Permit Application Status

PRRES20224262


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20224262
Building Permit - Residential
Issued
DAVIDSON JULI LYNN & NATHANIEL BRIAN
ALTERATION SINGLE FAMILY
BASEMENT FINISH / HOMEOWNER DOING ALL THE WORK / CMR NEEDS TO BE DONE FOR EGRESS FOR BEDROOM / NO BEDROOM ALLOWED DUE TO EGRESS ** ON HOLD UNTIL SPRINKLER PLANS HAVE BEEN SUBMITTE AND APROVED. STOP WORK ORDER generated on 09/21/2022 12:00 AM by username 'Mark Harding'. stop work order realeased Brandon Kalwei 10/17/2022 3:56 PM STOP WORK ORDER removed on 11/07/2022 12:00 AM by username 'Michael Harkins'.
08/31/2022
09/15/2022
Locations
Contacts
DAVIDSON JULI LYNN & NATHANIEL BRIAN, Address:319 SE DOUGLAS ST APT 107  
Brian Davidson <briandavidson@kw.com>  
DAVIDSON JULI LYNN & NATHANIEL BRIAN, Address:319 SE DOUGLAS ST APT 107  
Reviews
Review Type Outcome Est. Completion Date Completed
Fire Plan Review Approved with Conditions 10/17/2022 10/17/2022
Jim Eden
Construction documents - Fire protection systems
Corrective Action Required
10/17/2022

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Received
Installation acceptance testing
Corrective Action Required
10/17/2022

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. A visual inspection will be completed at the final inspection.
IFGC - Inspection, testing and maintenance - alarm and extinguishing systems 901.6
Corrective Action Required
10/17/2022

2018 IFC 901.6- Inspection, testing and maintenance. Fire detection, alarm and extinguishing systems shall be maintained in an operative condition at all times, and shall be replaced or repaired where defective. Not required fire protection systems and equipment shall be inspected, tested and maintained or removed. The existing system fire sprinkler shall have a current annual inspection.Verified at inspection.
Licensed Contractors Approved 09/15/2022 09/15/2022
Brandon Kalwei
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Add/Alter Single Family $77.74 $77.74 Paid 09/15/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Final Inspection - Residential Pending
Miscellaneous Correction
Corrective Action Required
11/07/2022
Provide access panel for water main shut off Check on final
Miscellaneous Inspection Pending
Misc
Corrective Action Required
09/21/2022
SITE VISIT WAS MADE 9/21- Permit was issued in error under the residential review. this should be review as a commercial permit and a fire protection plan submitted and reviewed by fire department. no inspections can be performed until the review process and full submitted plans and approval. contract Tracy or Mark. MARK HARDING 09/21/2022 8:44 AM
Miscellaneous Inspection Failed - Stop Work 9/21/2022 09/21/2022
Misc
Corrective Action Required
09/21/2022
SITE VISIT WAS MADE 9/21- Permit was issued in error under the residential review. this should be review as a commercial permit and a fire protection plan submitted and reviewed by fire department. no inspections can be performed until the review process and full submitted plans and approval. contract Tracy or Mark. MARK HARDING 09/21/2022 8:44 AM
All Rough Inspection - Residential Failed 10/18/2022 10/18/2022 10/18/2022
Miscellaneous Correction
Corrective Action Required
10/18/2022
BASEMENT FINISH / HOMEOWNER DOING ALL THE WORK / CMR NEEDS TO BE DONE FOR EGRESS FOR BEDROOM / NO BEDROOM ALLOWED DUE TO EGRESS DEPENDENT ON CMR RESULTS:**
Misc
Corrective Action Required
10/18/2022
NO ACCESS OCCUPIED RESIDENCE CALLED LEFT MESSAGE FOR BRIAN @ 12:49 NO REPLY
All Rough Inspection - Residential Failed 10/18/2022 10/18/2022
Miscellaneous Correction
Corrective Action Required
10/18/2022
BASEMENT FINISH / HOMEOWNER DOING ALL THE WORK / CMR NEEDS TO BE DONE FOR EGRESS FOR BEDROOM / NO BEDROOM ALLOWED DUE TO EGRESS DEPENDENT ON CMR RESULTS:**
Misc
Corrective Action Required
10/18/2022
NO ACCESS OCCUPIED RESIDENCE CALLED LEFT MESSAGE FOR BRIAN @ 12:49 NO REPLY
Miscellaneous Correction
Corrective Action Required
10/18/2022
No city approved plans on site list subject to change Provide access panel for water main shut off Provide clean outs for 90 bath toilet drain Support pex lines toilet supply & vanity Seal all upward penetrations electrical & plumbing Provide plumbing boca plates at top @ bottom plates Provide protection plates electrical or plumbing within 1 1/4 of face of stud Provide vertical fire blocking every 10' Provide fire blocking top plate at floor joist Stair risers shall not vary more than 3/8 in run Fire block dead space at stair landing Provide egress window per fire plan review 36" x 78" landing per fire plan review
All Rough Inspection - Residential Failed 11/2/2022 11/02/2022
Miscellaneous Correction
Corrective Action Required
10/18/2022
BASEMENT FINISH / HOMEOWNER DOING ALL THE WORK / CMR NEEDS TO BE DONE FOR EGRESS FOR BEDROOM / NO BEDROOM ALLOWED DUE TO EGRESS DEPENDENT ON CMR RESULTS:**
Misc
Corrective Action Required
10/18/2022
NO ACCESS OCCUPIED RESIDENCE CALLED LEFT MESSAGE FOR BRIAN @ 12:49 NO REPLY
Miscellaneous Correction
Corrective Action Required
10/18/2022
No city approved plans on site list subject to change Provide access panel for water main shut off Provide clean outs for 90 bath toilet drain Support pex lines toilet supply & vanity Seal all upward penetrations electrical & plumbing Provide plumbing boca plates at top @ bottom plates Provide protection plates electrical or plumbing within 1 1/4 of face of stud Provide vertical fire blocking every 10' Provide fire blocking top plate at floor joist Stair risers shall not vary more than 3/8 in run Fire block dead space at stair landing Provide egress window per fire plan review 36" x 78" landing per fire plan review
Misc
Corrective Action Required
11/02/2022
CALLED BRIAN @ 13:43 MAILBOX FULL STOPPED BY NO ONE HOME @ 14:08
All Rough Inspection - Residential Passed 11/7/2022 11/7/2022 11/07/2022
Miscellaneous Correction
Corrective Action Required
11/02/2022
BASEMENT FINISH / HOMEOWNER DOING ALL THE WORK / CMR NEEDS TO BE DONE FOR EGRESS FOR BEDROOM / NO BEDROOM ALLOWED DUE TO EGRESS DEPENDENT ON CMR RESULTS:**
Misc
Resolved
11/07/2022
NO ACCESS OCCUPIED RESIDENCE CALLED LEFT MESSAGE FOR BRIAN @ 12:49 NO REPLY
Miscellaneous Correction
Resolved
11/07/2022
Misc
Resolved
11/07/2022
CALLED BRIAN @ 13:43 MAILBOX FULL STOPPED BY NO ONE HOME @ 14:08
Documents & Images
Date Uploaded File Type Document Name
08/31/2022 Application Form APPLICATION
09/15/2022 Permit DS Building Permit
09/15/2022 Receipt Receipt for transaction:2022-007560
09/21/2022 Letter Stop Work Order
10/17/2022 Plans fire sprinkler plan
10/17/2022 Letter Fire Building Plan Review
10/18/2022 Letter INSPECTION SUMMARY
10/18/2022 Letter INSPECTION SUMMARY
11/02/2022 Letter INSPECTION SUMMARY
11/02/2022 Letter INSPECTION SUMMARY
11/04/2022 Approved Plans egress step plans
11/04/2022 Approved Plans APPROVED BASEMENT FINISH
11/07/2022 Letter INSPECTION SUMMARY
03/27/2023 Letter Codes 140 Day Letter
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home