Summary
PRRES20215701
Building Permit - Residential
Certificate of Occupancy
CLAYTON PROPERTIES GROUP INC
NEW SINGLE FAMILY
NEW HOUSE - FINISHED BASEMENT - COVERED DECK
11/01/2021
11/02/2021
08/05/2022
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
CLAYTON PROPERTIES GROUP INC, Address:120 SE 30TH ST  
Summit Homes, Address:120 SE 30th St, Phone:(816) 434-5074 Ext:320  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
michael@summithomeskc.com  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $1,095.89 $1,095.89 Paid 11/02/2021
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 11/02/2021
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid 11/02/2021
8331507-Sewer Connection Fee $420.00 $420.00 Paid 11/02/2021
8331401-Water Tap Fee $3,655.00 $3,655.00 Paid 11/02/2021
8350015-Water Meter Fee $479.24 $479.24 Paid 11/02/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Sewer Service Inspection - R Passed 12/8/2021 12/08/2021
Water Service Inspection - R Passed 12/9/2021 (11:30) 12/9/2021 12/09/2021
Erosion Control Inspection Residential Failed 12/9/2021 12/09/2021
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
12/09/2021
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED.
Footing Inspection - Residential Passed 12/9/2021 12/09/2021
Misc
Corrective Action Required
12/09/2021
3RD PARTY FOOTING BY DEREK PEREZ @ EVERSTEAD SIGNED & SEALED BY BRADLEY HUXOL UFER LOCATED UNDER FRONT STOOP
Underslab Plumbing Inspection - Residential Passed 12/27/2021 12/27/2021 12/27/2021
Electrical Service Inspection Passed 4/25/2022 4/25/2022 04/25/2022
Gas Service Inspection - Residential Failed 4/25/2022 4/25/2022 04/25/2022
Misc
Corrective Action Required
04/25/2022
-complete gas line at basement, pressure test required
All Rough Inspection - Residential Failed 4/25/2022 4/25/2022 04/25/2022
Misc
Corrective Action Required
04/25/2022
-unable to verify nailing pattern at garage PFH with eyebrow installed -nail all exterior sheathing per plans -electrical receptacle required within 25’ of AC exterior -min 24” lap between plate breaks dbl top plate, see garage, front bedroom,o Ive red deck -east corner garage wall, provide full length stud, solid block between sheathing and top plate, provide stud pack for girder truss per plans -provide attic access for attic space above sgl car garage -install front door -address top plate to top plate corner lap connection as required by code at front entry wall -secure all vertical DWV 2” or less at mid point -address top plate to top plate corner lap required per code at master bed south corner, great room 2x6 wall, dining exterior wall corners -nail all intersecting corners 12” o.c. -solid block all sheathing breaks -seal gas line floor penetration at fireplace -seal gaps at fireplace fireblock lid -solid shim all trimmer studs cut short of headers throughout -complete bath exhaust fan duct discharge -bocca protection plate at 1st floor front bathroom top plate must protect plate and 2” below plate -(4) 2X stud packs at all girder truss bearing points, Douglas fir #2 per plans -Fireblock deadspace at corner great room/ laundry wall -have engineer with truss manufacturer address truss A11 that has been broken and has 2x4 scabbed on -provide H2.5 truss hangers at covered deck trusses -nail dbl girder trusses together per plans -nail all truss hangers -address floor joists cut for DWV, basement mech room above sub panel -shield electric sub panel for waste and water lines above -sister 2x6 studs to exterior studs at basement that have been overnotched around anchor bolts -provide plate with anchor bolts and (3) corner studs as required per code at SE corner basement and NE corner basement -secure gas flex line 3” from end of joist at basement den -install basement exterior door -fireblock vertical to horizontal at furred down soffit ends finished basement fur down for DWV at basement bedroom -provide bocca protection plate at top plate and bottom plate basement bathroom/bedroom wall -provide bocca protection plate at DWV at soffit line basement bedroom closet -tape HVAC duct seam basement west bedroom -complete gas line at basement, pressure test required -(2) 2x10 joists at deck header ledger at cantilever per plans -provide joist hangers at deck joists -(2) 1/2” through bolts at post/beam connection at deck
Erosion Control Inspection Residential Partial 4/25/2022 4/25/2022 04/25/2022
DCM2 ESC DEFICIENT INSTALLATION
Resolved
04/25/2022
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED.
Gas Service Inspection - Residential Passed 5/4/2022 5/4/2022 05/04/2022
Misc
Resolved
05/04/2022
-complete gas line at basement, pressure test required
All Rough Inspection - Residential Failed 5/4/2022 5/4/2022 05/04/2022
Misc
Corrective Action Required
04/25/2022
-install front door -address top plate to top plate corner lap required per code at master bed south corner, great room 2x6 wall, dining exterior wall corners, (have an engineer address all of these straps on all of these walls tied together) -nail all intersecting corners 12” o.c. -solid shim all trimmer studs cut short of headers throughout -have engineer with truss manufacturer address truss A11 that has been broken and has 2x4 scabbed on -address floor joists cut for DWV, basement mech room above sub panel -sister 2x6 studs to exterior studs at basement that have been overnotched around anchor bolts -provide plate with anchor bolts and (3) corner studs as required per code at SE corner basement and NE corner basement -secure gas flex line 3” from end of joist at basement den -install basement exterior door
Erosion Control Inspection Residential Partial 5/4/2022 5/4/2022 05/04/2022
All Rough Inspection - Residential Passed 5/6/2022 5/6/2022 05/06/2022
Misc
Resolved
05/06/2022
Erosion Control Inspection Residential Partial 5/6/2022 5/6/2022 05/06/2022
Driveway Inspection Partial 5/12/2022 5/12/2022 05/12/2022
Misc
Informational
05/12/2022
5-12-22 AN forms are in place and aggregate is present and compacted . Told the contractor to compact the approach a little more
Driveway Inspection Passed 5/17/2022 5/17/2022 05/18/2022
Misc
Informational
05/12/2022
5-12-22 AN forms are in place and aggregate is present and compacted . Told the contractor to compact the approach a little more
Misc
Informational
05/18/2022
Driveway meets LS and Ada specs. 5/18/22 ES
Sidewalk Inspection Partial 6/29/2022 6/29/2022 06/29/2022
Misc
Informational
06/29/2022
Sidewalk was framed up with aggregate in and compacted. 6/29/22 ES
Sidewalk Inspection Passed 7/8/2022 7/8/2022 07/08/2022
Misc
Informational
06/29/2022
Sidewalk was framed up with aggregate in and compacted. 6/29/22 ES Sidewalk meets LS and ADA spec. 7/8/22 ES
Plot Plan Inspection Passed 8/2/2022 08/02/2022
Erosion Control Inspection Residential Failed 8/2/2022 08/02/2022
Misc
Corrective Action Required
08/02/2022
- CLEAN GRAVEL AND DEBRIS FROM STREET - MAINTAIN EROSION CONTROL UNTIL SOD IS IN.
Piers/Caissons Inspection - Residential Passed 8/2/2022 08/02/2022
Misc
Informational
08/02/2022
INSPECTED BY THIRD PARTY, EVERSTEAD
Occupancy Inspection - Codes Residential Failed 8/2/2022 8/2/2022 08/02/2022
Miscellaneous Correction
Corrective Action Required
08/02/2022
Obtain irrigation permit and provide back flow certification Provide gutters and down spouts Splash blocks Sump discharge minimum of 36” from foundation Uncover smoke detectors Provide proper electrical whip for garage disposal Attach electrical whip at water heater correctly Improve water defection shield above sub panel
Erosion Control Inspection Residential Passed 08/04/2022
Misc
Resolved
08/04/2022
Occupancy Inspection - Codes Residential Failed 8/4/2022 8/4/2022 08/04/2022
Miscellaneous Correction
Corrective Action Required
08/02/2022
Provide down spouts Splash blocks Sump discharge minimum of 36” from foundation
Occupancy Inspection - Codes Residential Full C of O 8/5/2022 8/5/2022 08/05/2022
Miscellaneous Correction
Resolved
08/05/2022
Provide down spouts Splash blocks Sump discharge minimum of 36” from foundation
Documents & Images
Date Uploaded File Type Document Name
11/01/2021 W0 #124 - Permit App
11/02/2021 Approved Plans Approved Drawings
11/02/2021 Approved Plans Approved Truss Layout
11/02/2021 Approved Plans Approved Truss Pacakge
11/02/2021 Plot Plan Approved Plot Plan
11/02/2021 Permit Codes Residential Plan Review
11/02/2021 Permit DS Building Permit
11/02/2021 Receipt Receipt for transaction:2021-008438
11/23/2021 124 Woodside Ridge FTNG
12/08/2021 Letter INSPECTION SUMMARY
12/09/2021 Letter INSPECTION SUMMARY
12/09/2021 Letter INSPECTION SUMMARY
12/09/2021 Letter INSPECTION SUMMARY
12/27/2021 Letter INSPECTION SUMMARY
04/25/2022 Letter INSPECTION SUMMARY
04/25/2022 Letter INSPECTION SUMMARY
04/25/2022 Letter INSPECTION SUMMARY
04/25/2022 Letter INSPECTION SUMMARY
05/03/2022 2964577 REP SEAL A11 05032022
05/04/2022 Letter INSPECTION SUMMARY
05/04/2022 Letter INSPECTION SUMMARY
05/04/2022 Letter INSPECTION SUMMARY
05/05/2022 WO124 woodside ridge letter
05/06/2022 Letter INSPECTION SUMMARY
05/06/2022 Letter INSPECTION SUMMARY
05/12/2022 Letter INSPECTION SUMMARY
05/18/2022 Letter INSPECTION SUMMARY
06/29/2022 Letter INSPECTION SUMMARY
07/08/2022 Letter INSPECTION SUMMARY
08/01/2022 LOT 124 ASBUILT
08/01/2022 Plot Plan APPROVED AS GRADED PLOT PLAN
08/02/2022 Letter INSPECTION SUMMARY
08/02/2022 Letter INSPECTION SUMMARY
08/02/2022 Letter INSPECTION SUMMARY
08/02/2022 Letter INSPECTION SUMMARY
08/02/2022 Letter INSPECTION SUMMARY
08/04/2022 Letter INSPECTION SUMMARY
08/04/2022 Letter INSPECTION SUMMARY
08/05/2022 Letter Codes Final Certificate of Occupancy
08/05/2022 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home