Summary
PRRES20252043
Building Permit - Residential
Issued
NEW SINGLE FAMILY
NEW HOUSE - ROOF TRUSSES - UNFINIHSED AND FINISHED BASEMENT - UNCOVERED DECK ADDED BASEMENT FINISH / Brandon Kalwei 07/29/2025 9:28 AM STOP WORK ORDER generated on 06/11/2025 12:00 AM by username 'Mitchell Schwarz'. STOP WORK ORDER removed on 06/13/2025 12:00 AM by username 'Mitchell Schwarz'.
05/16/2025
05/27/2025
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
Summit Homes, Address:120 SE 30th St, Phone:(816) 434-5074 Ext:320  
BRUCER@SUMMITHOMESKC.COM  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
Sanitary Sewer Development Fee $2,285.00 $2,285.00 Paid 05/27/2025
Right of Way Permit Fee $85.00 $85.00 Paid 05/27/2025
Residential Excise Tax Fee $1,022.72 $1,022.72 Paid 05/27/2025
Water Tap Fee $3,973.00 $3,973.00 Paid 05/27/2025
Water Meter Fee $748.03 $748.03 Paid 05/27/2025
Valuation Fee New Single Family $1,729.58 $1,729.58 Paid 05/27/2025
Parks Impact Fee Residential Zone 2 $250.00 $250.00 Paid 07/29/2025
Outstanding Fees Amount Paid Owing Date Paid
Not Ready Inspection Fee $75.00 $0.00 $75.00 Not Paid
Not Ready Inspection Fee $75.00 $0.00 $75.00 Not Paid


$150.00    Add Fees to My Cart
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Driveway Inspection Pending
Plot Plan Inspection Pending
Occupancy Inspection - Codes Residential Pending
Footing Inspection - Residential Failed - Stop Work 6/11/2025 6/11/2025 06/11/2025
Misc
Corrective Action Required
06/11/2025
-Footing poured without inspection -Erosion control not in place Mitchell Schwarz 06/11/25 11:25AM
Erosion Control Inspection Residential Failed - Stop Work 6/11/2025 6/11/2025 06/11/2025
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
06/11/2025
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Footing Inspection - Residential Passed 6/13/2025 6/13/2025 06/13/2025
Misc
Resolved
06/13/2025
-Footing poured without inspection -Erosion control not in place Mitchell Schwarz 06/11/25 11:25AM
Erosion Control Inspection Residential Passed 6/13/2025 6/13/2025 06/13/2025
DCM3 ESC REQUIRED 2 DAY
Resolved
06/13/2025
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Sewer Service Inspection - R Failed 6/17/2025 6/17/2025 06/17/2025
Sewer Service Inspection - R Passed 6/18/2025 6/18/2025 06/18/2025
Water Service Inspection - R Passed 6/18/2025 6/18/2025 06/18/2025
Underslab Plumbing Inspection - Residential Passed 6/24/2025 6/24/2025 06/24/2025
Gas Service Inspection - Residential Passed 8/18/2025 8/18/2025 08/18/2025
Electrical Service Inspection Failed 8/18/2025 8/18/2025 08/18/2025
Misc
Corrective Action Required
08/18/2025
-remove bonding screw from sub panel -ufer ground connection must go directly to first point of disconnect
All Rough Inspection - Residential Failed 8/18/2025 8/18/2025 08/18/2025
Misc
Corrective Action Required
08/18/2025
-support duct above garage -fireblock rear garage wall and hvac chase into garage furr down -uncover covered front porch roof and walls to inspect nailing -provide protection at dryer vent through top plate 2” below plate -ducting missing for vent in laundry -slop/dwv hanger needs address due to board installed to protect wire -solid block throughout 2nd floor where sheathing does not meet top plate -HDU14 hold down, not installed completely -fire block top of furr out around water and sump pump lines. -provide access panels for the area entry valve -all exterior wall cornered require 3 studs min. Check throughout basement -fireblock basement bath wall/rec room wall to ceiling space -fire block wall space into furr down throughout basement bedroom -remove bonding screw from sub panel -ufer ground connection must go directly to first point of disconnect
Electrical Service Inspection Passed 8/26/2025 8/26/2025 08/26/2025
Misc
Resolved
08/26/2025
-remove bonding screw from sub panel -ufer ground connection must go directly to first point of disconnect
All Rough Inspection - Residential Failed 8/26/2025 8/26/2025 08/26/2025
Misc
Corrective Action Required
08/18/2025
-fireblock rear garage wall and hvac chases into garage furr down (not done) -address 6x top plates at front porch -ducting missing for vent in laundry -protect all wires within 6’ of attic access -anchor bolts not tight throughout basement -HDU14 hold down, not installed completely -fire block top of furr out around water and sump pump lines. -provide access panels for the area entry valve -fire block wall space into furr downs throughout basement (fire blocking materials must comply with code section 302.11.1) -support furr down in basement bedroom. Not to exceed more than 4’ unsupported span
All Rough Inspection - Residential Not Ready 8/29/2025 8/29/2025 08/29/2025
Misc
Corrective Action Required
08/26/2025
1/2” OSB IS NOT APPROVED FIREBLOCKING MATERIAL -fireblock rear garage wall and hvac chases into garage furr down (not done, all fireblocking material must comply with code section 302.11.1) -ducting missing for vent in laundry -protect all wires within 6’ of attic access -anchor bolts not tight throughout basement -fire block top of furr out around water and sump pump lines. -provide access panels for the water entry valve -fire block wall space into furr downs throughout basement (fire blocking materials must comply with code section 302.11.1) -support furr down in basement bedroom. Not to exceed more than 4’ unsupported span
All Rough Inspection - Residential Not Ready 9/3/2025 9/3/2025 09/03/2025
Misc
Corrective Action Required
08/29/2025
NOTHING DONE NOT READY 09/03/25 1/2” OSB IS NOT APPROVED FIREBLOCKING MATERIAL -fireblock rear garage wall and hvac chases into garage furr down (not done, all fireblocking material must comply with code section 302.11.1) -ducting missing for vent in laundry -protect all wires within 6’ of attic access -anchor bolts not tight throughout basement -fire block top of furr out around water and sump pump lines. -provide access panels for the water entry valve -fire block wall space into furr downs throughout basement (fire blocking materials must comply with code section 302.11.1) -support furr down in basement bedroom. Not to exceed more than 4’ unsupported span
All Rough Inspection - Residential Passed 9/5/2025 9/5/2025 09/05/2025
Misc
Resolved
09/05/2025
NOTHING DONE NOT READY 09/03/25 1/2” OSB IS NOT APPROVED FIREBLOCKING MATERIAL -fireblock rear garage wall and hvac chases into garage furr down (not done, all fireblocking material must comply with code section 302.11.1) -ducting missing for vent in laundry -protect all wires within 6’ of attic access -anchor bolts not tight throughout basement -fire block top of furr out around water and sump pump lines. -provide access panels for the water entry valve -fire block wall space into furr downs throughout basement (fire blocking materials must comply with code section 302.11.1) -support furr down in basement bedroom. Not to exceed more than 4’ unsupported span
Documents & Images
Date Uploaded File Type Document Name
05/16/2025 BY #2190 - PERMIT APP
05/19/2025 Approved Plans APPROVED PLANS
05/19/2025 Approved Plans APPROVED TRUSS LAYOUT
05/19/2025 Approved Plans APPROVED TRUSS PACKET
05/27/2025 Permit Codes Residential Plan Review
05/27/2025 Plot Plan APPROVED PLOT PLAN
05/27/2025 Permit DS Building Permit
05/27/2025 Receipt Receipt for transaction:2025-003843
06/11/2025 Letter Stop Work Order
06/11/2025 Letter Stop Work Order
06/12/2025 M L Crose 1221 SE Cronin St LSMO Footing Inspection Report Page 1 of 2
06/12/2025 M L Crose 1221 SE Cronin St LSMO Footing Inspection Report Page 2 of 2
06/13/2025 Letter INSPECTION SUMMARY
06/13/2025 Letter INSPECTION SUMMARY
06/17/2025 Letter INSPECTION SUMMARY
06/18/2025 Letter INSPECTION SUMMARY
06/18/2025 Letter INSPECTION SUMMARY
07/28/2025 Application Form BY #2190 - Basement Finish App 7_28_25
07/29/2025 Approved Plans APPROVED BASEMENT FINISH
07/29/2025 Receipt Receipt for transaction:2025-005866
08/18/2025 Letter INSPECTION SUMMARY
08/18/2025 Letter INSPECTION SUMMARY
08/18/2025 Letter INSPECTION SUMMARY
08/18/2025 Letter INSPECTION SUMMARY
08/26/2025 Letter INSPECTION SUMMARY
08/26/2025 Letter INSPECTION SUMMARY
08/29/2025 Letter INSPECTION SUMMARY
09/03/2025 Letter INSPECTION SUMMARY
09/05/2025 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home