

The rights-of-ways for View High Drive (including roundabout at Paragon Parkway) and View High Parkway (including the roundabout at River Road) should be shown on the plat as easements to LSMO or KCMO, as applicable. The right-of-way width determined to be required by KCMO for View High Parkway should have a consistent width the length of View High Parkway though the roadway improvements may narrow east of River Road. This right-of-way should include the entire roundabout at River Road and the approach splitter island along River Road. The right-of-way along View High Drive should include the entire roundabout and the approach splitter island along River Road.
Informational
02/26/2019

Right-of-way, whether KCMO or LSMO shown along or adjacent to the plat in assoction with View High Drive and View High Parkway will be maintained by the TDD per separate agreement. River Road and Paragon Parkway do not require right-of-way as public streets of the TDD.
GIS Review No Comments 02/28/2019 02/26/2019
Kathy Kraemer
Fire Review No Comments 02/20/2019 02/20/2019
Jim Eden
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Final Plat fee $712.00 $712.00 Paid 02/22/2019
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Planning Commission Meeting 04/08/2021 05:00 PM Council Chambers 04/08/2021 05:00 PM
Public Hearing Review
Approved
04/08/2021
City Council Ordinance 1st Reading 04/20/2021 06:00 PM Council Chambers 04/20/2021 06:00 PM
Public Hearing Review
Pending
City Council Ordinance 2nd Reading 05/04/2021 06:00 PM Council Chambers 05/04/2021 06:00 PM
Public Hearing Review
Pending
Documents & Images
Date Uploaded File Type Document Name
02/15/2019 Letter Routing Sheet
02/22/2019 Receipt Receipt for transaction: 2019-000586
02/26/2019 Agreement (executed) 00 - Filed Stamped - Paragon Star - Final Plat Applicaiton - 02-15-19
02/26/2019 Agreement (executed) 01 - Final Plat Application - Executed BB - 02-15-19
02/26/2019 Engineer Report/Study 02 - Exhibit A 1 - Paragon Star Final Plat - Legal Description
02/26/2019 Engineer Report/Study 03 - Exhibit A 2 - Paragon Star Final Plat - Closure-Report
02/26/2019 Agreement (executed) 04 - Exhibit B - Paragon Star Final Plat - Ownership Affidavit - LSMO
02/26/2019 Plans 05 - Final Plat - 12720F3100-24x36
02/26/2019 Drawing PARAGON STAR FIRST PLAT
03/01/2019 Letter Applicant Letter - FP (DRCF)
04/28/2020 ParagonStarFirstPlat-04-28-2020
04/28/2020 ParagonStarFirstPlatDescription
05/04/2020 Paragon Star First Plat_1st submittal
05/04/2020 Paragon Star Checklist
05/04/2020 Paragon Star Description
05/12/2020 Letter Applicant Letter - FP (DRCF)
02/08/2021 Letter ParagonStarFirstPlat-CommentResponseLetter-02-03-2021
02/08/2021 Plans 12720F3100
02/08/2021 Plans 12720F3100 - Esmts Deleted
02/25/2021 Letter Applicant Letter - FP (DRCF)
03/08/2021 Plans ParagonStarFirstPlat-ReviewSheet-3-4-21
03/08/2021 Plans ParagonStarFirstPlat-3-4-21
03/08/2021 Plans ParagonStarFirstPlat-ReviewSheet-EsmtsDeleted-3-4-21
03/08/2021 Letter ParagonStarFirstPlat-CommentResponseLetter-3-4-21
03/08/2021 Plans ParagonStarFirstPlat-EsmtsDeleted-3-4-21
03/15/2021 Letter Applicant Letter - FP (DRCF)
04/16/2021 Letter PC Letter
05/17/2021 Ordinance 9146
06/18/2021 Letter ParagonStarFirstPlat-CommentResponseLetter-6-18-21
06/18/2021 Plans ParagonStarFirstPlat-06-18-2021
09/09/2021 Plans ParagonStarFirstPlat-9-9-21
09/20/2021 Letter Applicant Letter - FP (DRCF)
02/01/2022 Plans Paragon Star First Plat
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home