Permit Application Status

PRRES20243543


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20243543
Building Permit - Residential
Issued
DOMAIN TIMBERLAKE MULTISTATE LLC
NEW SINGLE FAMILY
NEW HOUSE. UNFINISHED BASEMENT. WALKOUT BASEMENT. UNCOVERED DECK. ROOF TRUSSES. STOP WORK ORDER generated on 10/23/2024 12:00 AM by username 'Dustin Agcopra'. STOP WORK ORDER removed on 10/30/2024 12:00 AM by username 'Mitchell Schwarz'. STOP WORK ORDER generated on 03/06/2025 12:00 AM by username 'Dustin Agcopra'. STOP WORK ORDER removed on 03/14/2025 12:00 AM by username 'Mitchell Schwarz'.
07/10/2024
07/18/2024
01/11/2025
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
DOMAIN TIMBERLAKE MULTISTATE LLC, Address:590 MADISON AVE FL 13TH  
Summit Homes, Address:120 SE 30th St, Phone:(816) 434-5074 Ext:320  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
TREVOR@SUMMITHOMESKC.COM  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331401-Water Tap Fee $3,973.00 $3,973.00 Paid 07/18/2024
8350015-Water Meter Fee $748.03 $748.03 Paid 07/18/2024
8331507-Sanitary Sewer Development Fee $2,285.00 $2,285.00 Paid 07/18/2024
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 07/18/2024
7232302-Residential Excise Tax Fee $1,022.72 $1,022.72 Paid 07/18/2024
9110078-Valuation Fee New Single Family $1,936.52 $1,936.52 Paid 07/18/2024
9110080-Not Ready Inspection Fee $75.00 $75.00 Paid 12/04/2024
9110080-Not Ready Inspection Fee $75.00 $75.00 Paid 12/04/2024
9110080-Not Ready Inspection Fee $75.00 $75.00 Paid 12/04/2024
9110080-Not Ready Inspection Fee $75.00 $75.00 Paid 12/04/2024
9110080-Not Ready Inspection Fee $75.00 $75.00 Paid 02/18/2025
9110080-Not Ready Inspection Fee $75.00 $75.00 Paid 02/18/2025
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 02/18/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Driveway Inspection Pending
Misc
Informational
12/31/2024
12-31-24 Jamie S, DW is formed and compacted. Approved to pour.
Occupancy Inspection - Codes Residential Pending
Misc
Corrective Action Required
02/18/2025
-pay all fees -address pending driveway inspection -provide as graded plot plan -final grade and sod -splash blocks and sump pump discharge to extend 36” from foundation -install gutters -uncover covered water meter -identify and land sewer tracer wire -seal all exterior penetrations -deck post to beam connections not to code
Erosion Control Inspection Residential Pending
Footing Inspection - Residential Passed 8/1/2024 08/01/2024
Sewer Service Inspection - R Passed 8/1/2024 08/01/2024
Water Service Inspection - R Passed 8/7/2024 08/07/2024
Underslab Plumbing Inspection - Residential Passed 8/14/2024 8/14/2024 08/14/2024
All Rough Inspection - Residential Failed 9/10/2024 9/10/2024 09/10/2024
Misc
Corrective Action Required
09/10/2024
Garage portal and front porch framing inspection only Garage portal okay to cover -front porch could not be inspected(no complete set of plans on site)
Electrical Service Inspection Failed 10/16/2024 10/16/2024 10/16/2024
Misc
Corrective Action Required
10/16/2024
No ufer ground connection
All Rough Inspection - Residential Not Ready 10/16/2024 10/16/2024 10/16/2024
Misc
Corrective Action Required
09/10/2024
10/16/24- no plans on site. Framers still working Garage portal and front porch framing inspection only Garage portal okay to cover -front porch could not be inspected(no complete set of plans on site)
Gas Service Inspection - Residential Failed 10/16/2024 10/16/2024 10/16/2024
Misc
Corrective Action Required
10/16/2024
To low of pressure at gas gauge for inspection
Erosion Control Inspection Residential Failed 10/17/2024 10/17/2024 10/17/2024
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
10/17/2024
10-17-24 Dustin A, remove restroom from public street. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
All Rough Inspection - Residential Failed 10/17/2024 10/17/2024 10/17/2024
Misc
Resolved
10/17/2024
10/16/24- no plans on site. Framers still working Garage portal and front porch framing inspection only Garage portal okay to cover -front porch could not be inspected(no complete set of plans on site)
Misc
Corrective Action Required
10/17/2024
-seal furr outs in garage into furr down -fire block hvac chase into ceiling space -fire lock rear garage wall into ceiling space(seal gaps) -anchor bolts to be within 12” of plate breaks but not closer than 7x the diameter of the bolt -address dryer vent at owners entry hanging below ceiling line and disconnected -missing hold downs on trusses (check throughout) -provide hangers for cut joists above great room cut for dwv -fire lock hvac chase right of great room windows -block sheathing break at front entry -address plans call for (3) 2x4 full height at great room/ stairwell wall -complete electrical in bed 3 and fireblock -missing lateral bracing throughout -nail double trusses to plans throughout -minimum 3 studs at exterior wall corners in basement -sister all overmatched studs for anchor bolts -provide blocking under kitchen island
All Rough Inspection - Residential Not Ready 10/22/2024 10/22/2024 10/22/2024
Misc
Corrective Action Required
10/17/2024
-seal furr outs in garage into furr down -fire block hvac chase into ceiling space -fire block rear garage wall into ceiling space(seal gaps) -anchor bolts to be within 12” of plate breaks but not closer than 7x the diameter of the bolt -missing hold downs on trusses (check throughout) -provide hangers for cut joists above great room cut for dwv -fire block hvac chase right of great room windows -block sheathing break at front entry -address plans call for (3) 2x4 full height at great room/ stairwell wall -complete electrical in bed 3 and fireblock -missing lateral bracing throughout -nail double trusses to plans throughout -minimum 3 studs at exterior wall corners in basement -sister all overmatched studs for anchor bolts -provide blocking under kitchen island
Electrical Service Inspection Not Ready 10/22/2024 10/22/2024 10/22/2024
Misc
Corrective Action Required
10/16/2024
No ufer ground connection No gas line bonding
Gas Service Inspection - Residential Failed 10/22/2024 10/22/2024 10/22/2024
Misc
Corrective Action Required
10/16/2024
To low of pressure at gas gauge for inspection
G2417.4.1 Test Pressure
Corrective Action Required
10/22/2024
INSPECTION, TESTING AND PURGING. AMENDED 7-945. The test pressure to be used shall be not less than one and one-half times the proposed maximum working pressure, but not less than 10 psig (68.9kPa) irrespective of design pressure. For welded piping, and for piping carrying gas at pressures in excess of fourteen (14) inches water column pressure, the test pressure shall not be less than 60 psig. Where the test pressure exceeds 125 psig (862 kPa gauge), the test pressure shall not exceed a value that produces a hoop stress in the piping greater than 50 percent of the specified minimum yield strength of the pipe.
G2417.4 Test pressure measurement
Resolved
10/22/2024
INSPECTION, TESTING AND PURGING. Test pressure shall be measured with a manometer or with a pressure-measuring device designed and calibrated to read, record, or indicate a pressure loss caused by leakage during the pressure test period. The source of pressure shall be isolated before the pressure tests are made. Mechanical gauges used to measure test pressures shall have a range such that the highest end of the scale is not greater than five times the test pressure.
Erosion Control Inspection Residential Failed - Stop Work 10/23/2024 10/23/2024 10/23/2024
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
10/17/2024
10-17-24 Dustin A, remove restroom from public street. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 10-23-24 Dustin A , restroom still out in rd,
Erosion Control Inspection Residential Failed - Stop Work 10/25/2024 10/25/2024 10/25/2024
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
10/23/2024
10-17-24 Dustin A, remove restroom from public street. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 10-23-24 Dustin A , restroom still out in rd,
Erosion Control Inspection Residential Partial 10/30/2024 10/30/2024 10/30/2024
DCM3 ESC REQUIRED 2 DAY
Resolved
10/30/2024
10-17-24 Dustin A, remove restroom from public street. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 10-23-24 Dustin A , restroom still out in rd,
All Rough Inspection - Residential Failed 11/6/2024 11/6/2024 11/06/2024
Misc
Corrective Action Required
10/22/2024
ADDRESS ALL LOW VOLTAGE PENETRATIONS MADE AFTER FIRST INSPECTION -fire block hvac chase into ceiling space (seql gaps) -missing hold downs on trusses (check throughout) -address stud spacing at stairwell wall -complete electrical in bed 3 and fireblock -missing lateral bracing throughout -nail double trusses to plans throughout -ensure access for clean out under stairs
Electrical Service Inspection Not Ready 11/6/2024 11/6/2024 11/06/2024
Misc
Corrective Action Required
10/22/2024
No ufer ground connection
Gas Service Inspection - Residential Failed 11/6/2024 11/6/2024 11/06/2024
Gas Service Inspection - Residential Failed 11/6/2024 11/06/2024
Misc
Corrective Action Required
11/06/2024
provide shut off at csst line for stove
Gas Service Inspection - Residential Passed 11/12/2024 11/12/2024
Misc
Resolved
11/12/2024
provide shut off at csst line for stove
Electrical Service Inspection Passed 11/12/2024 11/12/2024 11/12/2024
Misc
Resolved
11/12/2024
No ufer ground connection
All Rough Inspection - Residential Passed 11/12/2024 11/12/2024 11/12/2024
Misc
Resolved
11/12/2024
ADDRESS ALL LOW VOLTAGE PENETRATIONS MADE AFTER FIRST INSPECTION -fire block hvac chase into ceiling space (seql gaps) -missing hold downs on trusses (check throughout) -address stud spacing at stairwell wall -complete electrical in bed 3 and fireblock -missing lateral bracing throughout -nail double trusses to plans throughout -ensure access for clean out under stairs
Driveway Inspection Partial 12/31/2024 12/31/2024 12/31/2024
Misc
Informational
12/31/2024
12-31-24 Jamie S, DW is formed and compacted. Approved to pour.
Piers/Caissons Inspection - Residential Passed 2/7/2025 2/7/2025 02/07/2025
Occupancy Inspection - Codes Residential Not Ready 2/12/2025 2/12/2025 02/12/2025
Misc
Corrective Action Required
02/12/2025
House locked no access.
Occupancy Inspection - Codes Residential Not Ready 2/13/2025 2/13/2025 02/13/2025
Misc
Corrective Action Required
02/12/2025
HOUSE NOT READY FOR INSPECTION -Work still being performed in garage -garage entry bath not complete -deck not constructed
Occupancy Inspection - Codes Residential Ready for Temp CO 2/18/2025 2/18/2025 02/18/2025
Misc
Resolved
02/18/2025
HOUSE NOT READY FOR INSPECTION -Work still being performed in garage -garage entry bath not complete -deck not constructed
Misc
Corrective Action Required
02/18/2025
-pay all fees -address pending driveway inspection -provide as graded plot plan -final grade and sod -splash blocks and sump pump discharge to extend 36” from foundation -install gutters -uncover covered water meter -identify and land sewer tracer wire -seal all exterior penetrations -deck post to beam connections not to code
Erosion Control Inspection Residential Failed 3/3/2025 3/3/2025 03/03/2025
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
03/03/2025
3-3-25 Dustin A, No erosion control in place. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Erosion Control Inspection Residential Failed - Stop Work 3/6/2025 3/6/2025 03/06/2025
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
03/03/2025
3-3-25 Dustin A, No erosion control in place. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 3-6-25 Dustin, A has not been addressed
Erosion Control Inspection Residential Partial 3/14/2025 3/14/2025 03/14/2025
DCM3 ESC REQUIRED 2 DAY
Resolved
03/14/2025
3-3-25 Dustin A, No erosion control in place. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 3-6-25 Dustin, A has not been addressed
Plot Plan Inspection Passed 4/28/2025 04/28/2025
Documents & Images
Date Uploaded File Type Document Name
07/10/2024 HT #191 - PERMIT APP
07/15/2024 Permit Codes Residential Plan Review
07/17/2024 RESPONSE LETTER - 240716
07/18/2024 Plot Plan APPROVED PLOT PLAN
07/18/2024 Approved Plans APPROVED PLANS
07/18/2024 Approved Plans APPROVED TRUSS PACKAGE
07/18/2024 Approved Plans APPROVED TRUSS LAYOUT
07/18/2024 Permit Codes Residential Plan Review
07/18/2024 Permit DS Building Permit
07/18/2024 Receipt Receipt for transaction:2024-005948
07/25/2024 3208 SW Arborridge Cir LSMO Footing Inspection Report 7-24-24
08/01/2024 Letter INSPECTION SUMMARY
08/01/2024 Letter INSPECTION SUMMARY
08/07/2024 Letter INSPECTION SUMMARY
08/14/2024 Letter INSPECTION SUMMARY
09/10/2024 Letter INSPECTION SUMMARY
10/16/2024 Letter INSPECTION SUMMARY
10/16/2024 Letter INSPECTION SUMMARY
10/16/2024 Letter INSPECTION SUMMARY
10/17/2024 Letter INSPECTION SUMMARY
10/17/2024 Letter INSPECTION SUMMARY
10/17/2024 Letter INSPECTION SUMMARY
10/22/2024 Letter INSPECTION SUMMARY
10/22/2024 Letter INSPECTION SUMMARY
10/22/2024 Letter INSPECTION SUMMARY
10/23/2024 Letter Stop Work Order
10/23/2024 Letter Stop Work Order
10/25/2024 Letter Stop Work Order
10/30/2024 Letter INSPECTION SUMMARY
11/06/2024 Letter INSPECTION SUMMARY
11/06/2024 Letter INSPECTION SUMMARY
11/06/2024 Letter INSPECTION SUMMARY
11/12/2024 Letter INSPECTION SUMMARY
11/12/2024 Letter INSPECTION SUMMARY
11/12/2024 Letter INSPECTION SUMMARY
11/12/2024 Letter INSPECTION SUMMARY
12/04/2024 Receipt Receipt for transaction:2024-009329
12/31/2024 Letter INSPECTION SUMMARY
02/07/2025 Letter INSPECTION SUMMARY
02/12/2025 Letter INSPECTION SUMMARY
02/13/2025 Letter INSPECTION SUMMARY
02/18/2025 Letter INSPECTION SUMMARY
02/18/2025 Certificate/License Codes Temporary Certificate of Occupancy
02/18/2025 Receipt Receipt for transaction:2025-000956
03/03/2025 Letter INSPECTION SUMMARY
03/06/2025 Letter Stop Work Order
03/06/2025 Letter Stop Work Order
03/14/2025 Letter INSPECTION SUMMARY
04/25/2025 Plot Plan APPROVED AS BUILT PLOT PLAN
04/28/2025 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home