Summary
PRRES20231016
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - FINISHED AND UNFINISHED BASEMENT - COVERED DECK
03/13/2023
04/10/2023
09/11/2023
06/12/2024
Locations
Contacts
KC CUSTOM HOMES, Address:406 NW DONOVAN RD, Phone:(816) 564-5149  
Steve Froehlich, Address:406 NW Donovan Rd  
STEVE@KC-CUSTOMHOMES.COM  
PRAIRIE CENTER PLUMBING HEATING & A/C, Address:242 N MARION, Phone:(913) 829-6263  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
PRAIRIE CENTER PLUMBING HEATING & A/C, Address:242 N MARION, Phone:(913) 829-6263  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
Sanitary Sewer Development Fee $1,384.00 $1,384.00 Paid 04/10/2023
Right of Way Permit Fee $85.00 $85.00 Paid 04/10/2023
Residential Excise Tax Fee $1,022.72 $1,022.72 Paid 04/10/2023
Water Tap Fee $3,730.00 $3,730.00 Paid 04/10/2023
Water Meter Fee $550.50 $550.50 Paid 04/10/2023
Valuation Fee New Single Family $1,582.76 $1,582.76 Paid 04/10/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 4/13/2023 (9:00) 4/13/2023 04/13/2023
Misc
Informational
04/13/2023
UFER on East wall 4 ft. back from front.
Underslab Plumbing Inspection - Residential Passed 5/5/2023 5/5/2023 05/05/2023
Piers/Caissons Inspection - Residential Passed 5/10/2023 05/10/2023
Gas Service Inspection - Residential Passed 7/6/2023 7/6/2023 07/06/2023
Electrical Service Inspection Passed 8/2/2023 8/2/2023 08/02/2023
All Rough Inspection - Residential Failed 8/2/2023 8/2/2023 08/02/2023
Misc
Corrective Action Required
08/02/2023
-Complete nailing exterior nailing pattern at studs and header at single car PFH -Clarify braced wall design at east side of single car bay-No portal frame design present, panel is roughly 16” -Have engineer address rafters landing on blocks and not connected to ceiling joists -Midpoint dwv straps must prevent the pipes from moving perpendicular to their axis -Tighten anchor bolts st garage -Anchor bolts to be in middle third of plate at garage -Structural strap top plate at both sides over bored for dryer duct -Dryer duct must be protected 2” below top plates -Use approved fasteners at stud shoes -Nail exterior corners and intersecting walls at 12” oc -Nail overlapping joists per code -Seal fireblocking at fur out wall in master bath -Repair sub floor hole at master bath -Provide Simpson LTTP2 straps At deck per plan -Install post under deck ridge beam -Nail sheathing per code -Rafters over notched at ridge beam in great room -Fireblock and install top plate at ceiling line at wet bar -Strap top plate and anchor bottom plate at exterior basement corners -Provide anchor bolt right side of SGD -Strap top plates at SGD -Tighten anchor bolts at basement -Only 2 nm cables allowed through top plates at basement hall -Provide (2) nchor bolts at front basement bed plate break in middle 3rd of plate -Support end joists at deck -Provide (2) 1/2” through bolts at post to beam connection
Erosion Control Inspection Residential Partial 08/02/2023
Misc
Corrective Action Required
08/02/2023
8/2/23 Erosion control in compliance at time of inspection
All Rough Inspection - Residential Failed 9/6/2023 9/6/2023 09/06/2023
Misc
Corrective Action Required
08/02/2023
-Complete nailing exterior nailing pattern at studs and header at single car PFH -Clarify braced wall design at east side of single car bay-No portal frame design present, panel is roughly 16” -Have engineer address rafters landing on blocks and not connected to ceiling joists ( straps to be 32" OC ) -Midpoint dwv straps must prevent the pipes from moving perpendicular to their axis -Nail overlapping joists per code -Seal fireblocking at fur out wall in master bath -Provide Simpson LTTP2 straps At deck per plan -Provide (2) nchor bolts at front basement bed plate break in middle 3rd of plate -Support end joists at deck -Provide (2) 1/2” through bolts at post to beam connection
All Rough Inspection - Residential Failed 9/8/2023 9/8/2023 09/08/2023
Misc
Corrective Action Required
09/06/2023
-Nail overlapping joists per code -Seal fireblocking at fur out wall in master bath -Provide (2) nchor bolts at front basement bed plate break in middle 3rd of plate OK to insulate
All Rough Inspection - Residential Passed 9/11/2023 9/11/2023 09/11/2023
Misc
Resolved
09/11/2023
-Nail overlapping joists per code -Seal fireblocking at fur out wall in master bath -Provide (2) nchor bolts at front basement bed plate break in middle 3rd of plate OK to insulate
Driveway Inspection Partial 9/18/2023 9/18/2023 09/18/2023
Misc
Informational
09/18/2023
9-18-23 A.A DW is formed, aggregate is compacted. Will need to maintain 2% slope through driveway but conditions can change, approved to pour
Driveway Inspection Partial 9/25/2023 9/25/2023 09/25/2023
Misc
Informational
09/18/2023
9-18-23 A.A DW is formed, aggregate is compacted. Will need to maintain 2% slope through driveway but conditions can change, approved to pour 9-25-23 DW is poured. Cannot pass until forms are pulled
Driveway Inspection Partial 10/9/2023 10/9/2023 10/09/2023
Misc
Informational
09/25/2023
9-18-23 A.A DW is formed, aggregate is compacted. Will need to maintain 2% slope through driveway but conditions can change, approved to pour 9-25-23 Dustin A, DW is poured. Cannot pass until forms are pulled 10-9-23 Dustin A conditions have not changed
Driveway Inspection Partial 10/16/2023 10/16/2023 10/16/2023
Misc
Informational
10/09/2023
9-18-23 A.A DW is formed, aggregate is compacted. Will need to maintain 2% slope through driveway but conditions can change, approved to pour 9-25-23 Dustin A, DW is poured. Cannot pass until forms are pulled 10-9-23 Dustin A conditions have not changed 10-16-23 Dustin A, Conditions have not changed
Driveway Inspection Partial 10/23/2023 10/23/2023 10/23/2023
Misc
Informational
10/16/2023
9-18-23 A.A DW is formed, aggregate is compacted. Will need to maintain 2% slope through driveway but conditions can change, approved to pour 9-25-23 Dustin A, DW is poured. Cannot pass until forms are pulled 10-9-23 Dustin A conditions have not changed 10-16-23 Dustin A, Conditions have not changed 10-23-23 Dustin A, Conditions have not changed
Erosion Control Inspection Residential Failed 11/08/2023
Misc
Resolved
11/08/2023
8/2/23 Erosion control in compliance at time of inspection
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
11/08/2023
**11/8/23 EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. -PROVIDE EROSION CONTROL AT PERIMETER OF LOT **IF NOT IN COMPLIANCE IN 2 BUSINESS DAYS, A STOP WORK ORDER WILL BE ISSUED
Erosion Control Inspection Residential Partial 11/13/2023 11/13/2023 11/13/2023
DCM3 ESC REQUIRED 2 DAY
Resolved
11/13/2023
**11/8/23 EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. -PROVIDE EROSION CONTROL AT PERIMETER OF LOT **IF NOT IN COMPLIANCE IN 2 BUSINESS DAYS, A STOP WORK ORDER WILL BE ISSUED
Misc
Corrective Action Required
11/13/2023
Erosion control in compliance at time of inspection
Erosion Control Inspection Residential Failed 02/06/2024
Misc
Resolved
02/06/2024
Erosion control in compliance at time of inspection
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
02/06/2024
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. -RESTORE SILT FENCE AT FRONT OF LOT
Sewer Service Inspection - R Passed 3/12/2024 (8:15) 3/12/2024 03/12/2024
Water Service Inspection - R Partial 3/14/2024 3/14/2024 03/14/2024
Misc
Informational
03/14/2024
Partial from house to meter pit
Water Service Inspection - R Passed 3/15/2024 3/15/2024 03/15/2024
Misc
Resolved
03/15/2024
Partial from house to meter pit
Erosion Control Inspection Residential Failed 03/21/2024
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
02/06/2024
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. -RESTORE SILT FENCE AT FRONT OF LOT
Occupancy Inspection - Codes Residential Failed 5/1/2024 5/1/2024 05/01/2024
Misc
Corrective Action Required
05/01/2024
-Driveway inspection pending -Complete final grade, sod, splash blocks -Provide erosion control methods until sod is in place -Reinstall ground rod and clamp at meter can -Provide (2) 1/2" through bolts at each deck post to beam connecition -Provide secondary lock at basement sliding glass door -Obtain lawn irrigation permit and backflow certification
Erosion Control Inspection Residential Failed 05/01/2024
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
03/21/2024
-Provide erosion control methods where missing sod. Maintain until sod is installed
Driveway Inspection Passed 5/10/2024 05/10/2024
Misc
Informational
10/23/2023
9-18-23 A.A DW is formed, aggregate is compacted. Will need to maintain 2% slope through driveway but conditions can change, approved to pour 9-25-23 Dustin A, DW is poured. Cannot pass until forms are pulled 10-9-23 Dustin A conditions have not changed 10-16-23 Dustin A, Conditions have not changed 10-23-23 Dustin A, Conditions have not changed 5-10-24 Dustin A, forms have been pulled. Pass
Erosion Control Inspection Residential Passed 06/12/2024
DCM2 ESC DEFICIENT INSTALLATION
Resolved
06/12/2024
-Provide erosion control methods where missing sod. Maintain until sod is installed
Occupancy Inspection - Codes Residential Full C of O 6/12/2024 6/12/2024 06/12/2024
Misc
Resolved
06/12/2024
-Driveway inspection pending -Complete final grade, sod, splash blocks -Provide erosion control methods until sod is in place -Reinstall ground rod and clamp at meter can -Provide (2) 1/2" through bolts at each deck post to beam connecition -Provide secondary lock at basement sliding glass door -Obtain lawn irrigation permit and backflow certification
Plot Plan Inspection Passed 06/12/2024
Documents & Images
Date Uploaded File Type Document Name
03/13/2023 Excise Tax Application
03/13/2023 Permit Application
03/15/2023 Permit Codes Residential Plan Review
03/15/2023 Plot Plan approved plot plan
03/17/2023 Permit Codes Residential Plan Review
03/17/2023 Approved Plans APPROVED PLANS
04/10/2023 Permit DS Building Permit
04/10/2023 Receipt Receipt for transaction:2023-001960
04/13/2023 Letter INSPECTION SUMMARY
05/05/2023 Letter INSPECTION SUMMARY
05/10/2023 Letter INSPECTION SUMMARY
07/06/2023 Letter INSPECTION SUMMARY
08/02/2023 Letter INSPECTION SUMMARY
08/02/2023 Letter INSPECTION SUMMARY
08/02/2023 Letter INSPECTION SUMMARY
08/30/2023 Framing Items Apex Engineers
09/06/2023 Letter INSPECTION SUMMARY
09/08/2023 Letter INSPECTION SUMMARY
09/11/2023 Letter INSPECTION SUMMARY
09/18/2023 Letter INSPECTION SUMMARY
09/25/2023 Letter INSPECTION SUMMARY
10/09/2023 Letter INSPECTION SUMMARY
10/16/2023 Letter INSPECTION SUMMARY
10/16/2023 Letter INSPECTION SUMMARY
10/23/2023 Letter INSPECTION SUMMARY
10/23/2023 Letter INSPECTION SUMMARY
11/08/2023 Letter INSPECTION SUMMARY
11/13/2023 Letter INSPECTION SUMMARY
02/06/2024 Letter INSPECTION SUMMARY
03/12/2024 Letter INSPECTION SUMMARY
03/14/2024 Letter INSPECTION SUMMARY
03/15/2024 Letter INSPECTION SUMMARY
03/21/2024 Letter INSPECTION SUMMARY
05/01/2024 Letter INSPECTION SUMMARY
05/01/2024 Letter INSPECTION SUMMARY
05/06/2024 Release for Sprinkler System
05/06/2024 Sprinkler System Plot Plan
05/10/2024 Letter INSPECTION SUMMARY
06/12/2024 Letter INSPECTION SUMMARY
06/12/2024 Letter Codes Final Certificate of Occupancy
06/12/2024 Letter Field Certificate of Occupancy
06/12/2024 Letter INSPECTION SUMMARY
06/12/2024 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home