Summary
PRRES20243878
Building Permit - Residential
Certificate of Occupancy
CMH PARKS INC
NEW SINGLE FAMILY
NEW HOUSE - UNFINISHED BASEMENT - ROOF TRUSSES
07/25/2024
08/07/2024
01/22/2025
05/01/2025
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:10450 Holmes Rd Suite 100, Phone:(816) 246-6700  
CMH PARKS INC, Address:5000 CLAYTON RD  
Summit Homes, Address:120 SE 30th St, Phone:(816) 434-5074 Ext:320  
BRUCER@SUMMITHOMESKC.COM  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
Sanitary Sewer Development Fee $2,285.00 $2,285.00 Paid 08/07/2024
Right of Way Permit Fee $85.00 $85.00 Paid 08/07/2024
Residential Excise Tax Fee $1,022.72 $1,022.72 Paid 08/07/2024
Water Tap Fee $3,973.00 $3,973.00 Paid 08/07/2024
Water Meter Fee $748.03 $748.03 Paid 08/07/2024
Valuation Fee New Single Family $1,442.42 $1,442.42 Paid 08/07/2024
Not Ready Inspection Fee $75.00 $75.00 Paid 12/04/2024
3rd and Subsequent Inspection Fee (Per Hour) $75.00 $75.00 Paid 12/04/2024
Temporary Occupancy Fee $50.00 $50.00 Paid 01/14/2025
Temporary Occupancy Fee $50.00 $50.00 Paid 02/26/2025
Temporary Occupancy Fee $50.00 $50.00 Paid 04/01/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 9/12/2024 9/12/2024 09/12/2024
Sewer Service Inspection - R Passed 9/12/2024 09/12/2024
Water Service Inspection - R Passed 9/13/2024 09/13/2024
Underslab Plumbing Inspection - Residential Passed 9/23/2024 9/23/2024 09/23/2024
All Rough Inspection - Residential Partial 10/11/2024 10/11/2024 10/11/2024
Misc
Informational
10/11/2024
Garage portal frame inspection only Okay
All Rough Inspection - Residential Failed 11/1/2024 11/1/2024 11/01/2024
Misc
Resolved
11/01/2024
Garage portal frame inspection only Okay
Misc
Corrective Action Required
11/01/2024
-anchor bolts to be in the middle 1/3 of sill plate throughout -nail strapping at garage/front entry wall top plate -nail lib straps to code -missing stud at LIB wall in garage. -address electrical not secured in stud bay at laundry -provide proper support and slop for all dwv throughout main floor -rear primary bedroom and great room not frames to cspf specifications. -strap top plate where lapped less than 24” W foyer wall -strap top plate where lapped less than 24” bed 3 -
All Rough Inspection - Residential Failed 11/5/2024 11/5/2024 11/05/2024
Misc
Corrective Action Required
11/01/2024
-missing stud at LIB wall in garage. (Stud spacing greater than 16” OC) -provide proper support and slop for all dwv throughout main floor -rear primary bedroom and great room not frames to cspf specifications.(header stops before wall corner) -strap top plate where lapped less than 24” W foyer wall -strap top plate where lapped less than 24” bed 3
Erosion Control Inspection Residential Failed 11/5/2024 11/5/2024 11/05/2024
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
11/05/2024
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
11/05/2024
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
All Rough Inspection - Residential Failed 11/8/2024 11/8/2024 11/08/2024
Misc
Corrective Action Required
11/05/2024
-missing stud at LIB wall in garage. (Stud spacing greater than 16” OC) nail lib in this area to added stud -rear primary bedroom and great room not frames to cspf specifications missing straps at ends
Gas Service Inspection - Residential Not Ready 11/8/2024 11/8/2024 11/08/2024
Misc
Corrective Action Required
11/08/2024
No gas line installed
Electrical Service Inspection Passed 11/8/2024 11/8/2024 11/08/2024
Gas Service Inspection - Residential Failed 11/12/2024 11/12/2024 11/12/2024
Misc
Resolved
11/12/2024
No gas line installed
Misc
Corrective Action Required
11/12/2024
NO PRESSURE ON GAUGE
Erosion Control Inspection Residential Partial 11/13/2024 11/13/2024
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
11/13/2024
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
DCM3 ESC REQUIRED 2 DAY
Resolved
11/13/2024
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Miscellaneous Correction
Informational
11/13/2024
Erosion control measures are in place and must be properly maintained until CofO
Gas Service Inspection - Residential Failed 11/13/2024 11/13/2024
Misc
Corrective Action Required
11/12/2024
NO PRESSURE ON GAUGE 2nd inspection with 0 PSI
All Rough Inspection - Residential Failed 11/13/2024 11/13/2024 11/13/2024
Misc
Resolved
11/13/2024
-missing stud at LIB wall in garage. (Stud spacing greater than 16” OC) nail lib in this area to added stud -rear primary bedroom and great room not frames to cspf specifications missing straps at ends
Miscellaneous Correction
Corrective Action Required
11/13/2024
Gas inspection still failed
Gas Service Inspection - Residential Passed 11/14/2024 11/14/2024 11/14/2024
Misc
Resolved
11/14/2024
NO PRESSURE ON GAUGE 2nd inspection with 0 PSI
All Rough Inspection - Residential Passed 11/14/2024 11/14/2024 11/14/2024
Miscellaneous Correction
Resolved
11/14/2024
Gas inspection still failed
Sidewalk Inspection Partial 12/17/2024
Misc
Informational
12/17/2024
12-17-24 Dustin A, sw has been formed and compacted, slopes are in compliance . Fixed a section that Gravel was to shallow . Approved to pour
Driveway Inspection Partial 12/17/2024 12/17/2024 12/17/2024
Misc
Informational
12/17/2024
12-17-24 Dustin A Dw is formed and compacted. Approved to pour
Driveway Inspection Passed 12/23/2024 12/23/2024 12/23/2024
Misc
Informational
12/17/2024
12-17-24 Dustin A Dw is formed and compacted. Approved to pour 12-23-24 Dustin A, DW is poured to city specs. Passed
Sidewalk Inspection Passed 12/23/2024 12/23/2024 12/23/2024
Misc
Informational
12/17/2024
12-17-24 Dustin A, sw has been formed and compacted, slopes are in compliance . Fixed a section that Gravel was to shallow . Approved to pour 12-23-24 Dustin A, SW is poured to city specs and slopes are in compliance . Pass
Occupancy Inspection - Codes Residential Failed 1/7/2025 1/7/2025 01/07/2025
Misc
Corrective Action Required
01/07/2025
-provide as graded plot plan -obtain issued lawn irrigation permit -sod -splash blocks and sump pump discharge to extend 36” from foundation -uncover coved water meter for inspection -garage door to be self closing and latching -address kitchen “backsplash outlets” extending outside the finished wall -install water anti siphon device at basement spigot
Occupancy Inspection - Codes Residential Ready for Temp CO 1/14/2025 1/14/2025 01/14/2025
Misc
Corrective Action Required
01/07/2025
-provide as graded plot plan -sod -splash blocks and sump pump discharge to extend 36” from foundation -uncover coved water meter for inspection
Occupancy Inspection - Codes Residential Failed 2/13/2025 02/13/2025
Misc
Corrective Action Required
01/14/2025
-provide as graded plot plan -sod -splash blocks and sump pump discharge to extend 36” from foundation -uncover coved water meter for inspection
Occupancy Inspection - Codes Residential Failed 2/13/2025 02/13/2025
Misc
Corrective Action Required
02/13/2025
TCO EXPIRED NOTICE OF VIOLATION SENT. Mitchell Schwarz 02/13/2025 3:11 PM -provide as graded plot plan -sod -splash blocks and sump pump discharge to extend 36” from foundation -uncover coved water meter for inspection
Occupancy Inspection - Codes Residential Ready for Temp CO 2/26/2025 02/26/2025
Misc
Corrective Action Required
02/13/2025
TCO EXPIRED NOTICE OF VIOLATION SENT. Mitchell Schwarz 02/13/2025 3:11 PM -provide as graded plot plan -sod -splash blocks and sump pump discharge to extend 36” from foundation -uncover coved water meter for inspection
Occupancy Inspection - Codes Residential Failed 3/28/2025 03/28/2025
Misc
Corrective Action Required
02/26/2025
TCO EXPIRED NOTICE OF VIOLATION SENT. Mitchell Schwarz 02/13/2025 3:11 PM -provide as graded plot plan -sod -splash blocks and sump pump discharge to extend 36” from foundation -uncover coved water meter for inspection
Plot Plan Inspection Failed 4/4/2025 04/04/2025
Misc
Corrective Action Required
04/04/2025
Uncover covered manhole
Occupancy Inspection - Codes Residential Full C of O 5/1/2025 05/01/2025
Misc
Resolved
05/01/2025
TCO EXPIRED NOTICE OF VIOLATION SENT. Mitchell Schwarz 02/13/2025 3:11 PM -provide as graded plot plan -sod -splash blocks and sump pump discharge to extend 36” from foundation -uncover coved water meter for inspection
Documents & Images
Date Uploaded File Type Document Name
07/25/2024 H3 #79 - PERMIT APP
07/26/2024 Permit Codes Residential Plan Review
07/26/2024 Approved Plans APPROVED PLANS
07/26/2024 Approved Plans APPROVED TRUSS LAYOUT
07/26/2024 Approved Plans APPROVED TRUSS PACKAGE
08/06/2024 Plot Plan APPROVED PLOT PLAN
08/06/2024 Permit Codes Residential Plan Review
08/07/2024 Permit DS Building Permit
08/07/2024 Receipt Receipt for transaction:2024-006635
09/04/2024 3RD Party Insp Report 1543 Arbor Valley Dr LSMO Footing Inspection Report 8-30-24
09/12/2024 Letter INSPECTION SUMMARY
09/12/2024 Letter INSPECTION SUMMARY
09/13/2024 Letter INSPECTION SUMMARY
09/23/2024 Letter INSPECTION SUMMARY
10/11/2024 Letter INSPECTION SUMMARY
11/01/2024 Letter INSPECTION SUMMARY
11/05/2024 Letter INSPECTION SUMMARY
11/05/2024 Letter INSPECTION SUMMARY
11/08/2024 Letter INSPECTION SUMMARY
11/08/2024 Letter INSPECTION SUMMARY
11/08/2024 Letter INSPECTION SUMMARY
11/12/2024 Letter INSPECTION SUMMARY
11/13/2024 Letter INSPECTION SUMMARY
11/13/2024 Letter INSPECTION SUMMARY
11/13/2024 Letter INSPECTION SUMMARY
11/14/2024 Letter INSPECTION SUMMARY
11/14/2024 Letter INSPECTION SUMMARY
12/04/2024 Receipt Receipt for transaction:2024-009333
12/17/2024 Letter INSPECTION SUMMARY
12/17/2024 Letter INSPECTION SUMMARY
12/23/2024 Letter INSPECTION SUMMARY
12/23/2024 Letter INSPECTION SUMMARY
01/07/2025 Letter INSPECTION SUMMARY
01/14/2025 Letter INSPECTION SUMMARY
01/14/2025 Certificate/License Codes Temporary Certificate of Occupancy
01/14/2025 Receipt Receipt for transaction:2025-000219
02/13/2025 Letter Codes 10 Day Letter
02/13/2025 Letter INSPECTION SUMMARY
02/13/2025 Letter INSPECTION SUMMARY
02/13/2025 Letter INSPECTION SUMMARY
02/13/2025 Letter INSPECTION SUMMARY
02/14/2025 HT #79 - TCO Extension 2_14_25
02/26/2025 Certificate/License Codes Temporary Certificate of Occupancy
02/26/2025 Receipt Receipt for transaction:2025-001118
03/28/2025 Letter Codes 10 Day Letter
03/28/2025 Letter INSPECTION SUMMARY
03/28/2025 Letter INSPECTION SUMMARY
03/28/2025 Letter INSPECTION SUMMARY
04/01/2025 Certificate/License Codes Temporary Certificate of Occupancy
04/01/2025 Receipt Receipt for transaction:2025-001940
04/03/2025 LOT 79 ASBUILT
04/03/2025 Plot Plan APPROVED AS GRADED PLOT PLAN
04/04/2025 Letter INSPECTION SUMMARY
05/01/2025 Letter Codes Final Certificate of Occupancy
05/01/2025 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide: