Summary
PRRES20244652
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE. UNFINISHED BASEMENT.
08/30/2024
09/18/2024
03/09/2025
07/23/2025
Locations
Contacts
BELLAH HOMES LLC, Address:P O BOX 346, Phone:(816) 697-2870  
Paul Miller, Address:P.O. Box 346, Phone:(816) 786-5050  
AFC HEATING AND COOLING, Address:824 NW MAIN ST , Phone:(816) 347-8388  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
TRI-COUNTY PLUMBING LLC, Address:PO BOX 234, Phone:(816) 720-3222  
PAUL@BELLAHHOMES.COM  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
Water Tap Fee $3,973.00 $3,973.00 Paid 09/18/2024
Water Meter Fee $748.03 $748.03 Paid 09/18/2024
Sanitary Sewer Development Fee $2,285.00 $2,285.00 Paid 09/18/2024
Right of Way Permit Fee $85.00 $85.00 Paid 09/18/2024
Residential Excise Tax Fee $1,022.72 $1,022.72 Paid 09/18/2024
Valuation Fee New Single Family $1,633.78 $1,633.78 Paid 09/18/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Erosion Control Inspection Residential Failed 10/11/2024 10/11/2024
Misc
Corrective Action Required
10/11/2024
- POST ADDRESS - TRIM TALL VEGETATION AT BACK OF LOT.
Footing Inspection - Residential Passed 10/11/2024 10/11/2024
Misc
Informational
10/11/2024
- INSPECTION PERFORMED BY THIRD PARTY
Underslab Plumbing Inspection - Residential Passed 10/22/2024 10/22/2024 10/22/2024
Erosion Control Inspection Residential Failed 10/22/2024 10/22/2024
Misc
Corrective Action Required
10/11/2024
- TRIM TALL VEGETATION AT BACK OF LOT.
DCM6 ESC INSP DENIED STREET CLEAN UP
Corrective Action Required
10/22/2024
REQUESTED INSPECTION(S) DENIED. STREET CLEAN UP REQUIRED IMMEDIATELY, AND SHALL BE COMPLETED PRIOR TO REQUESTED INSPECTION(S) BEING PERFORMED.
Sewer Service Inspection - R Passed 10/24/2024 10/24/2024 10/24/2024
Water Service Inspection - R Partial 10/25/2024 10/25/2024 10/25/2024
Misc
Corrective Action Required
10/25/2024
Partial, poly out of foundation 20’
Water Service Inspection - R Passed 10/28/2024 10/28/2024 10/28/2024
Misc
Resolved
10/28/2024
Partial, poly out of foundation 20’
All Rough Inspection - Residential Failed 12/16/2024 12/16/2024 12/16/2024
Misc
Informational
12/16/2024
- PORTAL FRAME ONLY APPROVED
Erosion Control Inspection Residential Failed 2/25/2025 02/25/2025
Misc
Resolved
02/25/2025
DCM6 ESC INSP DENIED STREET CLEAN UP
Corrective Action Required
10/22/2024
SWEEP GRAVEL AND DIRT OFF THE STREET
Gas Service Inspection - Residential Passed 2/25/2025 02/25/2025
Electrical Service Inspection Passed 2/25/2025 02/25/2025
All Rough Inspection - Residential Failed 2/25/2025 2/25/2025 02/25/2025
Misc
Resolved
02/25/2025
- PORTAL FRAME ONLY APPROVED
Misc
Corrective Action Required
02/25/2025
-Studs not continuous between latter support -Double joist hanger above 1st stair landing not nailed -Fb duct wall space adjacent to stair from joist space -Provide 3 studs support of I beam at duct chase -Isolate parallel wiring inside return air space -Provide full support for joist at middle of return air stud at closet/dining wall -Toe nail joists to wall top plates per code -Secure wiring within 8” of north outdoor receptacle box -Protect 3” DVW adjacent to refrigerator at wall top plate -Provide flashings at roof penetrations -Provide collar ties per code above garage -Anchor garage PFH wall sill plates per code -Engineer to address garage PFH wall header not going to corner as required; strap not installed -Provide bracing of interior walls per plan -Provide purlin support for rafters above stair and media area -Fb space adjacent to 2nd floor bathroom shower from roof -Provide header support above 2nd floor attic access opening -Provide 3 studs support directly underneath both the structural 4”x4” post and the I beam. Plan shows LVL beam under the I beam -Provide hangers at header connections above basement window -Have engineer address I beam and double joist point loads at master bedroom wall not aligned directly above beams below in basement **DO NOT INSULATE
All Rough Inspection - Residential Passed 3/17/2025 3/17/2025 03/17/2025
Misc
Resolved
03/17/2025
-Studs not continuous between latter support -Double joist hanger above 1st stair landing not nailed -Fb duct wall space adjacent to stair from joist space -Provide 3 studs support of I beam at duct chase -Isolate parallel wiring inside return air space -Provide full support for joist at middle of return air stud at closet/dining wall -Toe nail joists to wall top plates per code -Secure wiring within 8” of north outdoor receptacle box -Protect 3” DVW adjacent to refrigerator at wall top plate -Provide flashings at roof penetrations -Provide collar ties per code above garage -Anchor garage PFH wall sill plates per code -Engineer to address garage PFH wall header not going to corner as required; strap not installed -Provide bracing of interior walls per plan -Provide purlin support for rafters above stair and media area -Fb space adjacent to 2nd floor bathroom shower from roof -Provide header support above 2nd floor attic access opening -Provide 3 studs support directly underneath both the structural 4”x4” post and the I beam. Plan shows LVL beam under the I beam -Provide hangers at header connections above basement window -Have engineer address I beam and double joist point loads at master bedroom wall not aligned directly above beams below in basement **DO NOT INSULATE
Erosion Control Inspection Residential Partial 3/17/2025 03/17/2025
DCM6 ESC INSP DENIED STREET CLEAN UP
Resolved
03/17/2025
SWEEP GRAVEL AND DIRT OFF THE STREET
Miscellaneous Correction
Informational
03/17/2025
- EROSION CONTROL IN PLACE AT TIME OF INSPECTION.
Sidewalk Inspection Failed 5/28/2025 5/28/2025 05/28/2025
Misc
Informational
05/28/2025
05-28-25 Jamie S, SW does not have the required 3 inches of aggregate in spots and has standing water on the north side.
Sidewalk Inspection Failed 5/30/2025 5/30/2025 05/30/2025
Misc
Informational
05/28/2025
05-28-25 Jamie S, SW does not have the required 3 inches of aggregate in spots and has standing water on the north side. 5-30-25 DP. SW does not have required aggregate depth, talked to contractor and he is going to fix.
Sidewalk Inspection Partial 6/2/2025 6/2/2025 06/02/2025
Misc
Informational
05/30/2025
05-28-25 Jamie S, SW does not have the required 3 inches of aggregate in spots and has standing water on the north side. 5-30-25 DP. SW does not have required aggregate depth, talked to contractor and he is going to fix. 6-2-25 DP. SW has been corrected. Approved to pour
Plot Plan Inspection Passed 7/14/2025 07/14/2025
Occupancy Inspection - Codes Residential Failed 7/14/2025 7/14/2025 07/14/2025
Misc
Corrective Action Required
07/14/2025
- Remove portable toilet from sidewalk - Post permanent address - Sidewalk inspection pending - No hardware at front door no secondary lock - No hardware at kitchen sliding door - Provide security screws at front door if not installed - Uncover all smoke detectors for testing - Cut off excess UFER rod in basement - Provide ladder for Egress window in basement - Seal exterior penetration at sump - Provide security caps at AC compressor - Uncover water meter and rise to grade with meter 14-18” from lid of pit with gravel in bottom - Land sewer trace wire at grade Provide
Erosion Control Inspection Residential Failed 7/14/2025 07/14/2025
Miscellaneous Correction
Resolved
07/14/2025
- EROSION CONTROL IN PLACE AT TIME OF INSPECTION.
Misc
Corrective Action Required
07/14/2025
2 DAY TO RESOLVE - REMOVE TOILET FROM SIDEWALK - POST PERMANENT ADDRESS
Occupancy Inspection - Codes Residential Failed 7/22/2025 7/22/2025 07/22/2025
Misc
Corrective Action Required
07/14/2025
- Sidewalk inspection pending
Sidewalk Inspection Passed 7/23/2025 7/23/2025 07/23/2025
Misc
Informational
06/02/2025
05-28-25 Jamie S, SW does not have the required 3 inches of aggregate in spots and has standing water on the north side. 5-30-25 DP. SW does not have required aggregate depth, talked to contractor and he is going to fix. 6-2-25 DP. SW has been corrected. Approved to pour 07/23/25 Jamie S, SW slopes are in compliance with city standards.
Occupancy Inspection - Codes Residential Full C of O 07/23/2025
Misc
Resolved
07/23/2025
- Sidewalk inspection pending
Documents & Images
Date Uploaded File Type Document Name
09/10/2024 Permit Codes Residential Plan Review
09/12/2024 Plot Plan APPROVED PLOT PLAN
09/18/2024 Permit DS Building Permit
09/18/2024 Receipt Receipt for transaction: 2024-007758
10/25/2024 Letter INSPECTION SUMMARY
12/16/2024 Letter INSPECTION SUMMARY
02/25/2025 Letter INSPECTION SUMMARY
02/25/2025 Letter INSPECTION SUMMARY
02/25/2025 Letter INSPECTION SUMMARY
02/25/2025 Letter INSPECTION SUMMARY
03/17/2025 Letter INSPECTION SUMMARY
03/17/2025 Letter INSPECTION SUMMARY
05/28/2025 Letter INSPECTION SUMMARY
05/30/2025 Letter INSPECTION SUMMARY
06/02/2025 Letter INSPECTION SUMMARY
07/14/2025 Letter INSPECTION SUMMARY
07/14/2025 Letter INSPECTION SUMMARY
07/14/2025 Letter INSPECTION SUMMARY
07/22/2025 Letter INSPECTION SUMMARY
07/23/2025 Letter Codes Final Certificate of Occupancy
07/23/2025 Letter INSPECTION SUMMARY
03/11/2025 Inspection Engineer letter Lot 129
10/28/2024 Letter INSPECTION SUMMARY
10/24/2024 Letter INSPECTION SUMMARY
10/22/2024 Letter INSPECTION SUMMARY
10/22/2024 Letter INSPECTION SUMMARY
10/11/2024 Letter INSPECTION SUMMARY
10/11/2024 Letter INSPECTION SUMMARY
10/11/2024 M L Crose 1101 SW Corinthian Lane LSMO Bellah Homes Permit 2024-4652 3rd Party Footing Inspection Report 10-10-24
09/16/2024 Permit Codes Residential Plan Review
09/16/2024 Approved Plans APPROVED PLANS
08/30/2024 Lot 129 Tax Application
08/30/2024 Lot 129 Permit Application
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home