Permit Application Status

PRRES20240929


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20240929
Building Permit - Residential
Stop Work
NZC HOMES LLC
NEW SINGLE FAMILY
NEW HOUSE. FINISHED/UNFINISHED BASEMENT. WALK OUT BASEMENT. COVERED DECK. STOP WORK ORDER generated on 04/25/2024 12:00 AM by username 'Dustin Agcopra'. STOP WORK ORDER removed on 04/25/2024 12:00 AM by username 'Dustin Agcopra'. STOP WORK ORDER generated on 05/14/2024 12:00 AM by username 'Mitchell Schwarz'. STOP WORK ORDER removed on 05/16/2024 12:00 AM by username 'Mitchell Schwarz'. STOP WORK ORDER generated on 05/16/2024 12:00 AM by username 'Mitchell Schwarz'. STOP WORK ORDER removed on 08/02/2024 12:00 AM by username 'Mitchell Schwarz'. STOP WORK ORDER generated on 10/08/2024 12:00 AM by username 'Mitchell Schwarz'. STOP WORK ORDER removed on 10/18/2024 12:00 AM by username 'Shawn Hoffman'. STOP WORK ORDER generated on 02/05/2025 12:00 AM by username 'Mitchell Schwarz'. STOP WORK ORDER removed on 03/26/2025 12:00 AM by username 'Devon Perry'. STOP WORK ORDER generated on 04/30/2025 12:00 AM by username 'Jamie Simerly'.
02/29/2024
04/04/2024
09/02/2024
Locations
Contacts
NICK ZVACEK CONSTRUCTION LLC, Address:1009 INDUSTRIAL DR, Phone:(816) 213-7204  
NZC HOMES LLC, Address:1009 INDUSTRIAL DR  
Dominick Zvacek, Address:1009 Industrial Drive, Phone:(816) 213-7204  
COMFORT SYSTEMS HTG/CLG, Address:128 W Markey Rd, Phone:(816) 322-1013  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
CENTURY PLUMBING, Address:14001 CENTURY LN, Phone:(816) 765-6066  
NZVACEK@GMAIL.COM  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331401-Water Tap Fee $3,760.00 $3,760.00 Paid 04/04/2024
8350015-Water Meter Fee $680.46 $680.46 Paid 04/04/2024
8331507-Sanitary Sewer Development Fee $2,159.00 $2,159.00 Paid 04/04/2024
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 04/04/2024
7232302-Residential Excise Tax Fee $1,022.72 $1,022.72 Paid 04/04/2024
9110078-Valuation Fee New Single Family $1,687.06 $1,687.06 Paid 04/04/2024
Outstanding Fees Amount Paid Owing Date Paid
9110080-Not Ready Inspection Fee $75.00 $0.00 $75.00 Not Paid
9110080-Not Ready Inspection Fee $75.00 $0.00 $75.00 Not Paid
9110080-Not Ready Inspection Fee $75.00 $0.00 $75.00 Not Paid
9110080-Not Ready Inspection Fee $75.00 $0.00 $75.00 Not Paid
9110080-3rd and Subsequent Inspection Fee (Per Hour) $75.00 $0.00 $75.00 Not Paid
9110080-Not Ready Inspection Fee $75.00 $0.00 $75.00 Not Paid
9110080-3rd and Subsequent Inspection Fee (Per Hour) $75.00 $0.00 $75.00 Not Paid
9110080-3rd and Subsequent Inspection Fee (Per Hour) $75.00 $0.00 $75.00 Not Paid


$600.00    Add Fees to My Cart
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Plot Plan Inspection Pending
Occupancy Inspection - Codes Residential Pending
Driveway Inspection Pending
Misc
Informational
04/04/2025
3-26-25 DP. Dw was formed, aggregate compacted, approved to pour 4-4-25 Dustin A, dw has been poured. The saw cuts are not allowed the way to a joint . Will need to be completed .
Sidewalk Inspection Pending
Misc
Corrective Action Required
04/17/2025
4-4-25 Dustin A, sw has not been poured to the left of approach. 2 panels have been poured to the right of approach and it is in compliant . Will need a pre pour inspection called in before left side can be poured. 4-10-25 Dustin A, SW is formed and compacted. Slopes are in compliance. Approved to pour 04-17-25 Jamie S, SW slopes are in compliance with city standards.
Erosion Control Inspection Residential Pending
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
05/06/2025
04-25-25 Jamie S, Silt fence is down and there are chucks of concrete in the cul-de-sac. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 04-25-25 Jamie S, Silt fence is still down. 05-02-25 Jamie S, Silt fence is still down. 05-06-25 Jamie S, Silt fence is still down.
Footing Inspection - Residential Passed 4/8/2024 04/08/2024
Erosion Control Inspection Residential Failed 4/8/2024 04/08/2024
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
04/08/2024
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Provide protection for swale in rear
Erosion Control Inspection Residential Passed 4/25/2024 04/25/2024
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
04/08/2024
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Provide protection for swale in rear
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
04/25/2024
4-25-24 Dustin A, EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Sewer Service Inspection - R Passed 5/10/2024 5/10/2024 05/10/2024
Water Service Inspection - R Passed 5/14/2024 05/14/2024
Erosion Control Inspection Residential Failed - Stop Work 5/14/2024 05/14/2024
DCM3 ESC REQUIRED 2 DAY
Resolved
05/14/2024
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Provide protection for swale in rear
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
04/25/2024
4-25-24 Dustin A, EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Water Service Inspection - R Passed 5/16/2024 5/16/2024 05/16/2024
Erosion Control Inspection Residential Failed - Stop Work 5/16/2024 5/16/2024 05/16/2024
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
05/14/2024
4-25-24 Dustin A, EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. Still not in compliance 05/16/24
Erosion Control Inspection Residential Not Ready 7/29/2024 07/29/2024
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
05/16/2024
4-25-24 Dustin A, EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. Still not in compliance 05/16/24 Still not in compliance 07/29/24
Erosion Control Inspection Residential Not Ready 7/31/2024 07/31/2024
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
07/29/2024
4-25-24 Dustin A, EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. Still not in compliance 05/16/24 Still not in compliance 07/29/24 Gravel drive still not in compliance
Erosion Control Inspection Residential Partial 8/2/2024 08/02/2024
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
08/02/2024
4-25-24 Dustin A, EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. Still not in compliance 05/16/24 Still not in compliance 07/29/24 Gravel drive still not in compliance
Misc
Informational
08/02/2024
Erosion control in compliance at time of inspection 08/2/24
Underslab Plumbing Inspection - Residential Passed 8/5/2024 08/05/2024
Piers/Caissons Inspection - Residential Failed 8/6/2024 8/6/2024 08/06/2024
Misc
Corrective Action Required
08/06/2024
Piers not to depth
Piers/Caissons Inspection - Residential Passed 8/7/2024 8/7/2024 08/07/2024
Misc
Resolved
08/07/2024
Piers not to depth
Erosion Control Inspection Residential Failed 10/4/2024 10/4/2024 10/04/2024
Misc
Resolved
10/04/2024
Erosion control in compliance at time of inspection 08/2/24
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
10/04/2024
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
10/04/2024
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. -repair silt fence -clean street -maintain overgrown vegetation
Erosion Control Inspection Residential Failed - Stop Work 10/8/2024 10/8/2024 10/08/2024
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
10/04/2024
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
10/04/2024
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. -repair silt fence -clean street -maintain overgrown vegetation Still not in compliance STOP WORK ISSUED -Mitchell Schwarz 10/08/24
Erosion Control Inspection Residential Failed 10/18/2024 10/18/2024 10/18/2024
DCM2 ESC DEFICIENT INSTALLATION
Resolved
10/18/2024
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED.
DCM3 ESC REQUIRED 2 DAY
Resolved
10/18/2024
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. -repair silt fence -clean street -maintain overgrown vegetation Still not in compliance STOP WORK ISSUED -Mitchell Schwarz 10/08/24
Misc
Corrective Action Required
10/18/2024
- REMOVE TRASH AND DEBRIS FROM LOT.
Erosion Control Inspection Residential Failed 10/24/2024 10/24/2024 10/24/2024
Misc
Corrective Action Required
10/18/2024
- REMOVE TRASH AND DEBRIS FROM LOT. -maintain Erosion control around lot
Erosion Control Inspection Residential Not Ready 11/1/2024 11/1/2024 11/01/2024
Misc
Corrective Action Required
10/24/2024
-maintain Erosion control around lot Clean mud from storm inlet at rear of home and re-establish erosion control around inlet and swale
Erosion Control Inspection Residential Failed 11/5/2024 11/05/2024
Misc
Resolved
11/05/2024
-maintain Erosion control around lot Clean mud from storm inlet at rear of home and re-establish erosion control around inlet and swale
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
11/05/2024
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. Clean mud from storm inlet at rear of home and re-establish erosion control around inlet and swale
All Rough Inspection - Residential Not Ready 11/5/2024 11/5/2024 11/05/2024
Miscellaneous Correction
Corrective Action Required
11/05/2024
- City stamped plans are not on site - City stamped plans must be on site until CofO - Address failed erosion control before rescheduling all rough Not ready for inspection
All Rough Inspection - Residential Failed 11/12/2024 11/12/2024 11/12/2024
Miscellaneous Correction
Resolved
11/12/2024
- City stamped plans are not on site - City stamped plans must be on site until CofO - Address failed erosion control before rescheduling all rough Not ready for inspection
Miscellaneous Correction
Corrective Action Required
11/12/2024
- Address failed erosion control before rescheduling all rough - Clean out mud and protect swale and storm inlet in back yard (This has been part of the failed erosion control inspection) Not ready (3rd consecutive inspection) 11/12/24. KBEARD
Erosion Control Inspection Residential Failed 11/12/2024 11/12/2024
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
11/05/2024
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. Clean mud from storm inlet at rear of home and re-establish erosion control around inlet and swale 11/12/24. KBEARD
Electrical Service Inspection Passed 11/26/2024 11/26/2024
Gas Service Inspection - Residential Failed 11/26/2024 11/26/2024
Misc
Corrective Action Required
11/26/2024
No pressure
All Rough Inspection - Residential Failed 11/26/2024 11/26/2024 11/26/2024
Miscellaneous Correction
Corrective Action Required
11/12/2024
-Nail siding along edges @ 6” oc -Provide flashing above rear wall window trim -Provide 2”x2”x3/16” washers at garage PFH walls -Provide 4” flexible ducts for bath fans. Flexible duct cannot exceed 14 ft per UL label. Install separate duct for each fan -Vent master bathroom fans to outdoor -Move roof strut above laundry/bathroom to bearing wall -Fb great room/bedroom wall from attic -Anchor basement sill plate within 12” of break -Toe-nail basement ceiling joists to sill and top plates w/ 4-8d of 3-10d -Install joist hangers at stair wall -Fb basement hallway wall from ceiling space; provide 3/4” sheathing for fire blocking, not 1/2”; fb basement bedroom 2&3 and bathroom walls from ceiling and soffit spaces -Provide return air path to basement bedroom 2 and pan off return air space from fur down ceiling space -Provide 4” flexible duct for bathroom fan -Provide double joists above wet bar area -(2)2x10 near stair -Provide full support for (3)2x10 joists near electrical service panel **DO NOT INSULATE
Gas Service Inspection - Residential Not Ready 12/9/2024 12/09/2024
Misc
Corrective Action Required
11/26/2024
Still No pressure
All Rough Inspection - Residential Failed 12/9/2024 12/09/2024
Miscellaneous Correction
Corrective Action Required
11/26/2024
-Provide flashing above rear wall window trim -Toe-nail basement ceiling joists to sill and top plates w/ 4-8d or 3-10d -Fb basement hallway wall from ceiling space; provide 3/4” sheathing for fire blocking, not 1/2”; fb basement bedroom 2&3 and bathroom walls from ceiling and soffit spaces -Provide return air path to basement bedroom 2 and pan off return air space from fur down ceiling space and seal any and all penetration in this joist space -Provide 4” flexible duct for bathroom fan in basement -seal all low voltage penetrations in top and bottom plate throughout **DO NOT INSULATE
All Rough Inspection - Residential Failed 12/16/2024 12/16/2024
Miscellaneous Correction
Corrective Action Required
12/09/2024
-Fb basement hallway wall from ceiling space; fb basement bedroom 2&3 and bathroom walls from ceiling and soffit spaces; provide vertical fire blocking at max 10 ft for bedroom 3 -Provide return air path to basement bedroom 2 (remove blocking) and seal plumbing penetration in this joist space -Reinstall electrical in basement **OK TO INSULATE
Gas Service Inspection - Residential Failed 12/16/2024 12/16/2024
Misc
Corrective Action Required
12/09/2024
Still No pressure
All Rough Inspection - Residential Passed 12/18/2024 12/18/2024 12/18/2024
Miscellaneous Correction
Resolved
12/18/2024
-Fb basement hallway wall from ceiling space; fb basement bedroom 2&3 and bathroom walls from ceiling and soffit spaces; provide vertical fire blocking at max 10 ft for bedroom 3 -Provide return air path to basement bedroom 2 (remove blocking) and seal plumbing penetration in this joist space -Reinstall electrical in basement **OK TO INSULATE
Gas Service Inspection - Residential Passed 12/18/2024 12/18/2024 12/18/2024
Misc
Resolved
12/18/2024
Still No pressure
Erosion Control Inspection Residential Failed 01/29/2025
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
01/29/2025
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. Clean mud from storm inlet at rear of home and re-establish erosion control around inlet and swale 11/12/24. KBEARD
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
01/29/2025
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. PROVIDE GRAVEL ENTRANCE REPAIR DOWNED SILT FENCE CLEAN MUD AND ROCK FROM STREET AND STORM INLET
Erosion Control Inspection Residential Failed - Stop Work 2/5/2025 2/5/2025 02/05/2025
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
01/29/2025
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. PROVIDE GRAVEL ENTRANCE REPAIR DOWNED SILT FENCE CLEAN MUD AND ROCK FROM STREET AND STORM INLET
Erosion Control Inspection Residential Failed 3/25/2025 3/25/2025 03/25/2025
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
02/05/2025
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. REPAIR DOWNED SILT FENCE CLEAN MUD FROM STOM INLETS AT REAR OF LOT AND RE-ESTABLISH EROSION CONTROL AT REAR OF LOT
Erosion Control Inspection Residential Passed 3/26/2025 3/26/2025 03/26/2025
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
03/25/2025
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. REPAIR DOWNED SILT FENCE CLEAN MUD FROM STOM INLETS AT REAR OF LOT AND RE-ESTABLISH EROSION CONTROL AT REAR OF LOT Contractor Stood silt fence back up and is now in compliance.
Driveway Inspection Partial 3/26/2025 3/26/2025 03/26/2025
Misc
Informational
03/26/2025
3-26-25 DP. Dw was formed, aggregate compacted, approved to pour
Sidewalk Inspection Partial 3/26/2025 3/26/2025 03/26/2025
Misc
Informational
03/26/2025
3-26-25 DP. SW is formed on right side (if facing house) aggregate compacted, approved to pour.
Driveway Inspection Failed 4/4/2025 4/4/2025 04/04/2025
Misc
Informational
03/26/2025
3-26-25 DP. Dw was formed, aggregate compacted, approved to pour 4-4-25 Dustin A, dw has been poured. The saw cuts are not allowed the way to a joint . Will need to be completed .
Sidewalk Inspection Partial 04/04/2025
Misc
Corrective Action Required
04/04/2025
4-4-25 Dustin A, sw has not been poured to the left of approach. 2 panels have been poured to the right of approach and it is in compliant . Will need a pre pour inspection called in before left side can be poured.
Sidewalk Inspection Partial 4/10/2025 4/10/2025 04/10/2025
Misc
Corrective Action Required
04/04/2025
4-4-25 Dustin A, sw has not been poured to the left of approach. 2 panels have been poured to the right of approach and it is in compliant . Will need a pre pour inspection called in before left side can be poured. 4-10-25 Dustin A, SW is formed and compacted. Slopes are in compliance. Approved to pour
Sidewalk Inspection Partial 4/17/2025 4/17/2025 04/17/2025
Misc
Corrective Action Required
04/10/2025
4-4-25 Dustin A, sw has not been poured to the left of approach. 2 panels have been poured to the right of approach and it is in compliant . Will need a pre pour inspection called in before left side can be poured. 4-10-25 Dustin A, SW is formed and compacted. Slopes are in compliance. Approved to pour 04-17-25 Jamie S, SW slopes are in compliance with city standards.
Erosion Control Inspection Residential Failed 4/25/2025 4/25/2025 04/25/2025
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
04/25/2025
04-25-25 Jamie S, Silt fence is down and there are chucks of concrete in the cul-de-sac. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Erosion Control Inspection Residential Failed - Stop Work 4/30/2025 4/30/2025 04/30/2025
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
04/25/2025
04-25-25 Jamie S, Silt fence is down and there are chucks of concrete in the cul-de-sac. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 04-25-25 Jamie A, Silt fence is still down.
Erosion Control Inspection Residential Failed - Stop Work 5/2/2025 5/2/2025 05/02/2025
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
04/30/2025
04-25-25 Jamie S, Silt fence is down and there are chucks of concrete in the cul-de-sac. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 04-25-25 Jamie A, Silt fence is still down. 05-02-25 Jamie A, Silt fence is still down.
Erosion Control Inspection Residential Failed - Stop Work 5/6/2025 5/6/2025 05/06/2025
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
05/02/2025
04-25-25 Jamie S, Silt fence is down and there are chucks of concrete in the cul-de-sac. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 04-25-25 Jamie S, Silt fence is still down. 05-02-25 Jamie S, Silt fence is still down. 05-06-25 Jamie S, Silt fence is still down.
Documents & Images
Date Uploaded File Type Document Name
02/29/2024 Lot 80 Plans
02/29/2024 Lot 80_2024-02-29
03/04/2024 Application Form APPLICATION AND EXCISE TAX FORM
03/06/2024 Permit Codes Residential Plan Review
03/15/2024 Plot Plan APPROVED PLOT PLAN
03/27/2024 4071LA
03/28/2024 Approved Plans APPROVED PLANS
03/28/2024 Permit Codes Residential Plan Review
04/04/2024 Permit DS Building Permit
04/04/2024 Receipt Receipt for transaction: 2024-002131
04/05/2024 M L Crose 2319 SW Serena Pl LSMO Summit View Farms Lot 80 3rd Party Footing Inspection Report 4-4-24
04/08/2024 Letter INSPECTION SUMMARY
04/08/2024 Letter INSPECTION SUMMARY
04/25/2024 Letter Stop Work Order
04/25/2024 Letter Stop Work Order
04/25/2024 Letter INSPECTION SUMMARY
05/10/2024 Letter INSPECTION SUMMARY
05/14/2024 Letter INSPECTION SUMMARY
05/14/2024 Letter Stop Work Order
05/16/2024 Letter INSPECTION SUMMARY
05/16/2024 Letter Stop Work Order
07/09/2024 Letter Codes 10 Day Letter
07/29/2024 Letter INSPECTION SUMMARY
07/31/2024 Letter INSPECTION SUMMARY
08/02/2024 Letter INSPECTION SUMMARY
08/05/2024 Letter INSPECTION SUMMARY
08/06/2024 Letter INSPECTION SUMMARY
08/07/2024 Letter INSPECTION SUMMARY
10/04/2024 Letter INSPECTION SUMMARY
10/08/2024 Letter Stop Work Order
10/18/2024 Letter INSPECTION SUMMARY
10/24/2024 Letter INSPECTION SUMMARY
11/01/2024 Letter INSPECTION SUMMARY
11/05/2024 Letter INSPECTION SUMMARY
11/05/2024 Letter INSPECTION SUMMARY
11/12/2024 Letter INSPECTION SUMMARY
11/12/2024 Letter INSPECTION SUMMARY
11/26/2024 Letter INSPECTION SUMMARY
11/26/2024 Letter INSPECTION SUMMARY
11/26/2024 Letter INSPECTION SUMMARY
12/09/2024 Letter INSPECTION SUMMARY
12/09/2024 Letter INSPECTION SUMMARY
12/16/2024 Letter INSPECTION SUMMARY
12/16/2024 Letter INSPECTION SUMMARY
12/18/2024 Letter INSPECTION SUMMARY
12/18/2024 Letter INSPECTION SUMMARY
01/29/2025 Letter INSPECTION SUMMARY
02/05/2025 Letter Stop Work Order
03/25/2025 Letter INSPECTION SUMMARY
03/26/2025 Letter INSPECTION SUMMARY
03/26/2025 Letter INSPECTION SUMMARY
03/26/2025 Letter INSPECTION SUMMARY
04/04/2025 Letter INSPECTION SUMMARY
04/04/2025 Letter INSPECTION SUMMARY
04/04/2025 Letter INSPECTION SUMMARY
04/04/2025 Letter INSPECTION SUMMARY
04/10/2025 Letter INSPECTION SUMMARY
04/17/2025 Letter INSPECTION SUMMARY
04/25/2025 Letter INSPECTION SUMMARY
04/30/2025 Letter Stop Work Order
05/02/2025 Letter Stop Work Order
05/06/2025 Letter Stop Work Order
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home