Permit Application Status

PRRES20216103


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20216103
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - FINISHED AND UNFINSISHED BASEMENT - COVERED DECK STOP WORK ORDER generated on 01/04/2022 12:00 AM by username 'Mitchell Schwarz'. STOP WORK ORDER removed on 01/24/2022 12:00 AM by username 'Mitchell Schwarz'. STOP WORK ORDER generated on 03/24/2022 12:00 AM by username 'Mitchell Schwarz'. STOP WORK ORDER removed on 06/17/2022 12:00 AM by username 'Mitchell Schwarz'.
11/24/2021
12/01/2021
12/08/2022
Locations
Contacts
  
Curtis Tate, Address:PO box 942   
TEAGUE ELECTRIC CONSTRUCTION INC, Address:12425 W 92ND ST, Phone:(913) 529-4600  
MIKE BRYANT HEATING & COOLING , Address:1711 E 123RD , Phone:(913) 441-7807  
GARRISON PLUMBING, Address:15430 S MAHAFFIE ST STE 102, Phone:(913) 768-1311  
CURTIS@SABHOMES.COM  
Brandon Bamesberger, Address:PO Box 942  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 12/01/2021
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid 12/01/2021
8331401-Water Tap Fee $3,655.00 $3,655.00 Paid 12/01/2021
8350015-Water Meter Fee $479.24 $479.24 Paid 12/01/2021
9110078-Valuation Fee New Single Family $1,037.77 $1,037.77 Paid 12/01/2021
8331507-Sewer Connection Fee $390.00 $390.00 Paid 12/01/2021
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 12/08/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 12/9/2021 12/09/2021
Misc
Informational
12/09/2021
3RD PARTY INSPECTION
Underslab Plumbing Inspection - Residential Passed 12/22/2021 12/22/2021 12/22/2021
Sewer Service Inspection - R Failed 12/22/2021 (11:00) 12/22/2021 12/22/2021
Misc
Corrective Action Required
12/22/2021
-provide fall toward sewer main
Sewer Service Inspection - R Failed - Stop Work 1/4/2022 1/4/2022 01/04/2022
Misc
Corrective Action Required
12/22/2021
-provide fall toward sewer main STOP WORK ISSUED 01/04/22 -sewer line cover without inspection , uncover sewer line for inspection and provide fall towards sewer main. Mitchell Schwarz 01/04/22 2:30pm
Sewer Service Inspection - R Passed 1/24/2022 (1:30) 1/24/2022 01/24/2022
Misc
Resolved
01/24/2022
-provide fall toward sewer main STOP WORK ISSUED 01/04/22 -sewer line cover without inspection , uncover sewer line for inspection and provide fall towards sewer main. Mitchell Schwarz 01/04/22 2:30pm
Erosion Control Inspection Residential Failed 3/15/2022 03/15/2022
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
03/15/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Silt fence down in multiple areas
Erosion Control Inspection Residential Failed - Stop Work 3/24/2022 03/24/2022
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
03/15/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Silt fence down in multiple areas
Piers/Caissons Inspection - Residential Passed 6/17/2022 (8:30) 6/17/2022 06/17/2022
Erosion Control Inspection Residential Partial 6/17/2022 6/17/2022 06/17/2022
DCM3 ESC REQUIRED 2 DAY
Resolved
06/17/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Silt fence down in multiple areas
Misc
Informational
06/17/2022
Erosion control back in compliance at time of inspection. Mitchell Schwarz 06/17/2022 9:07 AM
Water Service Inspection - R Passed 6/20/2022 (1:00) 6/20/2022 06/20/2022
Electrical Service Inspection Passed 6/30/2022 6/30/2022 06/30/2022
Gas Service Inspection - Residential Passed 6/30/2022 6/30/2022 06/30/2022
All Rough Inspection - Residential Failed 6/30/2022 6/30/2022 06/30/2022
Misc
Corrective Action Required
06/30/2022
-address garage portal frame not framed to plans -seal top of furr out wall in garage -address over notched stud left of service panel -add rafter to ceiling joist connections throughout -address cut hangers above dining -missing nail in hanger above dining -address great room exterior wall greater than 12’ framed 2x4 -fire block vertically to horizontally every 10’ in basement -seal penetrations into furr down bed 3 closet -seal and complete fire blocking at bed 4 window -seal penetrations into furr down at bed 4 S wall -complete dryer vent in basement -(2) 1/2 though bolts at each deck post to beam connection -nail exterior sheathing to plans
All Rough Inspection - Residential Failed 7/15/2022 7/15/2022 07/15/2022
Misc
Corrective Action Required
06/30/2022
House locked could not be not enter. 7/15/22 -address garage portal frame not framed to plans -seal top of furr out wall in garage -address over notched stud left of service panel -add rafter to ceiling joist connections throughout -address cut hangers above dining -missing nail in hanger above dining -address great room exterior wall greater than 12’ framed 2x4 -fire block vertically to horizontally every 10’ in basement -seal penetrations into furr down bed 3 closet -seal and complete fire blocking at bed 4 window -seal penetrations into furr down at bed 4 S wall -complete dryer vent in basement -(2) 1/2 though bolts at each deck post to beam connection -nail exterior sheathing to plans
All Rough Inspection - Residential Failed 7/19/2022 7/19/2022 07/19/2022
Misc
Corrective Action Required
07/15/2022
House locked could not be not enter. 7/15/22 -address garage portal frame not framed to plans -add rafter to ceiling joist connections throughout - -address great room exterior wall greater than 12’ framed 2x4 (fix to engineer letter specifications) -(2) 1/2 though bolts at each deck post to beam connection -nail exterior sheathing to plans
All Rough Inspection - Residential Failed 7/29/2022 7/29/2022 07/29/2022
Misc
Corrective Action Required
07/19/2022
-address garage portal frame not framed to plans add 2x4 over the bottom of LVL and studs along the face of the header. nail 3" o.c. to header and each stud. Replace through bolts to the faace of the dbl rim at the deck. ok to insulate and recall when header issue is complete.
All Rough Inspection - Residential Passed 8/5/2022 8/5/2022 08/05/2022
Misc
Resolved
08/05/2022
-address garage portal frame not framed to plans add 2x4 over the bottom of LVL and studs along the face of the header. nail 3" o.c. to header and each stud. Replace through bolts to the faace of the dbl rim at the deck. ok to insulate and recall when header issue is complete.
Misc
Informational
08/05/2022
Will check through bolts at final
Driveway Inspection Partial 10/12/2022 10/12/2022 10/12/2022
Misc
Informational
10/12/2022
10-12-22 RH. Driveway is formed up and aggregate is place and compacted.
Sidewalk Inspection Partial 10/12/2022 10/12/2022
Misc
Informational
10/12/2022
10-12-22 RH. Sidewalk is formed up and aggregate is placed and compacted.
Sidewalk Inspection Passed 10/19/2022 10/19/2022 10/19/2022
Misc
Informational
10/19/2022
9-12-22 RH. Sidewalk is formed up and aggregate is placed and compacted. 9-19-22 RH. Sidewalk meets LS and ADA specification.
Driveway Inspection Passed 10/19/2022 10/19/2022 10/19/2022
Misc
Informational
10/12/2022
10-12-22 RH. Driveway is formed up and aggregate is place and compacted. 10-19-22 RH. Driveway meets LS and ADA specification.
Erosion Control Inspection Residential Failed 10/26/2022 10/26/2022
Misc
Resolved
10/26/2022
Erosion control back in compliance at time of inspection. Mitchell Schwarz 06/17/2022 9:07 AM
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
10/26/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Mitchell Schwarz 10/26/2022 2:15 PM
Erosion Control Inspection Residential Passed 12/1/2022 12/01/2022
DCM3 ESC REQUIRED 2 DAY
Resolved
12/01/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Mitchell Schwarz 10/26/2022 2:15 PM
Plot Plan Inspection Passed 12/1/2022 12/01/2022
Occupancy Inspection - Codes Residential Failed 12/1/2022 12/1/2022 12/01/2022
Misc
Corrective Action Required
12/01/2022
-guard rail at front stoop where as required by code -address to be properly illuminated -seal all exterior penetrations -water meter well lid to grade. (Maintain 14-18” from meter to lid) -sump pump discharge to extend 36” from foundation -lock out for water heater -handrail at garage stairs -garage door to be self closing -spark ring at outlet above fireplace -provide hardware at deck slider -secondary locking device at basement slider -missing nail in deck hanger -provide working bathroom -install water heater -complete kitchen sink
Occupancy Inspection - Codes Residential Ready for Temp CO 12/7/2022 12/7/2022 12/07/2022
Misc
Corrective Action Required
12/01/2022
-seal all exterior penetrations -water meter well lid to grade. (Maintain 14-18” from meter to lid)
Occupancy Inspection - Codes Residential Full C of O 12/8/2022 12/8/2022 12/08/2022
Misc
Resolved
12/08/2022
-seal all exterior penetrations -water meter well lid to grade. (Maintain 14-18” from meter to lid)
Documents & Images
Date Uploaded File Type Document Name
11/24/2021 hf025 permit app
11/24/2021 HF025 - Air Combustion
11/24/2021 hf25 excise tax app
11/30/2021 Approved Plans APPROVED PLANS
11/30/2021 Permit Codes Residential Plan Review
11/30/2021 Plot Plan APPROVED PLOT PLAN
12/01/2021 Permit DS Building Permit
12/01/2021 Receipt Receipt for transaction:2021-009014
12/08/2021 M L Crose 20233 SW Hook Farm Ln LSMO Hook Farms Lot 25 SAB Permit 2021-6103 Foundation footing Inspection Report 12-8-21
12/09/2021 Letter INSPECTION SUMMARY
12/22/2021 Letter INSPECTION SUMMARY
12/22/2021 Letter INSPECTION SUMMARY
01/04/2022 Letter Stop Work Order
01/24/2022 Letter INSPECTION SUMMARY
03/15/2022 Letter INSPECTION SUMMARY
03/24/2022 Letter Stop Work Order
06/17/2022 Letter INSPECTION SUMMARY
06/17/2022 Letter INSPECTION SUMMARY
06/20/2022 Letter INSPECTION SUMMARY
06/30/2022 Letter INSPECTION SUMMARY
06/30/2022 Letter INSPECTION SUMMARY
06/30/2022 Letter INSPECTION SUMMARY
07/15/2022 Letter INSPECTION SUMMARY
07/18/2022 DW FRAMING INSPECTION RESPONSE Solaia 2023 SW Hook_220718_062346
07/19/2022 Letter INSPECTION SUMMARY
07/29/2022 Letter INSPECTION SUMMARY
08/05/2022 Letter INSPECTION SUMMARY
10/12/2022 Letter INSPECTION SUMMARY
10/12/2022 Letter INSPECTION SUMMARY
10/19/2022 Letter INSPECTION SUMMARY
10/19/2022 Letter INSPECTION SUMMARY
10/26/2022 Letter INSPECTION SUMMARY
12/01/2022 Letter INSPECTION SUMMARY
12/01/2022 Letter INSPECTION SUMMARY
12/01/2022 Letter INSPECTION SUMMARY
12/02/2022 Letter INSPECTION SUMMARY
12/08/2022 Receipt Receipt for transaction:2022-009377
12/08/2022 Letter Codes Final Certificate of Occupancy
12/08/2022 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home