Permit Application Status

PRRES20242534


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20242534
Building Permit - Residential
Temporary Occupancy
NEW SINGLE FAMILY
NEW HOUSE. FINISHED/UNFINISHED BASEMENT. WALKOUT BASEMENT. COVERED DECK. STOP WORK ORDER generated on 10/09/2024 12:00 AM by username 'Mitchell Schwarz'. STOP WORK ORDER removed on 10/25/2024 12:00 AM by username 'Kyle Beard'. STOP WORK ORDER generated on 03/17/2025 12:00 AM by username 'Dustin Agcopra'. STOP WORK ORDER removed on 04/02/2025 12:00 AM by username 'Mitchell Schwarz'.
05/17/2024
06/06/2024
11/20/2024
Locations
Contacts
IQ CONSTRUCTION, Address:P O BOX 6423, Phone:(816) 582-8100  
Brett Shelton, Address:p o box 6423  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
SAFEHOUSE ELECTRIC COMPANY, Address:P O BOX 1833, Phone:(816) 935-8113  
GARRISON PLUMBING, Address:15430 S MAHAFFIE ST STE 102, Phone:(913) 768-1311  
BSHELTON@IQHOMEBUILDERS.COM  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331401-Water Tap Fee $3,760.00 $3,760.00 Paid 06/06/2024
8350015-Water Meter Fee $680.46 $680.46 Paid 06/06/2024
8331507-Sanitary Sewer Development Fee $2,159.00 $2,159.00 Paid 06/06/2024
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 06/06/2024
7232302-Residential License Tax Fee $1,022.72 $1,022.72 Paid 06/06/2024
9110078-Valuation Fee New Single Family $1,778.61 $1,778.61 Paid 06/06/2024
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 04/04/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Erosion Control Inspection Residential Pending
Misc
Corrective Action Required
04/02/2025
Clean sidewalk and driveway from dirt/mud. 4-2-25 Sidewalk need protection due to rain coming in this week.
Occupancy Inspection - Codes Residential Pending
Misc
Corrective Action Required
04/04/2025
-sod -splash blocks and sump pump discharge to extend 36” from foundation -ensure water meter well to grade And meter 14”-18” from top of meter to well lid ring. 2” of gravel at bottom of meter pit while maintaining serviceability of meter and setter. (Will check after time of sod)
Footing Inspection - Residential Passed 6/11/2024 6/11/2024 06/11/2024
Erosion Control Inspection Residential Failed 11/15/2024 07/11/2024
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
07/11/2024
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. -MAINTAIN OVERGROWN VEGETATION -MAINTAIN SILT FENCE -MAINTAIN GRAVEL LOT ACCESS
Underslab Plumbing Inspection - Residential Passed 7/12/2024 7/12/2024 07/12/2024
Misc
Corrective Action Required
07/12/2024
Erosion Control Inspection Residential Failed 7/12/2024 07/12/2024
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
07/11/2024
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. -MAINTAIN OVERGROWN VEGETATION -MAINTAIN GRAVEL LOT ACCESS(gravel not spread and in street)
Sewer Service Inspection - R Passed 7/12/2024 7/12/2024 07/12/2024
Water Service Inspection - R Passed 7/15/2024 7/15/2024 07/15/2024
Piers/Caissons Inspection - Residential Passed 7/19/2024 07/19/2024
Erosion Control Inspection Residential Partial 7/19/2024 07/19/2024
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
07/12/2024
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. -MAINTAIN OVERGROWN VEGETATION -MAINTAIN GRAVEL LOT ACCESS(gravel not spread and in street)
Partial Correction
07/19/2024
Erosion control in compliance at time of inspection
All Rough Inspection - Residential Failed 10/4/2024 10/4/2024 10/04/2024
Misc
Corrective Action Required
10/04/2024
Inspection denied, erosion control not in compliance -repair silt fence -maintain overgrown vegetation -contain/ clean up trash and debris from lot
Erosion Control Inspection Residential Failed 10/4/2024 10/4/2024 10/04/2024
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
10/04/2024
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
10/04/2024
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. -repair silt fence -maintain overgrown vegetation -contain/ clean up trash and debris from lot
Erosion Control Inspection Residential Failed - Stop Work 10/9/2024 10/9/2024 10/09/2024
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
10/04/2024
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
10/04/2024
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. -repair silt fence -maintain overgrown vegetation -contain/ clean up trash and debris from lot
Erosion Control Inspection Residential Partial 10/25/2024 10/25/2024 10/25/2024
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
10/25/2024
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
DCM3 ESC REQUIRED 2 DAY
Resolved
10/25/2024
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. -repair silt fence -maintain overgrown vegetation -contain/ clean up trash and debris from lot
Miscellaneous Correction
Informational
10/25/2024
Full erosion control measures are in place and must be properly maintained until CofO
Gas Service Inspection - Residential Passed 10/28/2024 10/28/2024 10/28/2024
All Rough Inspection - Residential Failed 10/28/2024 10/28/2024 10/28/2024
Misc
Resolved
10/28/2024
Inspection denied, erosion control not in compliance -repair silt fence -maintain overgrown vegetation -contain/ clean up trash and debris from lot
Misc
Corrective Action Required
10/28/2024
Garage portal frame inspection only Uncover nailing to header
Electrical Service Inspection Passed 10/28/2024 10/28/2024 10/28/2024
All Rough Inspection - Residential Partial 10/30/2024 10/30/2024 10/30/2024
Misc
Informational
10/30/2024
Garage portal frame okay to cover.
Misc
Corrective Action Required
10/30/2024
Provide city stamped plans on site for full all rough inspection
All Rough Inspection - Residential Failed 10/31/2024 10/31/2024 10/31/2024
Misc
Resolved
10/31/2024
Garage portal frame okay to cover.
Misc
Resolved
10/31/2024
Provide city stamped plans on site for full all rough inspection
Misc
Corrective Action Required
10/31/2024
-all anchor bolts to be tight, in the middle 1/3, with in 12” of plate breaks but not closer than 7x the diameter of the bolt -provide attic access -provide hangers for joist above garage entry -fireblock laundry room wall to ceiling space -strap top plate where lapped less than 24” above master toilet room -missing stud pack under lvl above great room. -provide hangers for joist above master bed entry way (bathroom wall is non load bearing) -fireblock every 10’ in basement -fireblock beam ends in basement -sister all over notched wall studs in basement, notched for anchor bolts -3 studs required at each exterior wall corners -seal all penetrations in return air joist space above basement bath -seal wall space to ceiling space in bed 4 (seal penetrations) -seal penetrations into ceiling space bed 4 closet -seal penetrations above panel in play area -missing multiple stud packs under multiple beams in basement
All Rough Inspection - Residential Passed 11/15/2024 11/15/2024 11/15/2024
Misc
Resolved
11/15/2024
-all anchor bolts to be tight, in the middle 1/3, with in 12” of plate breaks but not closer than 7x the diameter of the bolt -provide attic access -provide hangers for joist above garage entry -fireblock laundry room wall to ceiling space -strap top plate where lapped less than 24” above master toilet room -missing stud pack under lvl above great room. -provide hangers for joist above master bed entry way (bathroom wall is non load bearing) -fireblock every 10’ in basement -fireblock beam ends in basement -sister all over notched wall studs in basement, notched for anchor bolts -3 studs required at each exterior wall corners -seal all penetrations in return air joist space above basement bath -seal wall space to ceiling space in bed 4 (seal penetrations) -seal penetrations into ceiling space bed 4 closet -seal penetrations above panel in play area -missing multiple stud packs under multiple beams in basement
Driveway Inspection Partial 3/13/2025 3/13/2025 03/13/2025
Misc
Informational
03/13/2025
3-13-25 Dustin A, DW is formed to city specs. Approved to pour
Erosion Control Inspection Residential Failed 3/13/2025 3/13/2025 03/13/2025
Miscellaneous Correction
Informational
10/25/2024
Full erosion control measures are in place and must be properly maintained until CofO
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
03/13/2025
3-13-25 Dustin A, No Erosion Control in place. Will need corrected. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Sidewalk Inspection Partial 3/13/2025 3/13/2025 03/13/2025
Misc
Informational
03/13/2025
3-13-25 Dustin A, sw is formed to city specs. Approved to pour
Erosion Control Inspection Residential Failed - Stop Work 3/17/2025 3/17/2025 03/17/2025
Miscellaneous Correction
Informational
03/13/2025
Full erosion control measures are in place and must be properly maintained until CofO
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
03/13/2025
3-13-25 Dustin A, No Erosion Control in place. Will need corrected. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 3-17-25 Dustin A, Still has not been corrected.
Erosion Control Inspection Residential Failed 4/1/2025 4/1/2025 04/01/2025
Miscellaneous Correction
Resolved
04/01/2025
Full erosion control measures are in place and must be properly maintained until CofO
DCM3 ESC REQUIRED 2 DAY
Resolved
04/01/2025
3-13-25 Dustin A, No Erosion Control in place. Will need corrected. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 3-17-25 Dustin A, Still has not been corrected.
Misc
Corrective Action Required
04/01/2025
Clean storm inlet in front of home.
Erosion Control Inspection Residential Partial 4/2/2025 4/2/2025 04/02/2025
Misc
Corrective Action Required
04/01/2025
Clean sidewalk and driveway from dirt/mud.
Occupancy Inspection - Codes Residential Failed 4/2/2025 4/2/2025 04/02/2025
Misc
Corrective Action Required
04/02/2025
-address underground/slab gas at rear patio uncover and pressurize for inspection -address pending driveway and sidewalk inspection -provide as graded plot plan -sod -splash blocks and sump pump discharge to extend 36” from foundation -ensure water meter well to grade And meter 14”-18” from top of meter to well lid ring. 2” of gravel at bottom of meter pit while maintaining serviceability of meter and setter. (Will check after time of sod)
Gas Piping Inspection - Residential Failed 4/2/2025 4/2/2025 04/02/2025
Misc
Corrective Action Required
04/02/2025
Uncover under ground gas piping for inspection and pressurize
Driveway Inspection Passed 4/2/2025 4/2/2025 04/02/2025
Misc
Informational
03/13/2025
3-13-25 Dustin A, DW is formed to city specs. Approved to pour 4-2-25 RH. Approach passed inspection and mud was cleaned off road and waddles. More erosion control will be need prior to rain on Friday.
Sidewalk Inspection Passed 3/20/2025 04/02/2025
Misc
Informational
04/02/2025
4-2-25 RH. Sidewalk passed inspection. More erosion control will be needed.
Erosion Control Inspection Residential Failed 04/02/2025
Misc
Corrective Action Required
04/02/2025
Clean sidewalk and driveway from dirt/mud. 4-2-25 Sidewalk need protection due to rain coming in this week.
Occupancy Inspection - Codes Residential Ready for Temp CO 4/4/2025 4/4/2025 04/04/2025
Misc
Corrective Action Required
04/02/2025
-sod -splash blocks and sump pump discharge to extend 36” from foundation -ensure water meter well to grade And meter 14”-18” from top of meter to well lid ring. 2” of gravel at bottom of meter pit while maintaining serviceability of meter and setter. (Will check after time of sod)
Gas Piping Inspection - Residential Passed 4/4/2025 4/4/2025 04/04/2025
Misc
Resolved
04/04/2025
Uncover under ground gas piping for inspection and pressurize
Plot Plan Inspection Passed 04/04/2025
Documents & Images
Date Uploaded File Type Document Name
05/21/2024 2139 SW Hook Farm Dr - Application and Excise Tax
05/24/2024 Permit Codes Residential Plan Review
05/29/2024 Plot Plan APPROVED PLOT PLAN
05/29/2024 Approved Plans APPROVED PLANS
05/29/2024 Permit Codes Residential Plan Review
06/06/2024 Permit DS Building Permit
06/06/2024 Receipt Receipt for transaction:2024-004457
06/11/2024 Letter INSPECTION SUMMARY
07/08/2024 Email WINDOW WELL APPROVAL COLS
07/11/2024 Letter INSPECTION SUMMARY
07/12/2024 Letter INSPECTION SUMMARY
07/12/2024 Letter INSPECTION SUMMARY
07/12/2024 Letter INSPECTION SUMMARY
07/15/2024 Letter INSPECTION SUMMARY
07/19/2024 Letter INSPECTION SUMMARY
10/04/2024 Letter INSPECTION SUMMARY
10/04/2024 Letter INSPECTION SUMMARY
10/04/2024 Letter INSPECTION SUMMARY
10/09/2024 Letter Stop Work Order
10/25/2024 Letter INSPECTION SUMMARY
10/28/2024 Letter INSPECTION SUMMARY
10/28/2024 Letter INSPECTION SUMMARY
10/28/2024 Letter INSPECTION SUMMARY
10/30/2024 Letter INSPECTION SUMMARY
10/30/2024 Letter INSPECTION SUMMARY
10/31/2024 Letter INSPECTION SUMMARY
11/15/2024 Letter INSPECTION SUMMARY
03/13/2025 Letter INSPECTION SUMMARY
03/13/2025 Letter INSPECTION SUMMARY
03/13/2025 Letter INSPECTION SUMMARY
03/13/2025 Letter INSPECTION SUMMARY
03/17/2025 Letter Stop Work Order
03/17/2025 Letter Stop Work Order
04/01/2025 Letter INSPECTION SUMMARY
04/02/2025 Letter INSPECTION SUMMARY
04/02/2025 Letter INSPECTION SUMMARY
04/02/2025 Letter INSPECTION SUMMARY
04/02/2025 Letter INSPECTION SUMMARY
04/02/2025 Letter INSPECTION SUMMARY
04/02/2025 Letter INSPECTION SUMMARY
04/04/2025 Letter INSPECTION SUMMARY
04/04/2025 Letter INSPECTION SUMMARY
04/04/2025 Letter INSPECTION SUMMARY
04/04/2025 Plot Plan APPROVED AS BUILT PLOT PLAN
04/04/2025 Certificate/License Codes Temporary Certificate of Occupancy
04/04/2025 Receipt Receipt for transaction:2025-002051
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home