Permit Application Status

PRRES20241304


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20241304
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE. FINISHED/UNFINISHED BASEMENT. WALKOUT BASEMENT. COVERED DECK. STOP WORK ORDER generated on 04/18/2025 12:00 AM by username 'Robb Popp'. STOP WORK ORDER removed on 04/28/2025 12:00 AM by username 'Robb Popp'.
03/20/2024
04/30/2024
09/24/2024
06/27/2025
Locations
Contacts
KC CUSTOM HOMES, Address:406 NW DONOVAN RD, Phone:(816) 564-5149  
Steve Froehlich, Address:406 NW Donovan Rd  
PRAIRIE CENTER PLUMBING HEATING & A/C, Address:242 N MARION, Phone:(913) 829-6263  
Arrow Circle Electric, Address:7801 Blue Ridge Blvd , Phone:(816) 373-4888  
PRAIRIE CENTER PLUMBING HEATING & A/C, Address:242 N MARION, Phone:(913) 829-6263  
STEVE@KC-CUSTOMHOMES.COM  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
Water Tap Fee $3,760.00 $3,760.00 Paid 04/30/2024
Water Meter Fee $680.46 $680.46 Paid 04/30/2024
Sanitary Sewer Development Fee $2,159.00 $2,159.00 Paid 04/30/2024
Right of Way Permit Fee $85.00 $85.00 Paid 04/30/2024
Residential Excise Tax Fee $1,022.72 $1,022.72 Paid 04/30/2024
Valuation Fee New Single Family $1,794.30 $1,794.30 Paid 04/30/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 5/14/2024 5/14/2024 05/14/2024
Misc
Resolved
05/16/2024
-Engineered letter was not downloaded to the portal at the time of the inspection. -I was able to read the letter at the time of the inspection the job site foreman had a copy on his phone. PASSED (AF 5/14/24)
Erosion Control Inspection Residential Partial 7/12/2024 7/12/2024 07/12/2024
Misc
Corrective Action Required
07/12/2024
In compliance at time of inspection
Underslab Plumbing Inspection - Residential Passed 7/12/2024 7/12/2024 07/12/2024
Sewer Service Inspection - R Passed 7/17/2024 07/17/2024
Erosion Control Inspection Residential Failed 7/17/2024 07/17/2024
Misc
Resolved
07/17/2024
In compliance at time of inspection
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
07/17/2024
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 7/17/24 AF
Misc
Corrective Action Required
07/17/2024
- No address posted
Water Service Inspection - R Passed 7/22/2024 07/22/2024
Erosion Control Inspection Residential Failed 8/20/2024 08/20/2024
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
07/17/2024
8/20/24 EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. -RESTORE MISSING SILT FENCE AND CLEAN DEBRIS FROM STREET
Misc
Resolved
08/20/2024
Erosion Control Inspection Residential Failed 9/19/2024 09/19/2024
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
08/20/2024
9/19/24 EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. -RESTORE MISSING SILT FENCE AND CLEAN DEBRIS FROM STREET
Erosion Control Inspection Residential Partial 9/25/2024 9/25/2024 09/25/2024
DCM3 ESC REQUIRED 2 DAY
Resolved
09/25/2024
9/19/24 EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. -RESTORE MISSING SILT FENCE AND CLEAN DEBRIS FROM STREET
Misc
Informational
09/25/2024
Erosion control in compliance at time of inspection
All Rough Inspection - Residential Not Ready 10/24/2024 10/24/2024 10/24/2024
Miscellaneous Correction
Corrective Action Required
10/24/2024
-All garage bottom plate are required to have 2 anchor bolts per board installed -Nail all garage corners to code -Garage anchor bolts must be in the middle 1/3 of bottom plate -Rafter ties are not installed throughout -Support ridge cantilever by valley above double car garage -All purlin support struts need to be placed every 4 feet on center -Garage to bedroom two top plate at exterior corner is not tied in together -Windows in the garage that are not on the floor plan needs the header to be nail into the king stud -Garage attic access light is not installed -Roof purlin support struts need to have double kings studs installed for vertical load transfer support at laundry room -Two LVL’s in master bathroom are not installed -Top plate above vanity in master bathroom needs to be tied together -Vertically support purlin strut in master bedroom to great room with with 2 king studs -Great room vault ceiling joist by stairs needs to be fastened to the above ceiling header -Great room vaulted ceiling joist above the hallway to the laundry room needs a joist hanger installed -Electrical nail guard in needs in bedroom 2 north wall between exterior corner and foyer entry -Top plate does not overlap at Foyer 2x6 wall and bedroom 2 wall at top plate T -Electrical nail guard is need in bedroom two at top plate for 10/2 wire -5 electrical lines are hanging from the ceiling in the kitchen Inspection stopped because house is not ready for inspection This is not a complete inspection and this is not a complete list
Erosion Control Inspection Residential Partial 10/24/2024 10/24/2024 10/24/2024
Misc
Informational
09/25/2024
Erosion control in compliance at time of inspection
All Rough Inspection - Residential Failed 11/7/2024 11/7/2024 11/07/2024
Miscellaneous Correction
Resolved
11/07/2024
-All garage bottom plate are required to have 2 anchor bolts per board installed -Nail all garage corners to code -Garage anchor bolts must be in the middle 1/3 of bottom plate -Rafter ties are not installed throughout -Support ridge cantilever by valley above double car garage -All purlin support struts need to be placed every 4 feet on center -Garage to bedroom two top plate at exterior corner is not tied in together -Windows in the garage that are not on the floor plan needs the header to be nail into the king stud -Garage attic access light is not installed -Roof purlin support struts need to have double kings studs installed for vertical load transfer support at laundry room -Two LVL’s in master bathroom are not installed -Top plate above vanity in master bathroom needs to be tied together -Vertically support purlin strut in master bedroom to great room with with 2 king studs -Great room vault ceiling joist by stairs needs to be fastened to the above ceiling header -Great room vaulted ceiling joist above the hallway to the laundry room needs a joist hanger installed -Electrical nail guard in needs in bedroom 2 north wall between exterior corner and foyer entry -Top plate does not overlap at Foyer 2x6 wall and bedroom 2 wall at top plate T -Electrical nail guard is need in bedroom two at top plate for 10/2 wire -5 electrical lines are hanging from the ceiling in the kitchen Inspection stopped because house is not ready for inspection This is not a complete inspection and this is not a complete list
Miscellaneous Correction
Corrective Action Required
11/07/2024
361 NW Patch Ct. all rough (2) -Nail all garage corner to code (tie in 2x4 north wall to double car garage corner) -Garage anchor bolts must be in the middle 1/3 of bottom plate -Install rafter collar ties in garage above double car garage between Ibeam and master closet -Support ridge cantilever by valley above double car garage -Two LVL’s in master bathroom are not installed -Rafter collar ties are needed above the office -Fire block and install nail plate at electrical above kitchen refrigerator at top plate -Fire place electrical receptacle is in the chase and must remain accessible -Deck double LVL at gable end is not vertically supported -Fire block 2x10 cantilever joist in mechanical room to exterior west wall -Latterly secure electrical service cable in basement raceway chase -Vertically load support double floor joist at bedroom 3 exterior wall -Family room patio header with king and jack studs is not built per plan -3 sections of fire blocking above Ibeam in family room is not installed -Joist hanger is missing at deck -Post to beam connection at the NE corner of the deck does not have the proper fasteners
Electrical Service Inspection Passed 11/7/2024 11/7/2024 11/07/2024
Gas Service Inspection - Residential Passed 11/7/2024 11/7/2024 11/07/2024
Erosion Control Inspection Residential Partial 11/7/2024 11/07/2024
Misc
Resolved
10/31/2024
Erosion control in compliance at time of inspection
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
10/31/2024
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. -Restore erosion control methods
Erosion Control Inspection Residential Partial 11/7/2024 11/07/2024
DCM2 ESC DEFICIENT INSTALLATION
Resolved
11/07/2024
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. -Restore erosion control methods
Miscellaneous Correction
Informational
11/07/2024
Full erosion control measures are in place and must be properly maintained until CofO
All Rough Inspection - Residential Passed 11/27/2024 11/27/2024 11/27/2024
Miscellaneous Correction
Resolved
11/27/2024
361 NW Patch Ct. all rough (2) -Nail all garage corner to code (tie in 2x4 north wall to double car garage corner) -Garage anchor bolts must be in the middle 1/3 of bottom plate -Install rafter collar ties in garage above double car garage between Ibeam and master closet -Support ridge cantilever by valley above double car garage -Two LVL’s in master bathroom are not installed -Rafter collar ties are needed above the office -Fire block and install nail plate at electrical above kitchen refrigerator at top plate -Fire place electrical receptacle is in the chase and must remain accessible -Deck double LVL at gable end is not vertically supported -Fire block 2x10 cantilever joist in mechanical room to exterior west wall -Latterly secure electrical service cable in basement raceway chase -Vertically load support double floor joist at bedroom 3 exterior wall -Family room patio header with king and jack studs is not built per plan -3 sections of fire blocking above Ibeam in family room is not installed -Joist hanger is missing at deck -Post to beam connection at the NE corner of the deck does not have the proper fasteners
Driveway Inspection Partial 4/1/2025 4/1/2025 04/01/2025
Misc
Informational
04/01/2025
04/01/25 Tuesday JMJ Pre-inspection driveway passed inspection.
Sidewalk Inspection Partial 4/1/2025 4/1/2025 04/01/2025
Misc
Informational
04/01/2025
04/01/25 Tuesday JMJ Pre-inspection sidewalk passed inspection.
Driveway Inspection Passed 4/8/2025 04/08/2025
Misc
Informational
04/01/2025
04/01/25 Tuesday JMJ Pre-inspection driveway passed inspection.
Misc
Informational
04/08/2025
04/08/25 Tuesday Driveway passed.
Sidewalk Inspection Passed 4/8/2025 04/08/2025
Misc
Informational
04/01/2025
04/01/25 Tuesday JMJ Pre-inspection sidewalk passed inspection.
Misc
Informational
04/08/2025
04/08/25 Tuesday Pass Sidewalk.
Erosion Control Inspection Residential Failed 4/14/2025 04/14/2025
Miscellaneous Correction
Resolved
04/14/2025
Full erosion control measures are in place and must be properly maintained until CofO
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
04/14/2025
4/14/25 EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. -Reestablish erosion control at perimeter, clean debris from street
Erosion Control Inspection Residential Failed - Stop Work 4/18/2025 04/18/2025
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
04/14/2025
4/14/25 EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. -Reestablish erosion control at perimeter, clean debris from street 4/18/25 Still no BMPs in place, STOP WORK ISSUED
Erosion Control Inspection Residential Passed 4/28/2025 4/28/2025 04/28/2025
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
04/28/2025
4/14/25 EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. -Reestablish erosion control at perimeter, clean debris from street 4/18/25 Still no BMPs in place, STOP WORK ISSUED
Plot Plan Inspection Failed 5/8/2025 5/8/2025 05/08/2025
Misc
Corrective Action Required
05/08/2025
As graded plot plan required
Occupancy Inspection - Codes Residential Failed 5/8/2025 5/8/2025 05/08/2025
Misc
Corrective Action Required
05/08/2025
-Sidewalk Inspection pending -As graded plot plan required -Complete sod at back and splash blocks -Stairs at deck over 3/8" variance in rise -All exterior receptacles to be rated for wet location -Provide lockout at all hardwired appliances -GFCI at front not working -Provide min 1.5" clearance at basement handrail -GFCI protection required at receptacle within 6' of sink at basement bar area -Receptacle at basement bar required to be within 24" of sink on left side -Install hanger or 1.5" of bearing at end joists to post -Install (2) 1/2" through bolts at front post to beam connection -Provide anti siphon device at hose bib -Label electrical panel breaker spaces -Provide sediment trap at gas piping to furnace -Label non GFCI receptacle at sump pump -Seal exterior penetrations at water and sump pump lines -Remove mud from water meter pit
Occupancy Inspection - Codes Residential Failed 6/23/2025 6/23/2025 06/23/2025
Misc
Corrective Action Required
05/08/2025
CALLED NO ANSWER, NO ACCESS -Sidewalk Inspection pending -As graded plot plan required -Complete sod at back and splash blocks -Stairs at deck over 3/8" variance in rise -All exterior receptacles to be rated for wet location -Provide lockout at all hardwired appliances -GFCI at front not working -Provide min 1.5" clearance at basement handrail -GFCI protection required at receptacle within 6' of sink at basement bar area -Receptacle at basement bar required to be within 24" of sink on left side -Install hanger or 1.5" of bearing at end joists to post -Install (2) 1/2" through bolts at front post to beam connection -Provide anti siphon device at hose bib -Label electrical panel breaker spaces -Provide sediment trap at gas piping to furnace -Label non GFCI receptacle at sump pump -Seal exterior penetrations at water and sump pump lines -Remove mud from water meter pit
Occupancy Inspection - Codes Residential Full C of O 6/27/2025 6/27/2025 06/27/2025
Misc
Resolved
06/27/2025
CALLED NO ANSWER, NO ACCESS -Sidewalk Inspection pending -As graded plot plan required -Complete sod at back and splash blocks -Stairs at deck over 3/8" variance in rise -All exterior receptacles to be rated for wet location -Provide lockout at all hardwired appliances -GFCI at front not working -Provide min 1.5" clearance at basement handrail -GFCI protection required at receptacle within 6' of sink at basement bar area -Receptacle at basement bar required to be within 24" of sink on left side -Install hanger or 1.5" of bearing at end joists to post -Install (2) 1/2" through bolts at front post to beam connection -Provide anti siphon device at hose bib -Label electrical panel breaker spaces -Provide sediment trap at gas piping to furnace -Label non GFCI receptacle at sump pump -Seal exterior penetrations at water and sump pump lines -Remove mud from water meter pit
Documents & Images
Date Uploaded File Type Document Name
03/20/2024 155 Woodside Ridge Staked
03/20/2024 SF-7044 (361 PATCH CT) Engineered
03/20/2024 Building Permit Application
03/20/2024 Excise Tax Application
03/26/2024 Permit Codes Residential Plan Review
03/27/2024 155 Woodside Ridge Revised per comments
03/28/2024 Permit Codes Residential Plan Review
03/29/2024 Plot Plan Revised
04/02/2024 Plot Plan APPROVED PLOT PLAN
04/02/2024 Permit Codes Residential Plan Review
04/02/2024 Approved Plans APPROVED PLANS
04/30/2024 Permit DS Building Permit
04/30/2024 Receipt Receipt for transaction:2024-002749
05/14/2024 Letter INSPECTION SUMMARY
05/15/2024 361 Patch Ct Soil Insp
05/16/2024 Letter INSPECTION SUMMARY
07/12/2024 Letter INSPECTION SUMMARY
07/12/2024 Letter INSPECTION SUMMARY
07/17/2024 Letter INSPECTION SUMMARY
07/17/2024 Letter INSPECTION SUMMARY
07/22/2024 Letter INSPECTION SUMMARY
08/20/2024 Letter INSPECTION SUMMARY
08/20/2024 Letter INSPECTION SUMMARY
09/19/2024 Letter INSPECTION SUMMARY
09/25/2024 Letter INSPECTION SUMMARY
10/24/2024 Letter INSPECTION SUMMARY
10/24/2024 Letter INSPECTION SUMMARY
10/31/2024 Letter INSPECTION SUMMARY
11/07/2024 Letter INSPECTION SUMMARY
11/07/2024 Letter INSPECTION SUMMARY
11/07/2024 Letter INSPECTION SUMMARY
11/07/2024 Letter INSPECTION SUMMARY
11/07/2024 Letter INSPECTION SUMMARY
11/19/2024 Approved Plans 11-19-24 APPROVED PLANS
11/27/2024 Letter INSPECTION SUMMARY
04/01/2025 Letter INSPECTION SUMMARY
04/01/2025 Letter INSPECTION SUMMARY
04/08/2025 Letter INSPECTION SUMMARY
04/08/2025 Letter INSPECTION SUMMARY
04/14/2025 Letter INSPECTION SUMMARY
04/18/2025 Letter Stop Work Order
04/25/2025 Sprinkler ROW and Plot Plan
04/28/2025 Letter INSPECTION SUMMARY
04/28/2025 Letter INSPECTION SUMMARY
05/08/2025 Letter INSPECTION SUMMARY
05/08/2025 Letter INSPECTION SUMMARY
05/13/2025 361 NW Patch As Graded plot plan
06/23/2025 Letter INSPECTION SUMMARY
06/27/2025 Letter Codes Final Certificate of Occupancy
06/27/2025 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home