Permit Application Status

PRRES20220349


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20220349
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - FINISHED AND UNFINISHED BASEMENT - COVERED PATIO
01/26/2022
04/06/2022
07/27/2022
12/19/2022
Locations
Contacts
ELEVATE DESIGN & BUILD LLC, Address:350 SW LONGVIEW BLVD, Phone:(816) 622-8826  
Elevate Design + Build , Address:350 Longview Blvd.   
SARA@ELEVATEDESIGNBUILDKC.COM  
R-MECH HEATING COOLING PLUMBING/RHODES HEATING COOLING PLUMBING AND ROOTER, Address:1425 AGNES AVE, Phone:(816) 920-5955  
ELECTRICAL CONNECTIONS, Address:20112 HOPS CREEK DR, Phone:(816) 838-6946  
CENTURY PLUMBING, Address:14001 CENTURY LN, Phone:(816) 765-6066  
Glen Hoelting, Address:350 SW Longview Blvd  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331507-Sewer Connection Fee $360.00 $360.00 Paid 04/06/2022
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 04/06/2022
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid 04/06/2022
8331401-Water Tap Fee $3,655.00 $3,655.00 Paid 04/06/2022
8350015-Water Meter Fee $479.24 $479.24 Paid 04/06/2022
9110078-Valuation Fee New Single Family $791.36 $791.36 Paid 04/06/2022
9110080-3rd and Subsequent Inspection Fee (Per Hour) $75.00 $75.00 Paid 12/15/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 5/9/2022 5/9/2022 05/09/2022
Misc
Corrective Action Required
05/09/2022
third party inspection performed
Sewer Service Inspection - R Passed 5/23/2022 (3:00) 5/23/2022 05/23/2022
Water Service Inspection - R Passed 5/26/2022 05/26/2022
Underslab Plumbing Inspection - Residential Passed 6/21/2022 6/21/2022 06/21/2022
Gas Service Inspection - Residential Passed 8/4/2022 8/4/2022 08/04/2022
Electrical Service Inspection Passed 8/4/2022 8/4/2022 08/04/2022
All Rough Inspection - Residential Failed 8/4/2022 8/4/2022 08/04/2022
Misc
Corrective Action Required
08/04/2022
-address over bored studs at garage portal frame/E wall -seal top plate penetrations in garage -anchor bolts to be in the middle 1/3 of sill plate -Address rafters landing on obs -add roof boots for roof penetrations see laundry -address over notched ceiling joist above pantry -hangers for lvl above master -strap top plate above bed 2 closet -seal top plate penetration entry closet -hanger for double lvl above stairs -seal penetrations into furr down in basement hall -seal penetration in RA above bed 4 -vertical to horizontal fireblocking every 10’ see basement W wall -install all doors and windows -complete and install deck
All Rough Inspection - Residential Failed 8/24/2022 8/24/2022 08/24/2022
Misc
Corrective Action Required
08/04/2022
-address over bored studs at garage portal frame/E wall -seal top plate penetrations in garage -anchor bolts to be in the middle 1/3 of sill plate -Address rafters landing on obs -add roof boots for roof penetrations see laundry -address over notched ceiling joist above pantry -hangers for lvl above master -strap top plate above bed 2 closet -seal top plate penetration entry closet -hanger for double lvl above stairs -seal penetrations into furr down in basement hall -seal penetration in RA above bed 4 -vertical to horizontal fireblocking every 10’ see basement W wall -install all doors and windows -complete and install deck
Misc
Corrective Action Required
08/24/2022
inspection denied no address posted
All Rough Inspection - Residential Failed 8/25/2022 8/25/2022 08/25/2022
Misc
Corrective Action Required
08/24/2022
-anchor bolts to be in the middle 1/3 of sill plate -address over notched ceiling joist above pantry -seal penetrations into furr down in basement hall (see beam) -vertical to horizontal fireblocking every 10’ see basement W wall (seal gaps and ensure 10’ is met) -install all doors and windows -complete and install deck Okay to insulate. Do not cover items in need of inspection
Misc
Resolved
08/25/2022
inspection denied no address posted
All Rough Inspection - Residential Passed 8/31/2022 8/31/2022 08/31/2022
Misc
Resolved
08/31/2022
-address over notched ceiling joist above pantry and joist spacing -seal penetrations into furr down in basement hall (see beam) -vertical to horizontal fireblocking every 10’ see basement W wall (seal gaps and ensure 10’ is met) -install all doors and windows -complete and install deck Okay to insulate. Do not cover items in need of inspection
Erosion Control Inspection Residential Failed 10/26/2022 10/26/2022
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
10/26/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Mitchell Schwarz 10/26/2022 2:17 PM
Piers/Caissons Inspection - Residential Passed 10/27/2022 (11:30) 10/27/2022 10/27/2022
Misc
Informational
10/27/2022
2 piers inspected
Driveway Inspection Partial 11/9/2022 11/9/2022 11/02/2022
Misc
Informational
11/02/2022
11-2-22 RH. Driveway is formed up and aggregate is placed and compacted. Approved to pour.
Sidewalk Inspection Partial 11/9/2022 11/9/2022 11/02/2022
Misc
Informational
11/02/2022
11-2-22 RH. Sidewalk is formed up and aggregate is placed and compacted. Approved to pour.
Driveway Inspection Passed 11/9/2022 11/09/2022
Misc
Informational
11/02/2022
11-2-22 RH. Driveway is formed up and aggregate is placed and compacted. Approved to pour. 11-9-22 RH. Driveway meets LS and ADA specification.
Sidewalk Inspection Passed 11/9/2022 11/09/2022
Misc
Informational
11/02/2022
11-2-22 RH. Sidewalk is formed up and aggregate is placed and compacted. Approved to pour. 11-9-22 RH. Sidewalk meets LS and ADA specification.
Erosion Control Inspection Residential Passed 12/14/2022 12/14/2022
DCM3 ESC REQUIRED 2 DAY
Resolved
12/14/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Mitchell Schwarz 10/26/2022 2:17 PM
Occupancy Inspection - Codes Residential Failed 12/14/2022 12/14/2022 12/14/2022
Misc
Corrective Action Required
12/14/2022
-pay all fees -uncover water meter bring flush to grade -spark ring at dining backsplash outlet -spark ring at outlet above fireplace -spark ring at outlets in trim in master -secondary locking device at rear slider -secure conduit at water heater -secure conduit at A/c unit
Plot Plan Inspection Passed 12/14/2022 12/14/2022
Occupancy Inspection - Codes Residential Failed 12/16/2022 12/16/2022 12/16/2022
Misc
Corrective Action Required
12/14/2022
-water meter to be 14”-18” from lid to lid
Occupancy Inspection - Codes Residential Full C of O 12/19/2022 12/19/2022 12/19/2022
Misc
Resolved
12/19/2022
-water meter to be 14”-18” from lid to lid
Documents & Images
Date Uploaded File Type Document Name
01/26/2022 License_Tax_Application
01/26/2022 Residental Permit Application_1
01/28/2022 Permit Codes Residential Plan Review
01/31/2022 Review Comment Response HF26
01/31/2022 Plot Plan APPROVED PLOT PLAN
01/31/2022 Permit Codes Residential Plan Review
04/06/2022 Permit DS Building Permit
04/06/2022 Receipt Receipt for transaction:2022-001918
05/09/2022 26 Hook Farms FTNG
05/09/2022 Letter INSPECTION SUMMARY
05/16/2022 26 Hook Farms FTNG 2
05/23/2022 Letter INSPECTION SUMMARY
05/26/2022 Letter INSPECTION SUMMARY
06/21/2022 Letter INSPECTION SUMMARY
06/21/2022 Approved Plans APPROVED PLANS
08/04/2022 Letter INSPECTION SUMMARY
08/04/2022 Letter INSPECTION SUMMARY
08/04/2022 Letter INSPECTION SUMMARY
08/15/2022 Lot 26 Hook Farms Letter (1)
08/24/2022 Letter INSPECTION SUMMARY
08/25/2022 Letter INSPECTION SUMMARY
08/31/2022 Letter INSPECTION SUMMARY
10/26/2022 Letter INSPECTION SUMMARY
11/02/2022 Letter INSPECTION SUMMARY
11/02/2022 Letter INSPECTION SUMMARY
11/02/2022 Letter INSPECTION SUMMARY
11/02/2022 Approved Plans APPROVED PLANS
11/09/2022 Letter INSPECTION SUMMARY
11/09/2022 Letter INSPECTION SUMMARY
11/29/2022 26 Hook Farm as Graded plot plan
11/29/2022 Plot Plan APPROVED AS GRADED PLOT PLAN
12/14/2022 Letter INSPECTION SUMMARY
12/14/2022 Letter INSPECTION SUMMARY
12/14/2022 Letter INSPECTION SUMMARY
12/15/2022 Receipt Receipt for transaction:2022-009519
12/16/2022 Letter INSPECTION SUMMARY
12/16/2022 Letter INSPECTION SUMMARY
12/19/2022 Letter Codes Final Certificate of Occupancy
12/19/2022 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home