Permit Application Status

PRRES20241727


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20241727
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - FINISHED AND UNFINISHED BASEMENT - COVERED DECK
04/09/2024
04/16/2024
10/07/2024
04/10/2025
Locations
Contacts
WALKER CUSTOM HOMES, LLC, Address:PO BOX 3194, Phone:(913) 208-2026  
Jason walker, Address:PO Box 247, Phone:(913) 208-2026  
WALKERCUSTOMHOMESKC@GMAIL.COM  
5 STAR HEATING & COOLING, Address:211 NW 12TH, Phone:(816) 517-3341  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
TRI-COUNTY PLUMBING LLC, Address:PO BOX 234, Phone:(816) 720-3222  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331507-Sanitary Sewer Development Fee $2,159.00 $2,159.00 Paid 04/16/2024
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 04/16/2024
7232302-Residential License Tax Fee $1,022.72 $1,022.72 Paid 04/16/2024
8331401-Water Tap Fee $3,760.00 $3,760.00 Paid 04/16/2024
8350015-Water Meter Fee $680.46 $680.46 Paid 04/16/2024
9110078-Valuation Fee New Single Family $1,775.75 $1,775.75 Paid 04/16/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 05/09/2024
Sewer Service Inspection - R Passed 5/9/2024 5/9/2024 05/09/2024
Water Service Inspection - R Passed 5/9/2024 5/9/2024 05/09/2024
Underslab Plumbing Inspection - Residential Passed 5/16/2024 5/16/2024 05/16/2024
Erosion Control Inspection Residential Failed 07/11/2024
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
07/11/2024
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. -MAINTAIN SILT FENCE -MAINTAIN OVERGROWN VEGETATION AROUND ENTIRE LOT
Gas Service Inspection - Residential Failed 8/2/2024 8/2/2024 08/02/2024
Misc
Corrective Action Required
08/02/2024
No pressure at gas gauge
Electrical Service Inspection Passed 8/2/2024 8/2/2024 08/02/2024
All Rough Inspection - Residential Failed 8/2/2024 8/2/2024 08/02/2024
Misc
Corrective Action Required
08/02/2024
-pfh nailing incomplete uncover covered areas -nail plate under pfh header to header,(see detail on plans) -provide full bearing under (3) Lvl at garage great room entry -fireblock wall space to ceiling space in this area -address rafters bearing no to plans or code -uncover covered rear deck for inspection -fire block furr down ends in basement -provide support for furr down ceiling joist to floor joists above -remove blocking for return air in rec room and pan in furr down -pan return air joist space for bed 3 -seal around supply vents going through return air panning
Gas Service Inspection - Residential Passed 8/15/2024 8/15/2024 08/15/2024
Misc
Resolved
08/15/2024
No pressure at gas gauge
All Rough Inspection - Residential Failed 8/15/2024 8/15/2024 08/15/2024
Misc
Corrective Action Required
08/02/2024
-uncover covered rear deck for inspection and fix to engineer specifications -seal around supply vents going through return air panning
All Rough Inspection - Residential Failed 8/19/2024 8/19/2024 08/19/2024
Misc
Corrective Action Required
08/15/2024
-uncover covered rear deck for inspection and fix to engineer specifications
All Rough Inspection - Residential Passed 8/21/2024 8/21/2024 08/21/2024
Misc
Resolved
08/21/2024
-uncover covered rear deck for inspection and fix to engineer specifications
Driveway Inspection Partial 9/20/2024 09/20/2024
Misc
Informational
09/20/2024
9-20-24 Dustin A, DW is formed and compacted. Approved to pour.
Sidewalk Inspection Partial 9/20/2024 9/20/2024 09/20/2024
Misc
Informational
09/20/2024
9-20-24 Dustin A, SW has been formed and compacted. Slopes are in compliance at this time. Must maintain ADA compliance . Approved to pour
Driveway Inspection Passed 9/27/2024 9/27/2024 09/25/2024
Misc
Informational
09/20/2024
9-20-24 Dustin A, DW is formed and compacted. Approved to pour. 9-25-24 Dustin A, DW is poured to city specs and slopes are in compliance. Pass
Sidewalk Inspection Passed 9/27/2024 9/27/2024 09/25/2024
Misc
Informational
09/20/2024
9-20-24 Dustin A, SW has been formed and compacted. Slopes are in compliance at this time. Must maintain ADA compliance . Approved to pour 9-25-24 Dustin A, SW is poured to city specs and slopes are in compliance. Pass
Occupancy Inspection - Codes Residential Failed 3/5/2025 3/6/2025 03/06/2025
Misc
Corrective Action Required
03/06/2025
-sod -will check water meter at time of sod(ensure 14”-18” from top of meter to top of well ring lid) -provide spark ring at outlet above fireplace -paint gas line at deck -re-establish erosion control at rear of lot -ensure all exterior penetrations are sealed
Erosion Control Inspection Residential Failed 03/06/2025
DCM3 ESC REQUIRED 2 DAY
Resolved
03/06/2025
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. -MAINTAIN SILT FENCE -MAINTAIN OVERGROWN VEGETATION AROUND ENTIRE LOT
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
03/06/2025
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. Maintain erosion control at rear of lot
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
03/06/2025
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Plot Plan Inspection Passed 4/1/2025 04/01/2025
Erosion Control Inspection Residential Passed 04/10/2025
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
03/06/2025
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. Maintain erosion control at rear of lot
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
03/06/2025
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Occupancy Inspection - Codes Residential Full C of O 4/10/2025 4/10/2025 04/10/2025
Misc
Resolved
04/10/2025
-sod -will check water meter at time of sod(ensure 14”-18” from top of meter to top of well ring lid) -provide spark ring at outlet above fireplace -paint gas line at deck -re-establish erosion control at rear of lot -ensure all exterior penetrations are sealed
Documents & Images
Date Uploaded File Type Document Name
04/09/2024 2813 SW Heartland Signed City Docs
04/09/2024 LOT 183 FINAL SURVEY
04/09/2024 RHF183 Spec - Sealed Plans (Apr 8, 2024)
04/10/2024 Permit Codes Residential Plan Review
04/10/2024 Approved Plans APPROVED PLANS
04/14/2024 LOT 183 CITY REVISED PLOT PLAN
04/15/2024 Plot Plan APPROVED PLOT PLAN
04/15/2024 Permit Codes Residential Plan Review
04/16/2024 Permit DS Building Permit
04/16/2024 Receipt Receipt for transaction:2024-002446
04/22/2024 Final_2024_04_19_PierLayout_LSMO_Walker Custom Homes
04/22/2024 3RD Party Insp Report THIRD PARTY PIER SITE INSPECTION
04/22/2024 Approved Plans APPROVED PIER PLAN
05/01/2024 3RD Party Insp Report THIRD PARTY FOOTING INSPECTION
05/09/2024 Letter INSPECTION SUMMARY
05/09/2024 Letter INSPECTION SUMMARY
05/09/2024 Letter INSPECTION SUMMARY
05/16/2024 Letter INSPECTION SUMMARY
05/16/2024 3RD Party Insp Report Pier inspection report
07/11/2024 Letter INSPECTION SUMMARY
08/02/2024 Letter INSPECTION SUMMARY
08/02/2024 Letter INSPECTION SUMMARY
08/02/2024 Letter INSPECTION SUMMARY
08/08/2024 Engineer Report/Study ENGINEER LETTER
08/15/2024 Letter INSPECTION SUMMARY
08/15/2024 Letter INSPECTION SUMMARY
08/19/2024 Letter INSPECTION SUMMARY
08/21/2024 Letter INSPECTION SUMMARY
09/20/2024 Letter INSPECTION SUMMARY
09/20/2024 Letter INSPECTION SUMMARY
09/25/2024 Letter INSPECTION SUMMARY
09/25/2024 Letter INSPECTION SUMMARY
02/12/2025 Letter Codes 140 Day Letter
03/06/2025 Letter INSPECTION SUMMARY
03/06/2025 Letter INSPECTION SUMMARY
03/28/2025 LOT 183 ASBUILT
03/31/2025 Plot Plan APPROVED AS GRADED PLOT PLAN
04/01/2025 Letter INSPECTION SUMMARY
04/10/2025 Letter INSPECTION SUMMARY
04/10/2025 Letter Field Certificate of Occupancy
04/10/2025 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home