Permit Application Status

PRRES20243667


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20243667
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE. UNFINISHED AND FINISHED BASEMENT. COVERED DECK. STOP WORK ORDER generated on 08/26/2024 12:00 AM by username 'Mitchell Schwarz'. STOP WORK ORDER removed on 08/27/2024 12:00 AM by username 'Mitchell Schwarz'.
07/17/2024
08/01/2024
01/20/2025
04/04/2025
Locations
Contacts
SAB CONSTRUCTION INC, Address:PO BOX 942, Phone:(816) 524-3855  
Joseph Matthew Schartz, Address:PO Box 942, Phone:(816) 524-3855  
MIKE BRYANT HEATING & COOLING , Address:1711 E 123RD , Phone:(913) 441-7807  
TEAGUE ELECTRIC CONSTRUCTION INC, Address:12425 W 92ND ST, Phone:(913) 529-4600  
GARRISON PLUMBING, Address:15430 S MAHAFFIE ST STE 102, Phone:(913) 768-1311  
Maria Casas, Address:200 NW Commerce CT  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331401-Water Tap Fee $3,973.00 $3,973.00 Paid 08/01/2024
8350015-Water Meter Fee $748.03 $748.03 Paid 08/01/2024
8331507-Sanitary Sewer Development Fee $2,285.00 $2,285.00 Paid 08/01/2024
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 08/01/2024
7232302-Residential License Tax Fee $1,022.72 $1,022.72 Paid 08/01/2024
9110078-Valuation Fee New Single Family $1,585.96 $1,585.96 Paid 08/01/2024
9110080-Not Ready Inspection Fee $75.00 $75.00 Paid 11/05/2024
9110080-3rd and Subsequent Inspection Fee (Per Hour) $75.00 $75.00 Paid 11/05/2024
9110080-Not Ready Inspection Fee $75.00 $75.00 Paid 02/12/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Failed - Stop Work 8/26/2024 08/26/2024
Misc
Corrective Action Required
08/26/2024
Footing poured without inspection
Footing Inspection - Residential Passed 8/27/2024 8/27/2024 08/27/2024
Misc
Resolved
08/27/2024
Footing poured without inspection
Sewer Service Inspection - R Passed 8/28/2024 8/28/2024 08/28/2024
Water Service Inspection - R Partial 8/29/2024 08/29/2024
Misc
Informational
08/29/2024
Copper ran from foundation
Water Service Inspection - R Passed 8/30/2024 8/30/2024 08/30/2024
Misc
Resolved
08/30/2024
Copper ran from foundation
Erosion Control Inspection Residential Partial 8/30/2024 08/30/2024
Misc
Informational
08/30/2024
Erosion control in compliance at time of inspection
Underslab Plumbing Inspection - Residential Passed 9/3/2024 9/3/2024 09/03/2024
Piers/Caissons Inspection - Residential Passed 9/5/2024 9/5/2024 09/05/2024
All Rough Inspection - Residential Not Ready 10/17/2024 10/17/2024
Misc
Corrective Action Required
10/17/2024
Inspection denied no city stamped plans on site.
All Rough Inspection - Residential Failed 10/18/2024 10/18/2024 10/18/2024
Misc
Corrective Action Required
10/17/2024
-sheathing breaks to occur in the middle 24” of portal at garage -missing perlin above garage -provide minimum 1” clearance from B vent -complete kitchen hood vent -fireblock left of fire place for furr down rafter into fireplace area -nail (3) LVL together both side above great room -missing stud at stud pack at entry /dining room corner -plans call for 2x6 framing in entry walls -strap top plates not overlapping at bed 3 entry -uncover cover deck -sister all studs where notched for anchor bolts in basement -anchor bolts to be in the middle 1/3 of sill plate -foundation wall studs to meet the requirements of code section R602.9
All Rough Inspection - Residential Failed 10/24/2024 10/24/2024 10/24/2024
Misc
Corrective Action Required
10/18/2024
-sheathing breaks to occur in the middle 24” of portal garage (not addressed) -plans call for 2x6 framing in entry walls -sister all studs where notched for anchor bolts in basement(remove insulation for inspection) -anchor bolts to be in the middle 1/3 of sill plate(remove insulation for inspection) -foundation wall studs to meet the requirements of code section R602.9 (not addressed)
Electrical Service Inspection Passed 10/24/2024 10/24/2024 10/24/2024
All Rough Inspection - Residential Failed 10/29/2024 10/29/2024 10/29/2024
Misc
Corrective Action Required
10/24/2024
-plans call for 2x6 framing in entry walls -anchor bolts to be in the middle 1/3 of sill plate(remove insulation for inspection) -foundation wall studs to meet the requirements of code section R602.9 (not addressed)
Gas Service Inspection - Residential Passed 10/31/2024 10/31/2024 10/31/2024
All Rough Inspection - Residential Not Ready 11/5/2024 11/5/2024 11/05/2024
Misc
Corrective Action Required
10/29/2024
-plans call for 2x6 framing in entry walls -foundation wall studs to meet the requirements of code section R602.9 (not addressed)
All Rough Inspection - Residential Passed 11/8/2024 11/08/2024
Misc
Resolved
11/08/2024
-plans call for 2x6 framing in entry walls -foundation wall studs to meet the requirements of code section R602.9 (not addressed)
Driveway Inspection Failed 12/9/2024 12/9/2024 12/09/2024
Misc
Corrective Action Required
12/09/2024
12-9-24 Dustin A, Dw was called in but gravel was to shallow. They are going to correct and i will be back my tomorrow.
Sidewalk Inspection Failed 12/9/2024 12/09/2024
Misc
Corrective Action Required
12/09/2024
12-9-24 Dustin A, Sw was formed but gravel was to shallow. They are going to correct it and i will stop back by in morning .
Sidewalk Inspection Partial 12/10/2024 12/10/2024 12/10/2024
Misc
Informational
12/10/2024
12-10-24 Dustin A, SW if formed and compacted. Slopes are in compliance. Approved to pour.
Driveway Inspection Partial 12/10/2024 (7:00AM to 4:00PM) 12/10/2024 12/10/2024
Misc
Corrective Action Required
12/09/2024
12-9-24 Dustin A, Dw was called in but gravel was to shallow. They are going to correct and i will be back my tomorrow. 12-10-24 Dustin A, DW has been corrected, Approved to pour.
Sidewalk Inspection Partial 12/17/2024 12/17/2024 12/17/2024
Misc
Informational
12/10/2024
12-10-24 Dustin A, SW if formed and compacted. Slopes are in compliance. Approved to pour. 12-17-24 Dustin A, All of SW but last panel is poured except last panel on farnhouse dr. Whats poured has passed. Last section will need recalled in for prepour inspection when ready
Occupancy Inspection - Codes Residential Failed 1/23/2025 1/23/2025 01/23/2025
Misc
Corrective Action Required
01/23/2025
-pay all fees -address pending driveway and sidewalk inspection -sod -splash blocks and sump pump discharge to extend 36” from foundation -will check water meter at time of final grade and sod. Ensure 14”-18” from top of meter to well ring lid. -premise identification to be properly illuminated -land sewer tracer -remove dust covers from fire alarms for inspection -seal gaps above garage door -outlet under sink missing faceplate and not gfci protected -deck receptacle not working correctly -fridge circuit not afci protected -provide lockout for all hard wired appliances -missing set screw sheered off at watcher anti syphon device
Erosion Control Inspection Residential Failed 01/23/2025
Misc
Resolved
01/23/2025
Erosion control in compliance at time of inspection
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
01/23/2025
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
01/23/2025
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Plot Plan Inspection Passed 2/3/2025 02/03/2025
All Rough Inspection - Residential Passed 2/26/2025 2/26/2025 02/26/2025
Sidewalk Inspection Partial 3/28/2025 3/28/2025 03/28/2025
Misc
Informational
12/17/2024
12-10-24 Dustin A, SW if formed and compacted. Slopes are in compliance. Approved to pour. 12-17-24 Dustin A, All of SW but last panel is poured except last panel on farnhouse dr. Whats poured has passed. Last section will need recalled in for prepour inspection when ready 3-28-25 Dustin A, Last section is formed and compacted and slope is in compliance. Approved to pour. There is still forms on this sidewalk that needs to be pulled.
Driveway Inspection Passed 4/3/2025 4/3/2025 03/28/2025
Misc
Corrective Action Required
12/10/2024
12-9-24 Dustin A, Dw was called in but gravel was to shallow. They are going to correct and i will be back my tomorrow. 12-10-24 Dustin A, DW has been corrected, Approved to pour. 3-28-25 Dustin A, dw has been poured to city specs. Passed.
Occupancy Inspection - Codes Residential Failed 4/2/2025 4/2/2025 04/02/2025
Misc
Corrective Action Required
01/23/2025
-address pending sidewalk inspection -splash blocks and sump pump discharge to extend 36” from foundation -outlet under kitchen sink not gfci protected -missing set screw installed and sheered off at water anti syphon device
Sidewalk Inspection Passed 4/3/2025 4/3/2025 04/03/2025
Misc
Informational
03/28/2025
12-10-24 Dustin A, SW if formed and compacted. Slopes are in compliance. Approved to pour. 12-17-24 Dustin A, All of SW but last panel is poured except last panel on farnhouse dr. Whats poured has passed. Last section will need recalled in for prepour inspection when ready 3-28-25 Dustin A, Last section is formed and compacted and slope is in compliance. Approved to pour. There is still forms on this sidewalk that needs to be pulled. 4-3-25 Dustin A, last section is poured and slopes are in compliance . Pass
Erosion Control Inspection Residential Passed 04/04/2025
DCM3 ESC REQUIRED 2 DAY
Resolved
04/04/2025
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
04/04/2025
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Occupancy Inspection - Codes Residential Full C of O 4/4/2025 4/4/2025 04/04/2025
Misc
Resolved
04/04/2025
-address pending sidewalk inspection -splash blocks and sump pump discharge to extend 36” from foundation -outlet under kitchen sink not gfci protected -missing set screw installed and sheered off at water anti syphon device
Documents & Images
Date Uploaded File Type Document Name
07/17/2024 HF124 - Air Combustion Calc
07/17/2024 HF124 - Excise Tax Application
07/17/2024 HF124 - Permit Application
07/22/2024 Email ADDRESS NOTIFICATION EMAIL
07/24/2024 Permit Codes Residential Plan Review
07/31/2024 Plot Plan APPROVED PLOT PLAN
07/31/2024 Approved Plans APPROVED PLANS
07/31/2024 Permit Codes Residential Plan Review
08/01/2024 Permit DS Building Permit
08/01/2024 Receipt Receipt for transaction:2024-006461
08/26/2024 Letter Stop Work Order
08/26/2024 3RD Party Insp Report THIRD PARTY FOOTING INSPECTION
08/27/2024 Letter INSPECTION SUMMARY
08/28/2024 Letter INSPECTION SUMMARY
08/29/2024 Letter INSPECTION SUMMARY
08/30/2024 Letter INSPECTION SUMMARY
08/30/2024 Letter INSPECTION SUMMARY
08/30/2024 M L Crose 2610 SW Tracker Ln LSMO Hook Farms Lot 124 SAB Permit 2024-3667 Foundation footing Inspection Report 8-19-24
09/03/2024 Letter INSPECTION SUMMARY
09/05/2024 Letter INSPECTION SUMMARY
10/17/2024 Letter INSPECTION SUMMARY
10/18/2024 Letter INSPECTION SUMMARY
10/24/2024 Letter INSPECTION SUMMARY
10/24/2024 Letter INSPECTION SUMMARY
11/05/2024 Receipt Receipt for transaction:2024-008753
11/05/2024 Letter INSPECTION SUMMARY
11/05/2024 Letter INSPECTION SUMMARY
11/05/2024 DW FRAMING INSPECTION RESPONSE[1]
12/09/2024 Letter INSPECTION SUMMARY
12/09/2024 Letter INSPECTION SUMMARY
12/09/2024 Letter INSPECTION SUMMARY
12/10/2024 Letter INSPECTION SUMMARY
12/10/2024 Letter INSPECTION SUMMARY
12/10/2024 Letter INSPECTION SUMMARY
12/17/2024 Letter INSPECTION SUMMARY
12/17/2024 Letter INSPECTION SUMMARY
01/23/2025 Letter INSPECTION SUMMARY
01/23/2025 Letter INSPECTION SUMMARY
01/23/2025 Letter INSPECTION SUMMARY
01/23/2025 Letter INSPECTION SUMMARY
01/31/2025 Plot Plan APPROVED AS BUILT PLOT PLAN
02/03/2025 Letter INSPECTION SUMMARY
02/10/2025 HF124 - Basement Finish Permit Application
02/11/2025 HF124 - Air Combustion Calc BF
02/11/2025 HF124 - Basement Finish Update 2_11_25
02/11/2025 Approved Plans APPROVED BASEMENT FINISH
02/12/2025 Receipt Receipt for transaction:2025-000888
03/28/2025 Letter INSPECTION SUMMARY
03/28/2025 Letter INSPECTION SUMMARY
03/28/2025 Letter INSPECTION SUMMARY
03/28/2025 Letter INSPECTION SUMMARY
04/02/2025 Letter INSPECTION SUMMARY
04/02/2025 Letter INSPECTION SUMMARY
04/03/2025 Letter INSPECTION SUMMARY
04/04/2025 Letter INSPECTION SUMMARY
04/04/2025 Letter Codes Final Certificate of Occupancy
04/04/2025 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home