CMH PARKS INC
NEW SINGLE FAMILY
NEW HOUSE. UNFINISHED BASEMENT. UNCOVERED DECK. ROOF TRUSSES.
04/15/2024
04/26/2024
10/15/2024
04/09/2025
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
CMH PARKS INC, Address:5000 CLAYTON RD  
Summit Homes, Address:120 SE 30th St, Phone:(816) 434-5074 Ext:320  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
TYLER@SUMMITHOMESKC.COM  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
Water Tap Fee $3,760.00 $3,760.00 Paid 04/26/2024
Water Meter Fee $680.46 $680.46 Paid 04/26/2024
Sanitary Sewer Development Fee $2,159.00 $2,159.00 Paid 04/26/2024
Right of Way Permit Fee $85.00 $85.00 Paid 04/26/2024
Residential Excise Tax Fee $1,022.72 $1,022.72 Paid 04/26/2024
Valuation Fee New Single Family $1,598.10 $1,598.10 Paid 04/26/2024
Not Ready Inspection Fee $75.00 $75.00 Paid 12/04/2024
Not Ready Inspection Fee $75.00 $75.00 Paid 12/04/2024
Not Ready Inspection Fee $75.00 $75.00 Paid 12/04/2024
Not Ready Inspection Fee $75.00 $75.00 Paid 12/04/2024
Not Ready Inspection Fee $75.00 $75.00 Paid 12/04/2024
Not Ready Inspection Fee $75.00 $75.00 Paid 12/04/2024
3rd and Subsequent Inspection Fee (Per Hour) $100.00 $100.00 Paid 12/04/2024
Temporary Occupancy Fee $50.00 $50.00 Paid 12/20/2024
Temporary Occupancy Fee $50.00 $50.00 Paid 03/13/2025
Temporary Occupancy Fee $50.00 $50.00 Paid 03/13/2025
Temporary Occupancy Fee $50.00 $50.00 Paid 03/13/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Sewer Service Inspection - R Passed 5/30/2024 5/30/2024 05/30/2024
Water Service Inspection - R Passed 6/3/2024 6/3/2024 06/03/2024
Footing Inspection - Residential Passed 6/3/2024 06/03/2024
Erosion Control Inspection Residential Failed 6/13/2024 06/13/2024
DCM6 ESC INSP DENIED STREET CLEAN UP
Corrective Action Required
06/13/2024
STREET CLEAN UP REQUIRED IMMEDIATELY, AND SHALL BE COMPLETED PRIOR TO REQUESTED INSPECTION(S) BEING PERFORMED.
Underslab Plumbing Inspection - Residential Passed 6/13/2024 6/13/2024 06/13/2024
Erosion Control Inspection Residential Partial 7/18/2024 07/18/2024
DCM6 ESC INSP DENIED STREET CLEAN UP
Resolved
07/18/2024
STREET CLEAN UP REQUIRED IMMEDIATELY, AND SHALL BE COMPLETED PRIOR TO REQUESTED INSPECTION(S) BEING PERFORMED.
Miscellaneous Correction
Informational
07/18/2024
Erosion control measures are in place and must be maintained until CofO
All Rough Inspection - Residential Not Ready 8/30/2024 8/30/2024 08/30/2024
All Rough Inspection - Residential Partial 9/10/2024 9/10/2024 09/10/2024
Misc
Informational
09/10/2024
Garage portal frame inspection only, okay to cover
Electrical Service Inspection Failed 10/15/2024 10/15/2024 10/15/2024
Misc
Corrective Action Required
10/15/2024
Connect ufer ground to middle grounded bus bar.
Gas Service Inspection - Residential Passed 10/15/2024 10/15/2024 10/15/2024
All Rough Inspection - Residential Failed 10/15/2024 10/15/2024 10/15/2024
Misc
Resolved
10/15/2024
Garage portal frame inspection only, okay to cover
Misc
Corrective Action Required
10/15/2024
-missing libs throughout -fire block hvac chase in garage into ceiling space -anchor bolts to be within 12” of plate ends -secure SE Cable within 12” of disconnect -Boca plate for dwv in garage -could not inspect all garage to much trash and construction debris -seal penetrations in rear garage wall into furr down / ceiling space -missing attic access above 3rd car garage -address holes drilled closer than 2” to each other in floor joist 1st floor and basement (multiple places) -missing nails in strap at dryer vent -seal dead space at primary shower -missing truss hangers throughout -missing lateral bracing throughout -missing hold down device at stairs -missing ufer ground connection
All Rough Inspection - Residential Not Ready 10/29/2024 10/29/2024 10/29/2024
Misc
Corrective Action Required
10/15/2024
-install libs to plans -fire block hvac chase in garage into ceiling space(seal gaps) -anchor bolts to be within 12” of plate ends -secure SE Cable within 12” of disconnect -Boca plate for dwv in garage -could not inspect all garage to much trash and construction debris (drywall in way now) -seal penetrations in rear garage wall into furr down / ceiling space -address holes drilled closer than 2” to each other in floor joist 1st floor and basement (multiple places) -missing nails in strap at dryer vent -seal dead space at primary shower -missing lateral bracing throughout (some incorrectly installed) -missing hold down device at stairs(not installed fully)
Electrical Service Inspection Not Ready 10/29/2024 10/29/2024 10/29/2024
Misc
Corrective Action Required
10/15/2024
Connect ufer ground to middle grounded bus bar.
All Rough Inspection - Residential Not Ready 10/30/2024 10/30/2024
Misc
Corrective Action Required
10/29/2024
NO CHANGES MADE NOT READY -10/30/24 -install libs to plans -fire block hvac chase in garage into ceiling space(seal gaps) -anchor bolts to be within 12” of plate ends -secure SE Cable within 12” of disconnect -Boca plate for dwv in garage -could not inspect all garage to much trash and construction debris (drywall in way now) -seal penetrations in rear garage wall into furr down / ceiling space -address holes drilled closer than 2” to each other in floor joist 1st floor and basement (multiple places) -missing nails in strap at dryer vent -seal dead space at primary shower -missing lateral bracing throughout (some incorrectly installed) -missing hold down device at stairs(not installed fully)
Erosion Control Inspection Residential Partial 10/30/2024 10/30/2024 10/30/2024
Miscellaneous Correction
Resolved
10/30/2024
Erosion control measures are in place and must be maintained until CofO
All Rough Inspection - Residential Not Ready 11/4/2024 11/4/2024 11/04/2024
Misc
Corrective Action Required
10/30/2024
-secure SE Cable within 12” of disconnect -Boca plate for dwv in garage (install to code (extend above sill pate) -seal penetrations in rear garage wall into furr down / ceiling space -address holes drilled closer than 2” to each other in floor joist 1st floor and basement (multiple places) -missing nails in strap at dryer vent -seal dead space at primary shower(missing some spots) -missing lateral bracing throughout 2nd floor -missing hold down device at stairs(not installed fully)
All Rough Inspection - Residential Failed 11/6/2024 11/6/2024 11/06/2024
Misc
Corrective Action Required
11/04/2024
-address holes drilled closer than 2” to each other in floor joist 1st floor and basement (multiple places) provide engineer letter for fix -seal dead space at primary shower(missing some spots) -missing lateral bracing throughout 2nd floor
Electrical Service Inspection Not Ready 11/6/2024 11/6/2024 11/06/2024
Misc
Corrective Action Required
10/29/2024
Connect ufer ground to middle grounded bus bar.
Electrical Service Inspection Passed 11/8/2024 11/8/2024 11/08/2024
Misc
Resolved
11/08/2024
Connect ufer ground to middle grounded bus bar.
All Rough Inspection - Residential Passed 11/8/2024 11/8/2024 11/08/2024
Misc
Resolved
11/08/2024
-address holes drilled closer than 2” to each other in floor joist 1st floor and basement (multiple places) provide engineer letter for fix -seal dead space at primary shower(missing some spots) -missing lateral bracing throughout 2nd floor
Driveway Inspection Partial 11/21/2024 11/21/2024 11/21/2024
Misc
Informational
11/21/2024
11-21-24 Dustin A, DW is formed and compacted. Will need to maintain ADA compliance. Approved to pour
Miscellaneous Inspection Partial 11/21/2024 11/21/2024 11/21/2024
Misc
Corrective Action Required
11/21/2024
11-21-24 Dustin A, Curb is formed and compacted . Approved to pour
Driveway Inspection Partial 12/2/2024 12/2/2024 11/21/2024
Misc
Informational
11/21/2024
11-21-24 Dustin A, DW is formed and compacted. Will need to maintain ADA compliance. Approved to pour. Must cover over night and informed contractor that ground and air temp needs to be above freezing before they can pour.
Sidewalk Inspection Partial 11/21/2024 11/21/2024 11/21/2024
Misc
Informational
11/21/2024
11-21-24 Dustin A, SW is formed and compacted. Will need to maintain ADA compliance. Approved to pour. Must cover over night and informed contractor that ground and air temp needs to be above freezing before they can pour.
Miscellaneous Inspection Passed 12/2/2024 12/2/2024 12/02/2024
Misc
Corrective Action Required
11/21/2024
11-21-24 Dustin A, Curb is formed and compacted . Approved to pour 12-2-24 Dustin A, curb is poured to city specs. Pass
Driveway Inspection Passed 12/2/2024 12/2/2024 12/02/2024
Misc
Informational
11/21/2024
11-21-24 Dustin A, DW is formed and compacted. Will need to maintain ADA compliance. Approved to pour. Must cover over night and informed contractor that ground and air temp needs to be above freezing before they can pour 12-2-24 Dustin A, DW is poured to city specs and slopes are in compliance. Passed
Occupancy Inspection - Codes Residential Failed 12/18/2024 12/18/2024 12/18/2024
Misc
Corrective Action Required
12/18/2024
-provide as graded plot plan -address pending sidewalk inspection -Final grade and sod -uncover covered water meter, ensure meter well lid flush with grade. Ensure 14”-18” from top of meter to well lid ring. -provide handrail at front stoop steps -smoke detectors not linked together, missing detector on main floor
Occupancy Inspection - Codes Residential Failed 12/18/2024 12/18/2024 12/18/2024
Misc
Corrective Action Required
12/18/2024
-provide as graded plot plan -address pending sidewalk inspection -Final grade and sod -uncover covered water meter, ensure meter well lid flush with grade. Ensure 14”-18” from top of meter to well lid ring. -provide handrail at front stoop steps -smoke detectors not linked together, missing detector on main floor --all receptacles in unfinished spaces to be GFCI protected or single pull receptacle and labeled “non GFCI”
Sidewalk Inspection Failed 12/18/2024 12/18/2024 12/18/2024
Misc
Informational
11/21/2024
11-21-24 Dustin A, SW is formed and compacted. Will need to maintain ADA compliance. Approved to pour. Must cover over night and informed contractor that ground and air temp needs to be above freezing before they can pour. 12-18-24 DP. SW was poured, contractor did not use an Isolation join between the sidewalk and DW approach. One panel on each side of the driveway will need to be removed and repoured with proper expansion joint installed. Also, the sidewalk on the north side of the driveway approach will need to be removed due to tacks being in the concrete. There is what looks like bicycle marks, multiple foot prints and marks from a 5 gallon buck all over the sidewalk. After this is removed and before you repour, there needs to be a pre pour inspection scheduled. Failed
Occupancy Inspection - Codes Residential Failed 12/20/2024 12/20/2024 12/20/2024
Misc
Corrective Action Required
12/18/2024
-provide as graded plot plan -address pending sidewalk inspection -Final grade and sod -splash blocks and some pump discharge to extend 36 inches from foundation
Occupancy Inspection - Codes Residential Ready for Temp CO 12/20/2024 12/20/2024 12/20/2024
Misc
Corrective Action Required
12/20/2024
-provide as graded plot plan -address pending sidewalk inspection -Final grade and sod -splash blocks and some pump discharge to extend 36 inches from foundation
Sidewalk Inspection Partial 12/23/2024
Misc
Informational
12/18/2024
11-21-24 Dustin A, SW is formed and compacted. Will need to maintain ADA compliance. Approved to pour. Must cover over night and informed contractor that ground and air temp needs to be above freezing before they can pour. 12-18-24 DP. SW was poured, contractor did not use an Isolation join between the sidewalk and DW approach. One panel on each side of the driveway will need to be removed and repoured with proper expansion joint installed. Also, the sidewalk on the north side of the driveway approach will need to be removed due to tacks being in the concrete. There is what looks like bicycle marks, multiple foot prints and marks from a 5 gallon buck all over the sidewalk. After this is removed and before you repour, there needs to be a pre pour inspection scheduled. Failed 12-23-24 Dustin A, Panels removed, slopes and aggregate in compliance. Approved to pour
Sidewalk Inspection Partial 1/3/2025 1/3/2025 01/02/2025
Misc
Informational
12/23/2024
11-21-24 Dustin A, SW is formed and compacted. Will need to maintain ADA compliance. Approved to pour. Must cover over night and informed contractor that ground and air temp needs to be above freezing before they can pour. 12-18-24 DP. SW was poured, contractor did not use an Isolation join between the sidewalk and DW approach. One panel on each side of the driveway will need to be removed and repoured with proper expansion joint installed. Also, the sidewalk on the north side of the driveway approach will need to be removed due to tacks being in the concrete. There is what looks like bicycle marks, multiple foot prints and marks from a 5 gallon buck all over the sidewalk. After this is removed and before you repour, there needs to be a pre pour inspection scheduled. Failed 12-23-24 Dustin A, Panels removed, slopes and aggregate in compliance. Approved to pour 1-2-25 Dustin A, SW has been poured, and slopes are in compliance. Cannot pass until forms are pulled.
Sidewalk Inspection Passed 4/8/2025 4/8/2025 04/08/2025
Misc
Informational
01/02/2025
11-21-24 Dustin A, SW is formed and compacted. Will need to maintain ADA compliance. Approved to pour. Must cover over night and informed contractor that ground and air temp needs to be above freezing before they can pour. 12-18-24 DP. SW was poured, contractor did not use an Isolation join between the sidewalk and DW approach. One panel on each side of the driveway will need to be removed and repoured with proper expansion joint installed. Also, the sidewalk on the north side of the driveway approach will need to be removed due to tacks being in the concrete. There is what looks like bicycle marks, multiple foot prints and marks from a 5 gallon buck all over the sidewalk. After this is removed and before you repour, there needs to be a pre pour inspection scheduled. Failed 12-23-24 Dustin A, Panels removed, slopes and aggregate in compliance. Approved to pour 1-2-25 Dustin A, SW has been poured, and slopes are in compliance. Cannot pass until forms are pulled. 4-8-25 Dustin A, forms pulled. Passed
Plot Plan Inspection Passed 4/9/2025 04/09/2025
Erosion Control Inspection Residential Passed 04/09/2025
Occupancy Inspection - Codes Residential Full C of O 1/19/2025 04/09/2025
Misc
Resolved
04/09/2025
-provide as graded plot plan -address pending sidewalk inspection -Final grade and sod -splash blocks and some pump discharge to extend 36 inches from foundation
Documents & Images
Date Uploaded File Type Document Name
04/15/2024 HT #149 - ENGINEERED PLANS
04/15/2024 HT #149 - PERMIT APP
04/15/2024 HT #149 - PLOT PLAN
04/15/2024 HT #149 - TRUSS DETAILS
04/15/2024 HT #149 - TRUSS LAYOUT
04/18/2024 Permit Codes Residential Plan Review
04/19/2024 HT #149 - ENGINEERED PLANS - CITY
04/22/2024 Approved Plans APPROVED PLANS
04/24/2024 Plot Plan APPROVED PLOT PLAN
04/24/2024 Approved Plans APPROVED TRUSS PACKAGE
04/24/2024 Permit Codes Residential Plan Review
04/26/2024 Permit DS Building Permit
04/26/2024 Receipt Receipt for transaction:2024-002674
05/03/2024 3RD Party Insp Report THIRD PARTY FOOTING INSPECTION
05/09/2024 Approved Plans APPROVED TRUSS LAYOUT
05/09/2024 Plot Plan 5-8-24 APPROVED PLOT PLAN
05/30/2024 Letter INSPECTION SUMMARY
06/03/2024 Letter INSPECTION SUMMARY
06/03/2024 Letter INSPECTION SUMMARY
06/13/2024 Letter INSPECTION SUMMARY
06/13/2024 Letter INSPECTION SUMMARY
07/08/2024 Approved Plans 7-8-24 APPROVED TRUSS LAYOUT
07/08/2024 Approved Plans 7-8-24 APPROVED TRUSS PACKAGE
07/08/2024 Approved Plans 7-8-24 APPROVED PLANS
07/08/2024 Plot Plan 7-8-24 APPROVED PLOT PLAN
07/18/2024 Letter INSPECTION SUMMARY
08/30/2024 Letter INSPECTION SUMMARY
09/10/2024 Letter INSPECTION SUMMARY
10/15/2024 Letter INSPECTION SUMMARY
10/15/2024 Letter INSPECTION SUMMARY
10/15/2024 Letter INSPECTION SUMMARY
10/29/2024 Letter INSPECTION SUMMARY
10/29/2024 Letter INSPECTION SUMMARY
10/30/2024 Letter INSPECTION SUMMARY
10/30/2024 Letter INSPECTION SUMMARY
11/04/2024 Letter INSPECTION SUMMARY
11/06/2024 Letter INSPECTION SUMMARY
11/06/2024 Letter INSPECTION SUMMARY
11/07/2024 Engineer Report/Study ENGINEER LETTER
11/08/2024 Letter INSPECTION SUMMARY
11/08/2024 Letter INSPECTION SUMMARY
11/21/2024 Letter INSPECTION SUMMARY
11/21/2024 Letter INSPECTION SUMMARY
11/21/2024 Letter INSPECTION SUMMARY
11/21/2024 Letter INSPECTION SUMMARY
12/02/2024 Letter INSPECTION SUMMARY
12/02/2024 Letter INSPECTION SUMMARY
12/04/2024 Receipt Receipt for transaction:2024-009309
12/18/2024 Letter INSPECTION SUMMARY
12/18/2024 Letter INSPECTION SUMMARY
12/18/2024 Letter INSPECTION SUMMARY
12/20/2024 Letter INSPECTION SUMMARY
12/20/2024 Letter INSPECTION SUMMARY
12/20/2024 Certificate/License Codes Temporary Certificate of Occupancy
12/20/2024 Receipt Receipt for transaction:2024-009631
12/23/2024 Letter INSPECTION SUMMARY
01/02/2025 Letter INSPECTION SUMMARY
02/26/2025 HT #193 - TCO Extension 2_14_25
03/13/2025 Certificate/License Codes Temporary Certificate of Occupancy
03/13/2025 Certificate/License Codes Temporary Certificate of Occupancy
03/13/2025 Certificate/License Codes Temporary Certificate of Occupancy
03/13/2025 Receipt Receipt for transaction:2025-001539
04/08/2025 Plot Plan APPROVED AS GRADED PLOT PLAN
04/08/2025 Letter INSPECTION SUMMARY
04/09/2025 Letter INSPECTION SUMMARY
04/09/2025 Letter INSPECTION SUMMARY
04/09/2025 Letter Field Certificate of Occupancy
04/09/2025 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home