Permit Application Status

PRRES20243620


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20243620
Building Permit - Residential
Issued
DOMAIN TIMBERLAKE MULTISTATE LLC
NEW SINGLE FAMILY
NEW HOUSE. UNFINISHED BASEMENT. ROOF TRUSSES. STOP WORK ORDER generated on 08/13/2024 12:00 AM by username 'Mitchell Schwarz'. STOP WORK ORDER removed on 08/22/2024 12:00 AM by username 'Mitchell Schwarz'. STOP WORK ORDER generated on 10/17/2024 12:00 AM by username 'Dustin Agcopra'. STOP WORK ORDER removed on 11/13/2024 12:00 AM by username 'Kyle Beard'. STOP WORK ORDER generated on 03/06/2025 12:00 AM by username 'Dustin Agcopra'. STOP WORK ORDER removed on 04/17/2025 12:00 AM by username 'Drew Fischer'.
07/16/2024
07/29/2024
01/14/2025
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
DOMAIN TIMBERLAKE MULTISTATE LLC, Address:590 MADISON AVE FL 13TH  
Summit Homes, Address:120 SE 30th St, Phone:(816) 434-5074 Ext:320  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
TREVOR@SUMMITHOMESKC.COM  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 07/29/2024
7232302-Residential Excise Tax Fee $1,022.72 $1,022.72 Paid 07/29/2024
8331401-Water Tap Fee $3,973.00 $3,973.00 Paid 07/29/2024
8350015-Water Meter Fee $748.03 $748.03 Paid 07/29/2024
8331507-Sanitary Sewer Development Fee $2,285.00 $2,285.00 Paid 07/29/2024
9110078-Valuation Fee New Single Family $1,966.21 $1,966.21 Paid 07/29/2024
9110080-Not Ready Inspection Fee $75.00 $75.00 Paid 12/04/2024
9110080-Not Ready Inspection Fee $75.00 $75.00 Paid 12/04/2024
9110080-3rd and Subsequent Inspection Fee (Per Hour) $50.00 $50.00 Paid 12/04/2024
9110080-3rd and Subsequent Inspection Fee (Per Hour) $50.00 $50.00 Paid 12/04/2024
9110080-Not Ready Inspection Fee $75.00 $75.00 Paid 01/23/2025
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 01/24/2025
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 02/26/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Plot Plan Inspection Pending
Occupancy Inspection - Codes Residential Pending
Misc
Corrective Action Required
02/26/2025
-As graded plot plan required -Final grade, sod, splash blocks etc -Sidewalk inspection pending -Secure AC whip
Footing Inspection - Residential Failed 8/13/2024 8/13/2024 08/13/2024
Misc
Resolved
11/13/2024
No inspection performed, erosion control not present.
Erosion Control Inspection Residential Failed - Stop Work 8/22/2024 8/22/2024 08/13/2024
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
08/13/2024
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. STOP WORK ISSUED, footing poured without erosion control No address
Erosion Control Inspection Residential Partial 8/22/2024 08/22/2024
DCM2 ESC DEFICIENT INSTALLATION
Resolved
08/22/2024
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. STOP WORK ISSUED, footing poured without erosion control No address
Water Service Inspection - R Partial 8/22/2024 08/22/2024
Sewer Service Inspection - R Passed 8/22/2024 08/22/2024
Water Service Inspection - R Passed 8/22/2024 08/22/2024
Underslab Plumbing Inspection - Residential Passed 8/27/2024 8/27/2024 08/27/2024
All Rough Inspection - Residential Failed 9/25/2024 9/25/2024 09/25/2024
Misc
Corrective Action Required
09/25/2024
Portal frame only, outside ok o cover, -Inside not complete.
Erosion Control Inspection Residential Failed 10/14/2024 10/14/2024 10/14/2024
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
10/14/2024
10-14-24 Dustin A, EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Some of the straw waddles have been removed or damaged and needs replaced
Erosion Control Inspection Residential Failed - Stop Work 10/17/2024 10/17/2024 10/17/2024
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
10/14/2024
10-14-24 Dustin A, EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Some of the straw waddles have been removed or damaged and needs replaced 10-17-24 Dustin A, not corrected
All Rough Inspection - Residential Not Ready 10/28/2024 10/28/2024 10/28/2024
Misc
Corrective Action Required
09/25/2024
Portal frame only, outside ok o cover, -Inside not complete. 10/28/24-no city stamped plans on site
Gas Service Inspection - Residential Failed 10/28/2024 10/28/2024 10/28/2024
Misc
Corrective Action Required
10/28/2024
No gas installed
Electrical Service Inspection Failed 10/28/2024 10/28/2024 10/28/2024
Misc
Corrective Action Required
10/28/2024
Secure SE cable within 12” of disconnect Ensure ufer ground connection
All Rough Inspection - Residential Not Ready 11/5/2024 11/5/2024 11/05/2024
Misc
Corrective Action Required
10/28/2024
Portal frame only, outside ok o cover, -Inside not complete. 10/28/24-no city stamped plans on site 11/5/24-no truss plans on site. Provide complete set of plans before scheduling reinspection
All Rough Inspection - Residential Failed 11/6/2024 11/6/2024 11/06/2024
Misc
Resolved
11/06/2024
Portal frame only, outside ok o cover, -Inside not complete. 10/28/24-no city stamped plans on site 11/5/24-no truss plans on site. Provide complete set of plans before scheduling reinspection
Misc
Corrective Action Required
11/06/2024
-missing anchor bolts at garage portal frame -secure SE cable within 12” of disconnect -address over bored stud at service panel bored for SE cable -seal top plate penetration above service panel -strap top plate in garage where not lapped with pantry exterior wall -fire block hvac chase in garage to ceiling space -provide Boca plate protection for dwv in pantry -strap top plate to code at pantry where overboard for dwv -fireblock hvac chase into ceiling space at pantry (seal gaps) -fireblock hvac chase at great room windows -provide proper slope for dwv throughout 2nd floor -provide attic access for entire attic space. -protect all wires within 6’ of attic access -remove 2x6 at primary bedroom N wall where coving top plate for inspection -complete bath vents throughout
Erosion Control Inspection Residential Partial 11/13/2024 11/13/2024 11/13/2024
DCM3 ESC REQUIRED 2 DAY
Resolved
11/13/2024
10-14-24 Dustin A, EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Some of the straw waddles have been removed or damaged and needs replaced 10-17-24 Dustin A, not corrected
Miscellaneous Correction
Informational
11/13/2024
Full erosion control measures are in place and must be properly maintained until CofO
All Rough Inspection - Residential Failed 11/13/2024 11/13/2024 11/13/2024
Misc
Corrective Action Required
11/06/2024
-missing anchor bolts at garage portal frame -secure SE cable within 12” of disconnect -address over bored stud at service panel bored for SE cable -seal top plate penetration above service panel -strap top plate in garage where not lapped with pantry exterior wall -fire block hvac chase in garage to ceiling space -provide Boca plate protection for dwv in pantry -strap top plate to code at pantry where overboard for dwv -fireblock hvac chase into ceiling space at pantry (seal gaps) -fireblock hvac chase at great room windows -provide proper slope for dwv throughout 2nd floor -provide attic access for entire attic space. -protect all wires within 6’ of attic access -remove 2x6 at primary bedroom N wall where coving top plate for inspection -complete bath vents throughout Stop work order has been lifted Okay to schedule all rough 11/13/24 KBEARD
Footing Inspection - Residential Passed 11/13/2024 11/13/2024
Misc
Resolved
11/13/2024
No inspection performed, erosion control not present.
Miscellaneous Correction
Informational
11/13/2024
Footing inspection was passed by a third party Exterior piers were not installed Seal the footing report
Electrical Service Inspection Failed 11/15/2024 11/15/2024 11/15/2024
Misc
Resolved
11/15/2024
Secure SE cable within 12” of disconnect Ensure ufer ground connection
Miscellaneous Correction
Corrective Action Required
11/15/2024
Secure neutral with lug in panel
All Rough Inspection - Residential Failed 11/15/2024 11/15/2024 11/15/2024
Misc
Resolved
11/15/2024
-missing anchor bolts at garage portal frame -secure SE cable within 12” of disconnect -address over bored stud at service panel bored for SE cable -seal top plate penetration above service panel -strap top plate in garage where not lapped with pantry exterior wall -fire block hvac chase in garage to ceiling space -provide Boca plate protection for dwv in pantry -strap top plate to code at pantry where overboard for dwv -fireblock hvac chase into ceiling space at pantry (seal gaps) -fireblock hvac chase at great room windows -provide proper slope for dwv throughout 2nd floor -provide attic access for entire attic space. -protect all wires within 6’ of attic access -remove 2x6 at primary bedroom N wall where coving top plate for inspection -complete bath vents throughout Stop work order has been lifted Okay to schedule all rough 11/13/24 KBEARD
Miscellaneous Correction
Corrective Action Required
11/15/2024
Electrical must pass See electrical inspection about neutral
Gas Service Inspection - Residential Passed 11/15/2024 11/15/2024 11/15/2024
Misc
Resolved
11/15/2024
No gas installed
Electrical Service Inspection Failed 11/18/2024 11/18/2024 11/18/2024
Miscellaneous Correction
Corrective Action Required
11/15/2024
Secure neutral with lug in panel Failed with no improvement 11-18-24. KBEARD
All Rough Inspection - Residential Failed 11/18/2024 11/18/2024 11/18/2024
Miscellaneous Correction
Corrective Action Required
11/15/2024
Electrical must pass See electrical inspection about neutral Failed with no improvement 11/18/24. KBEARD
All Rough Inspection - Residential Passed 11/18/2024 11/18/2024
Miscellaneous Correction
Resolved
11/18/2024
Electrical must pass See electrical inspection about neutral Failed with no improvement 11/18/24. KBEARD
Electrical Service Inspection Passed 11/18/2024 11/18/2024
Miscellaneous Correction
Resolved
11/18/2024
Secure neutral with lug in panel Failed with no improvement 11-18-24. KBEARD
Driveway Inspection Partial 12/30/2024 12/30/2024 12/30/2024
Misc
Informational
12/30/2024
12-30-24, DW is formed and compacted approved to pour.
Sidewalk Inspection Partial 12/30/2024 12/30/2024 12/30/2024
Misc
Informational
12/30/2024
12-30-24 Jamie S, SW is formed and compacted. Slopes are in compliance. Approved to pour.
Miscellaneous Inspection Partial 12/30/2024 12/30/2024 12/30/2024
Misc
Informational
12/30/2024
12-30-24 Jamie S, Curb is compacted and formed. Slopes are in compliance. Approved to pour.
Erosion Control Inspection Residential Failed 1/22/2025 01/22/2025
Miscellaneous Correction
Resolved
01/22/2025
Full erosion control measures are in place and must be properly maintained until CofO
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
01/22/2025
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Occupancy Inspection - Codes Residential Not Ready 1/22/2025 1/22/2025 01/22/2025
Misc
Corrective Action Required
01/22/2025
INSPECTION DENIDE NOT READY NO EROSION CONTROL IN PLACE.
Driveway Inspection Failed 1/22/2025 1/22/2025 01/22/2025
Misc
Informational
12/30/2024
12-30-24, DW is formed and compacted approved to pour. 1/22/25 Dustin A, inspection denied due to no erosion control per building codes
Erosion Control Inspection Residential Failed 1/22/2025 1/22/2025 01/22/2025
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
01/22/2025
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
01/22/2025
1-22-25 Dustin A, no erosion control in place EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Sidewalk Inspection Failed 1/22/2025 1/22/2025 01/22/2025
Misc
Corrective Action Required
01/22/2025
1/22/25 Dustin A, inspection denied due to no erosion control per building codes
Erosion Control Inspection Residential Partial 1/22/2025 1/22/2025 01/22/2025
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
01/22/2025
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
01/22/2025
1-22-25 Dustin A, no erosion control in place EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 1-22-25 Dustin A, Straw waddles were installed. Erosion control must be maintained. Pass
Driveway Inspection Passed 01/22/2025
Misc
Informational
01/22/2025
12-30-24, DW is formed and compacted approved to pour. 1/22/25 Dustin A, inspection denied due to no erosion control per building codes 1-22-25 Dustin A, DW has been poured to city specs and slopes are in compliance. Pass
Miscellaneous Inspection Passed 01/22/2025
Misc
Informational
12/30/2024
12-30-24 Jamie S, Curb is compacted and formed. Slopes are in compliance. Approved to pour. 1-22-25 Dustin A, Curb was poured to city specs. Passed
Erosion Control Inspection Residential Partial 1/28/2025 1/28/2025 01/22/2025
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
01/22/2025
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
01/22/2025
1-22-25 Dustin A, no erosion control in place EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 1-22-25 Dustin A, Straw waddles were installed. Erosion control must be maintained. Pass
Sidewalk Inspection Failed 1/23/2025 1/23/2025 01/23/2025
Misc
Informational
01/23/2025
1-23-25 Jamie S, SW is not incompliance with city standards, Failed. Will need another pre-pour inspection.
Occupancy Inspection - Codes Residential Ready for Temp CO 1/23/2025 1/23/2025 01/23/2025
Misc
Corrective Action Required
01/22/2025
-As graded plot plan required -Final grade, sod, splash blocks etc -Sidewalk inspection pending -Secure AC whip
Occupancy Inspection - Codes Residential Ready for Temp CO 2/23/2025 02/26/2025
Misc
Corrective Action Required
01/23/2025
-As graded plot plan required -Final grade, sod, splash blocks etc -Sidewalk inspection pending -Secure AC whip
Erosion Control Inspection Residential Failed 3/3/2025 3/3/2025 03/03/2025
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
01/22/2025
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
01/22/2025
1-22-25 Dustin A, no erosion control in place EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 1-22-25 Dustin A, Straw waddles were installed. Erosion control must be maintained. Pass
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
03/03/2025
3-3-25 Dustin A, SW needs cleaned from silt. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Erosion Control Inspection Residential Failed - Stop Work 3/6/2025 3/6/2025 03/06/2025
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
03/03/2025
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
03/03/2025
1-22-25 Dustin A, no erosion control in place EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 1-22-25 Dustin A, Straw waddles were installed. Erosion control must be maintained. Pass
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
03/03/2025
3-3-25 Dustin A, SW needs cleaned from silt. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 3-6-25 Dustin , has not been addressed
Erosion Control Inspection Residential Failed 3/14/2025 3/14/2025 03/14/2025
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
03/06/2025
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
03/06/2025
1-22-25 Dustin A, no erosion control in place EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 1-22-25 Dustin A, Straw waddles were installed. Erosion control must be maintained. Pass
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
03/06/2025
3-3-25 Dustin A, SW needs cleaned from silt. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 3-6-25 Dustin , has not been addressed 3/14/25 Mitch, sidewalk still not address
Erosion Control Inspection Residential Passed 4/17/2025 4/17/2025 04/17/2025
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
04/17/2025
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
03/14/2025
1-22-25 Dustin A, no erosion control in place EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 1-22-25 Dustin A, Straw waddles were installed. Erosion control must be maintained. Pass
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
03/14/2025
3-3-25 Dustin A, SW needs cleaned from silt. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 3-6-25 Dustin , has not been addressed 3/14/25 Mitch, sidewalk still not address
Sidewalk Inspection Partial 4/21/2025 4/21/2025 04/21/2025
Misc
Informational
01/23/2025
1-23-25 Jamie S, SW is not incompliance with city standards, Failed. Will need another pre-pour inspection. 4-21-25 Dustin A, ada ramp has been formed and aggregate has been compacted Approved to pour
Sidewalk Inspection Failed 5/5/2025 5/5/2025 05/05/2025
Miscellaneous Correction
Informational
05/05/2025
05-05-25 Jamie S, SW and ADA ramp are within compliance with city standards. The plastic on the ADA ramp needs to be removed. Call in for re-inspection.
Sidewalk Inspection Passed 5/7/2025 5/7/2025 05/07/2025
Miscellaneous Correction
Informational
05/05/2025
05-05-25 Jamie S, SW and ADA ramp are within compliance with city standards. The plastic on the ADA ramp needs to be removed. Call in for re-inspection. 5-7-25 Dustin A, pass
Documents & Images
Date Uploaded File Type Document Name
07/16/2024 HT #193 - PERMIT APP
07/18/2024 Approved Plans APPROVED PLANS
07/18/2024 Permit Codes Residential Plan Review
07/29/2024 Plot Plan APPROVED PLOT PLAN
07/29/2024 Approved Plans APPROVED TRUSS LAYOUT
07/29/2024 Approved Plans APPROVED TRUSS PACKAGE
07/29/2024 Permit Codes Residential Plan Review
07/29/2024 Permit DS Building Permit
07/29/2024 Receipt Receipt for transaction:2024-006303
08/12/2024 3216 SW Arbor Ridge Cir LSMO Basement Foundation Footing Inspection Report 8-12-24
08/13/2024 Letter INSPECTION SUMMARY
08/13/2024 Letter Stop Work Order
08/22/2024 Letter INSPECTION SUMMARY
08/22/2024 Letter INSPECTION SUMMARY
08/22/2024 Letter INSPECTION SUMMARY
08/22/2024 Letter INSPECTION SUMMARY
08/27/2024 Letter INSPECTION SUMMARY
09/25/2024 Letter INSPECTION SUMMARY
10/14/2024 Letter INSPECTION SUMMARY
10/14/2024 Letter INSPECTION SUMMARY
10/17/2024 Letter Stop Work Order
10/17/2024 Letter Stop Work Order
10/28/2024 Letter INSPECTION SUMMARY
10/28/2024 Letter INSPECTION SUMMARY
10/28/2024 Letter INSPECTION SUMMARY
11/05/2024 Letter INSPECTION SUMMARY
11/06/2024 Letter INSPECTION SUMMARY
11/13/2024 Letter INSPECTION SUMMARY
11/13/2024 Letter INSPECTION SUMMARY
11/13/2024 Letter INSPECTION SUMMARY
11/13/2024 Letter INSPECTION SUMMARY
11/15/2024 Letter INSPECTION SUMMARY
11/15/2024 Letter INSPECTION SUMMARY
11/15/2024 Letter INSPECTION SUMMARY
11/18/2024 Letter INSPECTION SUMMARY
11/18/2024 Letter INSPECTION SUMMARY
11/18/2024 Letter INSPECTION SUMMARY
11/18/2024 Letter INSPECTION SUMMARY
12/04/2024 Receipt Receipt for transaction:2024-009331
12/30/2024 Letter INSPECTION SUMMARY
12/30/2024 Letter INSPECTION SUMMARY
12/30/2024 Letter INSPECTION SUMMARY
01/22/2025 Letter INSPECTION SUMMARY
01/22/2025 Letter INSPECTION SUMMARY
01/22/2025 Letter INSPECTION SUMMARY
01/22/2025 Letter INSPECTION SUMMARY
01/22/2025 Letter INSPECTION SUMMARY
01/22/2025 Letter INSPECTION SUMMARY
01/22/2025 Letter INSPECTION SUMMARY
01/22/2025 Letter INSPECTION SUMMARY
01/22/2025 Letter INSPECTION SUMMARY
01/22/2025 Letter INSPECTION SUMMARY
01/22/2025 Letter INSPECTION SUMMARY
01/22/2025 Letter INSPECTION SUMMARY
01/23/2025 Letter INSPECTION SUMMARY
01/23/2025 Receipt Receipt for transaction:2025-000409
01/23/2025 Letter INSPECTION SUMMARY
01/24/2025 Certificate/License Codes Temporary Certificate of Occupancy
01/24/2025 Receipt Receipt for transaction:2025-000439
02/14/2025 HT #193 - TCO Extension 2_14_25
02/26/2025 Certificate/License Codes Temporary Certificate of Occupancy
02/26/2025 Receipt Receipt for transaction:2025-001123
02/26/2025 HT #193 - TCO Receipt 2_26_25
03/03/2025 Letter INSPECTION SUMMARY
03/06/2025 Letter Stop Work Order
03/06/2025 Letter Stop Work Order
03/14/2025 Letter INSPECTION SUMMARY
03/14/2025 Letter INSPECTION SUMMARY
04/09/2025 LOT 193 ASBUILT
04/09/2025 Plot Plan APPROVED AS GRADED PLOT PLAN
04/17/2025 Letter INSPECTION SUMMARY
04/21/2025 Letter INSPECTION SUMMARY
05/05/2025 Letter INSPECTION SUMMARY
05/07/2025 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home