Summary
PRRES20245058
Building Permit - Residential
Issued
NEW SINGLE FAMILY
NEW HOUSE - FINISHED AND UNFINISHED BASEMENT - COVERED DECK STOP WORK ORDER generated on 01/23/2025 12:00 AM by username 'Mitchell Schwarz'. STOP WORK ORDER removed on 01/24/2025 12:00 AM by username 'Mitchell Schwarz'.
09/24/2024
09/30/2024
03/26/2025
Locations
Contacts
SAB CONSTRUCTION INC, Address:PO BOX 942, Phone:(816) 524-3855  
Joseph Matthew Schartz, Address:PO Box 942, Phone:(816) 524-3855  
JOE@SABHOMES.COM  
MIKE BRYANT HEATING & COOLING , Address:1711 E 123RD , Phone:(913) 441-7807  
TEAGUE ELECTRIC CONSTRUCTION INC, Address:12425 W 92ND ST, Phone:(913) 529-4600  
GARRISON PLUMBING, Address:15430 S MAHAFFIE ST STE 102, Phone:(913) 768-1311  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331507-Sanitary Sewer Development Fee $2,285.00 $2,285.00 Paid 09/30/2024
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 09/30/2024
7232302-Residential License Tax Fee $1,022.72 $1,022.72 Paid 09/30/2024
8331401-Water Tap Fee $3,973.00 $3,973.00 Paid 09/30/2024
8350015-Water Meter Fee $748.03 $748.03 Paid 09/30/2024
9110078-Valuation Fee New Single Family $1,677.90 $1,677.90 Paid 09/30/2024
$0.00 $0.00 $0.00 N/A
$0.00 $0.00 $0.00 N/A
9110080-Not Ready Inspection Fee $75.00 $75.00 Paid 01/09/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Plot Plan Inspection Pending
Occupancy Inspection - Codes Residential Pending
Erosion Control Inspection Residential Pending
Sidewalk Inspection Pending 4/30/2025 4/30/2025
Miscellaneous Correction
Corrective Action Required
04/23/2025
4-2-25 RH. Sidewalk failed due to soft subgrade. 04-16-25 Jamie S, SW is formed, and compacted. The slopes are in compliance with city standards. Approved to pour. 4-23-25 Dustin A, Sw has been poured , slopes are in compliance. Expansion joint on right side of approach needs to be trimmed down due to it being a trip hazzard. No white cure has been applied.
Footing Inspection - Residential Passed 10/11/2024 10/11/2024 10/11/2024
Underslab Plumbing Inspection - Residential Not Ready 10/21/2024 10/21/2024 10/21/2024
Misc
Corrective Action Required
10/21/2024
Inspection denied -erosion control not in compliance -no address posted
Erosion Control Inspection Residential Failed 10/21/2024
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
10/21/2024
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
10/21/2024
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. -maintain gravel filter -maintain erosion control
Sewer Service Inspection - R Passed 10/23/2024 10/23/2024 10/23/2024
Water Service Inspection - R Passed 10/24/2024 10/24/2024 10/24/2024
Piers/Caissons Inspection - Residential Passed 11/5/2024 11/05/2024
Erosion Control Inspection Residential Partial 1/9/2025 01/09/2025
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
01/09/2025
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
DCM3 ESC REQUIRED 2 DAY
Resolved
01/09/2025
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. -maintain gravel filter -maintain erosion control
Corrective Action Required
01/09/2025
Erosion control in place at time of inspection
Gas Service Inspection - Residential Failed 1/9/2025 1/9/2025 01/09/2025
Misc
Corrective Action Required
01/09/2025
- Gas gauge bad, replace and re schedule inspection
All Rough Inspection - Residential Failed 1/9/2025 1/9/2025 01/09/2025
Misc
Corrective Action Required
01/09/2025
Fb = fire blocking or draft stop - Fb top plate penetrations at foyer/ garage wall - Fb gaps at end of I- beam at foyer - Vent ductwork missing atMaster bathroom ( both) - Add stud under double 2x12 at stairs wall and mud hall - Fb top plate penetration at basement family room CSST gas line back wall - Tighten anchor bolts in basement - Fb gap at top plate fur out south side - All 10’ vertical fire blocking to be of approved material and seal electrical penetrations - Protect electrical in studs at basement rear bed door - Fb top of double wall at basement tub - Missing ductwork for basement vent - Fb top plate penetration basement front bedroom
Electrical Service Inspection Passed 1/9/2025 1/9/2025 01/09/2025
Gas Service Inspection - Residential Failed 1/16/2025 1/16/2025 01/16/2025
Misc
Resolved
01/16/2025
- Gas gauge bad, replace and re schedule inspection
G2417.4.1 Test Pressure
Corrective Action Required
01/16/2025
INSPECTION, TESTING AND PURGING. AMENDED 7-945. The test pressure to be used shall be not less than one and one-half times the proposed maximum working pressure, but not less than 10 psig (68.9kPa) irrespective of design pressure. For welded piping, and for piping carrying gas at pressures in excess of fourteen (14) inches water column pressure, the test pressure shall not be less than 60 psig. Where the test pressure exceeds 125 psig (862 kPa gauge), the test pressure shall not exceed a value that produces a hoop stress in the piping greater than 50 percent of the specified minimum yield strength of the pipe.
All Rough Inspection - Residential Failed 1/21/2025 1/21/2025 01/21/2025
Misc
Corrective Action Required
01/09/2025
Fb = fire blocking or draft stop - Add stud under double 2x12 at stairs wall and mud hall - Fb gap at top plate fur out south side where plumbing above - All 10’ vertical fire blocking seal electrical penetrations - Protect electrical in studs at basement rear bed door - Fb top of double wall at basement tub -anchor bolts to be in the middle 1/3 of sill plate
All Rough Inspection - Residential Failed 1/23/2025 1/23/2025 01/23/2025
Misc
Corrective Action Required
01/21/2025
Address underslab plumbing before re inspection Fb = fire blocking or draft stop - Add stud under double 2x12 at stairs wall and mud hall - Fb gap at top plate fur out south side where plumbing above - All 10’ vertical fire blocking seal electrical penetrations - Protect electrical in studs at basement rear bed door - Fb top of double wall at basement tub -anchor bolts to be in the middle 1/3 of sill plate
Gas Service Inspection - Residential Failed 1/23/2025 1/23/2025 01/23/2025
G2417.4.1 Test Pressure
Corrective Action Required
01/16/2025
Address underslab plumbing before inspection performed INSPECTION, TESTING AND PURGING. AMENDED 7-945. The test pressure to be used shall be not less than one and one-half times the proposed maximum working pressure, but not less than 10 psig (68.9kPa) irrespective of design pressure. For welded piping, and for piping carrying gas at pressures in excess of fourteen (14) inches water column pressure, the test pressure shall not be less than 60 psig. Where the test pressure exceeds 125 psig (862 kPa gauge), the test pressure shall not exceed a value that produces a hoop stress in the piping greater than 50 percent of the specified minimum yield strength of the pipe.
Underslab Plumbing Inspection - Residential Failed - Stop Work 1/23/2025 1/23/2025 01/23/2025
Misc
Corrective Action Required
10/21/2024
Underslab plumbing covered without inspection. Stop work issued. Schedule for dye test and submit reasoning as to why this was not inspected. Inspection denied -erosion control not in compliance -no address posted
Underslab Plumbing Inspection - Residential Passed 1/24/2025 1/24/2025 01/24/2025
Misc
Corrective Action Required
01/23/2025
Underslab plumbing covered without inspection. Stop work issued. Schedule for dye test and submit reasoning as to why this was not inspected. Inspection denied -erosion control not in compliance -no address posted
Gas Service Inspection - Residential Failed 1/27/2025 1/27/2025 01/27/2025
G2417.4.1 Test Pressure
Corrective Action Required
01/23/2025
No pressure at gauge Address underslab plumbing before inspection performed INSPECTION, TESTING AND PURGING. AMENDED 7-945. The test pressure to be used shall be not less than one and one-half times the proposed maximum working pressure, but not less than 10 psig (68.9kPa) irrespective of design pressure. For welded piping, and for piping carrying gas at pressures in excess of fourteen (14) inches water column pressure, the test pressure shall not be less than 60 psig. Where the test pressure exceeds 125 psig (862 kPa gauge), the test pressure shall not exceed a value that produces a hoop stress in the piping greater than 50 percent of the specified minimum yield strength of the pipe.
All Rough Inspection - Residential Passed 1/27/2025 1/27/2025 01/27/2025
Misc
Resolved
01/27/2025
Fb = fire blocking or draft stop - Add stud under double 2x12 at stairs wall and mud hall - Fb gap at top plate fur out south side where plumbing above - All 10’ vertical fire blocking seal electrical penetrations - Protect electrical in studs at basement rear bed door - Fb top of double wall at basement tub -anchor bolts to be in the middle 1/3 of sill plate
Gas Service Inspection - Residential Passed 1/29/2025 1/29/2025 01/29/2025
G2417.4.1 Test Pressure
Resolved
01/29/2025
No pressure at gauge Address underslab plumbing before inspection performed INSPECTION, TESTING AND PURGING. AMENDED 7-945. The test pressure to be used shall be not less than one and one-half times the proposed maximum working pressure, but not less than 10 psig (68.9kPa) irrespective of design pressure. For welded piping, and for piping carrying gas at pressures in excess of fourteen (14) inches water column pressure, the test pressure shall not be less than 60 psig. Where the test pressure exceeds 125 psig (862 kPa gauge), the test pressure shall not exceed a value that produces a hoop stress in the piping greater than 50 percent of the specified minimum yield strength of the pipe.
Driveway Inspection Partial 4/2/2025 4/2/2025 04/02/2025
Misc
Informational
04/02/2025
4-2-25 Approach is approved to pour. Curb will need to be replaced on approach due to chunks missing from it. Contractor was informed of cracked curb.
Sidewalk Inspection Failed 4/2/2025 04/02/2025
Miscellaneous Correction
Corrective Action Required
04/02/2025
4-2-25 RH. Sidewalk failed due to soft subgrade.
Driveway Inspection Failed 4/10/2025 4/10/2025 04/10/2025
Misc
Informational
04/02/2025
4-2-25 Approach is approved to pour. Curb will need to be replaced on approach due to chunks missing from it. Contractor was informed of cracked curb. 4-10-25 Dustin A, Dw is poured to city specs. Curb was not replaced. Fail
Sidewalk Inspection Partial 4/16/2025 (P.M.) 4/16/2025 04/16/2025
Miscellaneous Correction
Corrective Action Required
04/02/2025
4-2-25 RH. Sidewalk failed due to soft subgrade. 04-16-25 Jamie S, SW is formed, and compacted. The slopes are in compliance with city standards. Approved to pour.
Sidewalk Inspection Partial 4/23/2025 4/23/2025 04/23/2025
Miscellaneous Correction
Corrective Action Required
04/16/2025
4-2-25 RH. Sidewalk failed due to soft subgrade. 04-16-25 Jamie S, SW is formed, and compacted. The slopes are in compliance with city standards. Approved to pour. 4-23-25 Dustin A, Sw has been poured , slopes are in compliance. Expansion joint on right side of approach needs to be trimmed down due to it being a trip hazzard. No white cure has been applied.
Driveway Inspection Passed 04/23/2025
Misc
Informational
04/10/2025
4-2-25 Approach is approved to pour. Curb will need to be replaced on approach due to chunks missing from it. Contractor was informed of cracked curb. 4-10-25 Dustin A, Dw is poured to city specs. Curb was not replaced. Fail 4-23-25 Dustin A, Curb was replaced. Passed
Documents & Images
Date Uploaded File Type Document Name
09/24/2024 HF125 - Air Combustion Calcs
09/24/2024 HF125 - Excise Tax Application
09/24/2024 HF125 - Permit Application
09/24/2024 LOT 125 FINAL
09/27/2024 Permit Codes Residential Plan Review
09/27/2024 Approved Plans APPROVED PLANS
09/27/2024 LOT 125 CITY
09/27/2024 Plot Plan APPROVED PLOT PLAN
09/30/2024 Permit Codes Residential Plan Review
09/30/2024 Permit DS Building Permit
09/30/2024 Receipt Receipt for transaction:2024-007995
10/10/2024 2606 SW Tracker Ln LSMO Footing Inspection Report 10-8-24
10/10/2024 Letter DS Building Permit
10/10/2024 Letter DS Building Permit
10/11/2024 Letter INSPECTION SUMMARY
10/21/2024 Letter INSPECTION SUMMARY
10/21/2024 Letter INSPECTION SUMMARY
10/23/2024 Letter INSPECTION SUMMARY
10/24/2024 Letter INSPECTION SUMMARY
11/05/2024 Letter INSPECTION SUMMARY
11/14/2024 HF125 - Response Cover Letter
11/14/2024 Approved Plans APPROVED REVISED PLANS
01/09/2025 Letter INSPECTION SUMMARY
01/09/2025 Letter INSPECTION SUMMARY
01/09/2025 Letter INSPECTION SUMMARY
01/09/2025 Letter INSPECTION SUMMARY
01/09/2025 Receipt Receipt for transaction:2025-000143
01/09/2025 Letter INSPECTION SUMMARY
01/16/2025 Letter INSPECTION SUMMARY
01/21/2025 Letter INSPECTION SUMMARY
01/23/2025 Letter Stop Work Order
01/23/2025 Letter INSPECTION SUMMARY
01/23/2025 Letter INSPECTION SUMMARY
01/24/2025 Letter INSPECTION SUMMARY
01/27/2025 Letter INSPECTION SUMMARY
01/27/2025 Letter INSPECTION SUMMARY
01/29/2025 Letter INSPECTION SUMMARY
04/02/2025 Letter INSPECTION SUMMARY
04/02/2025 Letter INSPECTION SUMMARY
04/10/2025 Letter INSPECTION SUMMARY
04/16/2025 Letter INSPECTION SUMMARY
04/23/2025 Letter INSPECTION SUMMARY
04/23/2025 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home