Permit Application Status

PRRES20241004


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20241004
Building Permit - Residential
Issued
NEW SINGLE FAMILY
NEW HOUSE - FINISHED AND UNFINISHED BASEMENT - COVERED DECK
03/05/2024
03/11/2024
Locations
Contacts
WALKER CUSTOM HOMES, LLC, Address:PO BOX 3194, Phone:(913) 208-2026  
Jason walker, Address:PO Box 247, Phone:(913) 208-2026  
WALKERCUSTOMHOMESKC@GMAIL.COM  
5 STAR HEATING & COOLING, Address:211 NW 12TH, Phone:(816) 517-3341  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
TRI-COUNTY PLUMBING LLC, Address:PO BOX 234, Phone:(816) 720-3222  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331507-Sanitary Sewer Development Fee $2,159.00 $2,159.00 Paid 03/11/2024
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 03/11/2024
7232302-Residential License Tax Fee $1,022.72 $1,022.72 Paid 03/11/2024
9110078-Valuation Fee New Single Family $1,922.96 $1,922.96 Paid 03/11/2024
Outstanding Fees Amount Paid Owing Date Paid
9110078-Temporary Occupancy Fee $50.00 $0.00 $50.00 Not Paid
9110078-Temporary Occupancy Fee $50.00 $0.00 $50.00 Not Paid


$100.00    Add Fees to My Cart
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Occupancy Inspection - Codes Residential Pending
Misc
Corrective Action Required
03/03/2025
-Sewer not approved on record. Install tracer wire -Final grade, sod, downspout and sump pump extension -Provide sewer tracer wire port at grade -Install two 1/2” lag screws (or approved screws) at each end of deck ledger board
Footing Inspection - Residential Passed 04/10/2024
Informational
04/10/2024
FOOTING APPROVED BY ENGINEER
Erosion Control Inspection Residential Passed 4/10/2024 04/10/2024
Underslab Plumbing Inspection - Residential Passed 4/10/2024 4/10/2024 04/10/2024
Sewer Service Inspection - R Partial 4/15/2024 04/15/2024
Misc
Corrective Action Required
04/15/2024
Sewer connection to pit-OK
Sewer Service Inspection - R Partial 4/16/2024 04/16/2024
Misc
Corrective Action Required
04/15/2024
Sewer connection to pit and pressured sewer line to stub connection-OK Install sewer tracer line to house. Take picture after done
Gas Service Inspection - Residential Passed 8/29/2024 08/29/2024
Electrical Service Inspection Passed 8/29/2024 08/29/2024
Erosion Control Inspection Residential Partial 8/29/2024 08/29/2024
Misc
Informational
08/29/2024
Erosion control in compliance
All Rough Inspection - Residential Failed 8/29/2024 8/29/2024 08/29/2024
Misc
Corrective Action Required
08/29/2024
-Attach deck beam to each post with two 1/2” through bolts or install approved post cap -Lag deck ledger board per code -Tighten down anchor in garage near service panel; anchor short sill plate -Complete framing around feeder and fire block wall from attic -Have engineer address tie down of each rafter to wall plate with equivalence of 4-10d box nails -Pan off return air space behind refrigerator -Complete framing at fireplace and secure fireplace to framing; provide min 1” clearance from vent to combustible materials (wood and TV conduit); provide insulation shield in attic -Brace lvl roof beam end from rotation -Provide a wall receptacle for wing wall wider than 2 ft (wall adjacent to refrigerator) -Protect plumbing at wet bar -Connect basement bath fan duct to outdoor damper -Protect plumbing at basement bathroom -Bathroom fan flexible duct cannot exceed 14 ft per UL label. Install combination of hard duct and flexible duct to meet code -Seal penetrations of ceiling return air space above basement bathroom; move parallel electrical wiring outside return air space -Protect wirings running across bottom of joists -Support flushed lvl beam above stair -Solid block underneath beam point load (below kitchen wing wall) **OK TO INSULATE
Erosion Control Inspection Residential Partial 10/3/2024 10/03/2024
Misc
Informational
08/29/2024
Erosion control in compliance
All Rough Inspection - Residential Failed 10/3/2024 10/3/2024 10/03/2024
Misc
Corrective Action Required
08/29/2024
-Attach deck beam to each post with two 1/2” through bolts or install approved post cap, lag ledger board to rim at ends with two screws. Stagger screws per IRC figure R507.9.1.3 -Secure fireplace to framing; provide min 1” clearance from vent to combustible materials (wood and TV conduit) **Have the fireplace installation documentation on site. You must provide proper clearance from combustible materials as required by code and manufacturer -Brace lvl roof beam end from rotation -Seal penetrations of ceiling return air space above basement bathroom; move parallel electrical wiring outside return air space **OK TO INSULATE **Rafter framing at exterior wall OK per plan
All Rough Inspection - Residential Failed 10/14/2024 10/14/2024 10/14/2024
Misc
Corrective Action Required
10/03/2024
-Attach deck beam to each post with two 1/2” through bolts or install approved post cap, lag ledger board to rim at ends with two screws. Stagger screws per IRC figure R507.9.1.3 **check on final -Secure fireplace to framing; provide min 1” clearance from vent to combustible materials (wood and TV conduit) **Have the fireplace installation documentation on site. You must provide proper clearance from combustible materials as required by code and manufacturer -Seal penetrations of ceiling return air space above basement bathroom
Erosion Control Inspection Residential Partial 10/14/2024 10/14/2024
Misc
Informational
10/03/2024
Erosion control in compliance
All Rough Inspection - Residential Passed 10/16/2024 10/16/2024 10/16/2024
Misc
Resolved
10/16/2024
-Attach deck beam to each post with two 1/2” through bolts or install approved post cap, lag ledger board to rim at ends with two screws. Stagger screws per IRC figure R507.9.1.3 **check on final
Erosion Control Inspection Residential Partial 10/16/2024 10/16/2024 10/16/2024
Misc
Informational
10/14/2024
Erosion control in compliance
Driveway Inspection Partial 11/19/2024 11/19/2024 11/19/2024
Misc
Informational
11/19/2024
11-19-24 NS Site visited and it appears that driveway meets city standards for pre-pour inspection. will come back in a couple weeks.
Piers/Caissons Inspection - Residential Passed 12/6/2024 12/6/2024 12/06/2024
Occupancy Inspection - Codes Residential Failed 2/12/2025 2/12/2025 02/12/2025
Misc
Corrective Action Required
02/12/2025
-Driveway and sewer not approved on record -Final grade, sod, downspout and sump pump extension -Seal exterior wall penetrations -Provide sewer tracer wire port at grade -Install two 1/2” lag screws (or approved screws) at each end of deck ledger board -Garage door not self-closing -Provide a continuous and uninterrupted stair handrail to basement -Protect wiring running across bottom of joists in basement per code
Occupancy Inspection - Codes Residential Ready for Temp CO 2/14/2025 2/14/2025 02/14/2025
Misc
Corrective Action Required
02/12/2025
-Driveway and sewer not approved on record -Final grade, sod, downspout and sump pump extension -Provide sewer tracer wire port at grade -Install two 1/2” lag screws (or approved screws) at each end of deck ledger board
Driveway Inspection Passed 02/24/2025
Misc
Informational
11/19/2024
11-19-24 NS Site visited and it appears that driveway meets city standards for pre-pour inspection. will come back in a couple weeks. 2-24-25 NS Site visited and it appears that driveway meets city standards passed
Erosion Control Inspection Residential Passed 03/03/2025
Misc
Resolved
03/03/2025
Erosion control in compliance
Sewer Service Inspection - R Passed 03/03/2025
Misc
Resolved
03/03/2025
Sewer connection to pit and pressured sewer line to stub connection-OK Install sewer tracer line to house. Take picture after done
Occupancy Inspection - Codes Residential Ready for Temp CO 3/3/2025 3/3/2025 03/03/2025
Misc
Corrective Action Required
02/14/2025
-Sewer not approved on record. Install tracer wire -Final grade, sod, downspout and sump pump extension -Provide sewer tracer wire port at grade -Install two 1/2” lag screws (or approved screws) at each end of deck ledger board
Documents & Images
Date Uploaded File Type Document Name
03/05/2024 Application Form 2532 Woodland Permit Application Lee's Summit
03/05/2024 Approved Plans APPROVED PLANS
03/05/2024 Plot Plan approved plot plan
03/06/2024 Permit Codes Residential Plan Review
03/11/2024 Permit DS Building Permit
03/11/2024 Receipt Receipt for transaction:2024-001482
03/20/2024 Wilmoth 2532NE Woodland Oak Cir LSMO Footing Inspection Report 3-20-24
04/10/2024 Letter INSPECTION SUMMARY
04/10/2024 Letter INSPECTION SUMMARY
04/10/2024 Letter INSPECTION SUMMARY
04/15/2024 Letter INSPECTION SUMMARY
04/16/2024 Letter INSPECTION SUMMARY
05/17/2024 Final_2024_04_22_DPier_LSMO_KC Concrete
08/29/2024 Letter INSPECTION SUMMARY
08/29/2024 Letter INSPECTION SUMMARY
08/29/2024 Letter INSPECTION SUMMARY
08/29/2024 Letter INSPECTION SUMMARY
10/03/2024 Letter INSPECTION SUMMARY
10/03/2024 Letter INSPECTION SUMMARY
10/14/2024 Letter INSPECTION SUMMARY
10/14/2024 Letter INSPECTION SUMMARY
10/16/2024 Letter INSPECTION SUMMARY
10/16/2024 Letter INSPECTION SUMMARY
11/19/2024 Letter INSPECTION SUMMARY
12/06/2024 Letter INSPECTION SUMMARY
02/12/2025 Letter INSPECTION SUMMARY
02/13/2025 INSPECTION SUMMARY9
02/24/2025 Letter INSPECTION SUMMARY
02/24/2025 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home