Permit Application Status

PRRES20233628


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20233628
Building Permit - Residential
Certificate of Occupancy
SUMMIT VIEW FARMS DEVELOPMENT GROUP LLC
NEW SINGLE FAMILY
NEW HOUSE - FINISHED AND UNFINISHED BASEMENT - COVERED DECK
07/26/2023
08/15/2023
01/29/2024
10/21/2024
Locations
Contacts
WOOD BROTHERS CONSTRUCTION INC, Address:PO BOX 553, Phone:(816) 564-5024  
SUMMIT VIEW FARMS DEVELOPMENT GROUP LLC, Address:13450 E STATE ROUTE 150  
Wood Brothers Construction INC, Address:PO Box 553  
WOODBROTHERSINC@GMAIL.COM  
EDCO AIRE II LLC, Address:13934 VARNER RD, Phone:(816) 847-0100  
  
PREFERRED PLUMBING INC, Address:1664 NW 415TH RD, Phone:(816) 828-1680  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331507-Sanitary Sewer Development Fee $2,159.00 $2,159.00 Paid 08/15/2023
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 08/15/2023
7232302-Residential Excise Tax Fee $1,022.72 $1,022.72 Paid 08/15/2023
8331401-Water Tap Fee $3,760.00 $3,760.00 Paid 08/15/2023
8350015-Water Meter Fee $680.46 $680.46 Paid 08/15/2023
9110078-Valuation Fee New Single Family $2,431.23 $2,431.23 Paid 08/15/2023
9110078-Additional Permit Fee $233.98 $233.98 Paid 05/23/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 8/30/2023 08/30/2023
Underslab Plumbing Inspection - Residential Passed 9/20/2023 9/20/2023 09/20/2023
Sewer Service Inspection - R Passed 10/5/2023 (1:15) 10/5/2023 10/05/2023
Water Service Inspection - R Passed 10/9/2023 (1:00) 10/9/2023 10/09/2023
All Rough Inspection - Residential Partial 11/22/2023 11/22/2023 11/22/2023
Misc
Informational
11/22/2023
Garage portal frame inspection only. no city stamped plans on site for inspection of porch and patio.
All Rough Inspection - Residential Partial 11/28/2023 11/28/2023 11/28/2023
Misc
Informational
11/22/2023
Garage portal frame inspection and cover deck roof
Piers/Caissons Inspection - Residential Failed 12/7/2023 12/7/2023 12/07/2023
Misc
Corrective Action Required
12/07/2023
Plans call for center pier to be 24” in diameter Outside 2 okay at 18”x36”
Piers/Caissons Inspection - Residential Passed 12/8/2023 12/8/2023 12/08/2023
Misc
Resolved
12/08/2023
Erosion Control Inspection Residential Failed 3/11/2024 03/11/2024
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
03/11/2024
3-11-24 EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Needs to be extended past storm drain as well as street cleaned
Erosion Control Inspection Residential Failed 3/18/2024 3/18/2024 03/18/2024
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
03/11/2024
3-11-24 EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Needs to be extended past storm drain as well as street cleaned 3-18-24 Dustin A, Storm inlet needs to be cleaned out
Electrical Service Inspection Failed 3/22/2024 3/22/2024 03/22/2024
Misc
Corrective Action Required
03/22/2024
ufer ground needs to be directly connected to service disconnect (uninterrupted)
Gas Service Inspection - Residential Passed 3/22/2024 3/22/2024 03/22/2024
All Rough Inspection - Residential Failed 3/22/2024 3/22/2024 03/22/2024
Misc
Resolved
03/22/2024
Garage portal frame inspection and cover deck roof
Misc
Corrective Action Required
03/22/2024
-secure conduit within 12” of service panel -address holes drilled to close to one another above garage, garage entry, laundry -anchor bolt nuts missing at garage -missing stud in stud packs at dining room plans call for 5 -missing king studs at great room window ends -missing hanger on double 2x10 above master bed -missing king studs at front entry wall. Plans call for 2 -missing hanger above bed 4 for triple 2x12 -missing nails in hanger above bed 4 -address return Air open to attic space -electrical not landed above attic access -missing nails in hanger -missing hangers on triple above stairs 2nd floor -anchor all steel columns in basement -missing double joist on C joist schedule throughout basement (4) missing -joist above S wall basement over notched, drilled -sister exterior wall studs over notched for anchor bolts - ufer ground needs to be directly connected to service disconnect (uninterrupted)
Driveway Inspection Partial 4/4/2024 4/4/2024 04/04/2024
Misc
Informational
04/04/2024
4-4-24 Dustin A, DW is formed to city specs , Approved to pour
Driveway Inspection Passed 4/11/2024 4/11/2024 04/11/2024
Misc
Informational
04/04/2024
4-4-24 Dustin A, DW is formed to city specs , Approved to pour 4-11-24 Dustin A, DW poured to city specs, Passed
All Rough Inspection - Residential Failed 4/23/2024 4/23/2024 04/23/2024
Misc
Corrective Action Required
03/22/2024
-address holes drilled to close to one another above garage, garage entry(missing joists and garage entry not done) -missing king studs at great room window ends(engineer letter talks of entry wall in this area. Please have engineer correct) -missing king studs at front entry wall. Plans call for 2(not fixed to engineer letter) -missing hangers on triple above stairs 2nd floor -anchor all steel columns in basement -missing double joist on C joist schedule see S end -joist above S wall basement over notched, drilled(not done) -sister exterior wall studs over notched for anchor bolts - ufer ground connection to gas line shall be connected as connector is designed -service disconnect to ufer to be of proper size. #4 copper minimum
Electrical Service Inspection Failed 4/23/2024 4/23/2024 04/23/2024
Misc
Corrective Action Required
03/22/2024
Service disconnect to ufer ground connection to be properly sized. See 250.66 NEC
Electrical Service Inspection Passed 5/7/2024 5/7/2024 05/07/2024
Misc
Resolved
05/07/2024
Service disconnect to ufer ground connection to be properly sized. See 250.66 NEC
All Rough Inspection - Residential Passed 5/7/2024 5/7/2024 05/07/2024
Misc
Resolved
05/07/2024
Erosion Control Inspection Residential Failed 3/21/2024 7/11/2024 07/11/2024
DCM3 ESC REQUIRED 2 DAY
Resolved
07/11/2024
3-11-24 EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Needs to be extended past storm drain as well as street cleaned 3-18-24 Dustin A, Storm inlet needs to be cleaned out
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
07/11/2024
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. MAINTAIN SILT FENCE -MAINTAIN OVERGROWN VEGETATION
Sidewalk Inspection Partial 7/22/2024 7/22/2024 07/22/2024
Misc
Informational
07/22/2024
7-22-24 Dustin A, SW at rear of lot. It is formed and compacted to city specs and slopes are in compliance. Approved to pour
Sidewalk Inspection Partial 7/29/2024 7/29/2024 07/29/2024
Misc
Informational
07/22/2024
7-22-24 Dustin A, SW at rear of lot. It is formed and compacted to city specs and slopes are in compliance. Approved to pour 7-29-24 Dustin A, SW is poured and slopes are in compliance . Cannot pass until forms are pulled
All Rough Inspection - Residential Failed 7/31/2024 07/31/2024
Misc
Corrective Action Required
07/31/2024
Fireblock furr down ends
Erosion Control Inspection Residential Partial 8/1/2024 8/1/2024 08/01/2024
DCM3 ESC REQUIRED 2 DAY
Resolved
08/01/2024
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. MAINTAIN SILT FENCE -MAINTAIN OVERGROWN VEGETATION
Misc
Corrective Action Required
08/01/2024
In compliance at time of inspection
All Rough Inspection - Residential Passed 8/1/2024 08/01/2024
Misc
Resolved
08/01/2024
Fireblock furr down ends
Occupancy Inspection - Codes Residential Failed 10/18/2024 10/18/2024 10/18/2024
Misc
Corrective Action Required
10/18/2024
- Sidewalk inspection pending - Provide handrail at owner entry with 4 rises - GFCI protection required at laundry outlets - Provide railings at deck and stairs - Address gap at post to beam connections on deck ( no bearing) - Close attic access - Open electrical box at door bell - Label non GFCI outlet at sump - Uncover smoke detectors in basement ( not tested) - Cap vanity drain in basement bathroom - Land NM at bar into boxes - Sump discharge to be 36” away from foundation - Provide splash pads at North side of house
Erosion Control Inspection Residential Passed 10/18/2024 10/18/2024
Misc
Resolved
10/18/2024
In compliance at time of inspection
Plot Plan Inspection Passed 10/18/2024 10/18/2024
Sidewalk Inspection Passed 10/18/2024 10/18/2024 10/18/2024
Misc
Informational
07/29/2024
7-22-24 Dustin A, SW at rear of lot. It is formed and compacted to city specs and slopes are in compliance. Approved to pour 7-29-24 Dustin A, SW is poured and slopes are in compliance . Cannot pass until forms are pulled 10-18-24 NS Sidewalk Passed since forms are pulled.
Occupancy Inspection - Codes Residential Full C of O 10/21/2024 10/21/2024 10/21/2024
Misc
Resolved
10/21/2024
- Sidewalk inspection pending - Provide handrail at owner entry with 4 rises - GFCI protection required at laundry outlets - Provide railings at deck and stairs - Address gap at post to beam connections on deck ( no bearing) - Close attic access - Open electrical box at door bell - Label non GFCI outlet at sump - Uncover smoke detectors in basement ( not tested) - Cap vanity drain in basement bathroom - Land NM at bar into boxes - Sump discharge to be 36” away from foundation - Provide splash pads at North side of house
Documents & Images
Date Uploaded File Type Document Name
07/26/2023 SVF102 Spec - Sealed Plans (June 12, 2023)
07/26/2023 LOT 102 FINAL Plot Plan
07/26/2023 LOT 102 FINAL Plot Plan
07/26/2023 excise tax app
07/31/2023 Signed Residental Permit Application_1 (4)
08/02/2023 Permit Codes Residential Plan Review
08/02/2023 Approved Plans approved plans
08/03/2023 LOT 102 CITY
08/03/2023 Plot Plan approved plot plan
08/03/2023 Permit Codes Residential Plan Review
08/15/2023 Permit DS Building Permit
08/15/2023 Receipt Receipt for transaction:2023-006323
08/25/2023 M L Crose 3211 SW Enoch St LSMO Summit View Farms Lot 102 Foundation footing Inspection Report 8-25-23
08/30/2023 Letter INSPECTION SUMMARY
09/20/2023 Letter INSPECTION SUMMARY
10/05/2023 Letter INSPECTION SUMMARY
10/09/2023 Letter INSPECTION SUMMARY
11/28/2023 Letter INSPECTION SUMMARY
12/07/2023 Letter INSPECTION SUMMARY
12/07/2023 Letter INSPECTION SUMMARY
12/08/2023 Letter INSPECTION SUMMARY
03/11/2024 Letter INSPECTION SUMMARY
03/11/2024 Letter INSPECTION SUMMARY
03/18/2024 Letter INSPECTION SUMMARY
03/22/2024 Letter INSPECTION SUMMARY
03/22/2024 Letter INSPECTION SUMMARY
03/22/2024 Letter INSPECTION SUMMARY
04/04/2024 Letter INSPECTION SUMMARY
04/11/2024 Letter INSPECTION SUMMARY
04/17/2024 3RD Party Insp Report THIRD PARTY INSPECTION
04/23/2024 Letter INSPECTION SUMMARY
04/23/2024 Letter INSPECTION SUMMARY
04/24/2024 Engineer Report/Study Revised structural engineer report
05/06/2024 Engineer Report/Study STRUCTURAL ENGINEER REPORT
05/07/2024 Letter INSPECTION SUMMARY
05/07/2024 Letter INSPECTION SUMMARY
05/14/2024 Signed Scope_of_Work_Statement (1)
05/14/2024 Smaller Durango basement finish
05/14/2024 Smaller Durango lot 102 basement finish
05/16/2024 Approved Plans APPROVED BASEMENT FINISH
05/23/2024 Receipt Receipt for transaction:2024-003898
05/29/2024 3RD Party Insp Report 3rd party inspection
05/31/2024 2024_05_28_3211 SW Enoch St_Repair Verification_Sealed (2)
07/11/2024 Letter INSPECTION SUMMARY
07/22/2024 Letter INSPECTION SUMMARY
07/29/2024 Letter INSPECTION SUMMARY
07/31/2024 Letter INSPECTION SUMMARY
08/01/2024 Letter INSPECTION SUMMARY
08/01/2024 Letter INSPECTION SUMMARY
10/18/2024 Letter INSPECTION SUMMARY
10/18/2024 Letter INSPECTION SUMMARY
10/18/2024 Letter INSPECTION SUMMARY
10/21/2024 Letter INSPECTION SUMMARY
10/21/2024 Letter Field Certificate of Occupancy
10/21/2024 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home