Permit Application Status

PRRES20215185


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20215185
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - COVERED DECK - UNFINISHED BASEMENT
10/05/2021
10/11/2021
04/03/2022
05/31/2023
Locations
Contacts
WALKER CUSTOM HOMES, LLC, Address:PO BOX 3194, Phone:(913) 208-2026  
Jason walker, Address:PO Box 247, Phone:(913) 208-2026  
JASONFW1@COMCAST.NET  
R-MECH HEATING COOLING PLUMBING/RHODES HEATING COOLING PLUMBING AND ROOTER, Address:1425 AGNES AVE, Phone:(816) 920-5955  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
TRI-COUNTY PLUMBING LLC, Address:PO BOX 234, Phone:(816) 720-3222  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331507-Sewer Connection Fee $570.00 $570.00 Paid 10/11/2021
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 10/11/2021
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid 10/11/2021
9110078-Valuation Fee New Single Family $1,406.06 $1,406.06 Paid 10/11/2021
8331401-Water Tap Fee $3,655.00 $3,655.00 Paid 10/11/2021
8350015-Water Meter Fee $479.24 $479.24 Paid 10/11/2021
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 12/07/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 10/20/2021 10/20/2021 10/20/2021
Underslab Plumbing Inspection - Residential Passed 11/12/2021 11/12/2021 11/12/2021
Sewer Service Inspection - R Passed 11/15/2021 (11:30) 11/15/2021 11/15/2021
Water Service Inspection - R Passed 11/16/2021 11/16/2021 11/16/2021
Erosion Control Inspection Residential Failed 3/29/2022 03/29/2022
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
03/29/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Mitchell Schwarz 03/29/2022 11:39 AM
Erosion Control Inspection Residential Failed 4/28/2022 04/28/2022
DCM3 ESC REQUIRED 2 DAY
Resolved
04/28/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Mitchell Schwarz 03/29/2022 11:39 AM
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
04/28/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. Mitchell Schwarz 04/28/2022 8:14 AM
Electrical Service Inspection Failed 4/28/2022 04/28/2022
Gas Service Inspection - Residential Failed 4/28/2022 04/28/2022
All Rough Inspection - Residential Not Ready 4/28/2022 4/28/2022 04/28/2022
Misc
Corrective Action Required
04/28/2022
Inspection denied -no city stamped plans on site -erosion control not in compliance
Electrical Service Inspection Failed 5/5/2022 5/5/2022 05/05/2022
Misc
Corrective Action Required
05/05/2022
remove paint from ufer ground rod for connection.
Gas Service Inspection - Residential Passed 5/5/2022 5/5/2022 05/05/2022
All Rough Inspection - Residential Failed 5/6/2022 5/6/2022 05/06/2022
Misc
Resolved
05/06/2022
Inspection denied -no city stamped plans on site -erosion control not in compliance
Misc
Corrective Action Required
05/06/2022
-uncover PFG at garage to inspect nailing to header -missing anchor bolt at PFG -block sheathing breaks in garage -7 stands under beam in garage per plans -anchor bolt within 12” of plate ends in garage. But not closer than 7x the bolt diameter -uncover lvls at beck for inspection -fire block above fire place seal all gaps and penetrations -address rafters landing on blocks in master -3 studs under lvl in master walk in closet -fire block master closet window furr down -address from door wall framing plans call for 3 king 1 trimmer -uncover covered from porch for inspection -fire block bed 2 closet into furr down -fire block furr out in bed 2 bath -have engineer address the framing of his area -3 2x10 above bed 2 per plans -roof supports landing on non load bearing wall bed 2 -anchor steel columns in basement -missing steel column in basement
All Rough Inspection - Residential Failed 5/16/2022 5/16/2022 05/16/2022
Misc
Corrective Action Required
05/06/2022
-missing anchor bolt at PFG -fire block above fire place seal all gaps and penetrations -fire block master closet window furr down -address from door wall framing plans call for 3 king 1 trimmer -fire block bed 2 closet into furr down -fire block furr out in bed 2 bath -have engineer address the framing of his area
Electrical Service Inspection Failed 5/16/2022 05/16/2022
Misc
Corrective Action Required
05/05/2022
remove paint from ufer ground rod for connection.
Electrical Service Inspection Passed 6/14/2022 6/14/2022 06/14/2022
Misc
Resolved
06/14/2022
remove paint from ufer ground rod for connection.
Driveway Inspection Partial 7/27/2022 7/27/2022 07/27/2022
Misc
Informational
07/27/2022
7.27.2022 conducted a driveway inspection and pass the sub-grade to pour concrete
Sidewalk Inspection Partial 7/27/2022 7/27/2022 07/27/2022
Misc
Informational
07/27/2022
7.27.2022 conducted a sidewalk inspection and pass the sub-grade to pour concrete
Piers/Caissons Inspection - Residential Passed 11/4/2022 11/04/2022
Plot Plan Inspection Passed 11/4/2022 11/04/2022
Occupancy Inspection - Codes Residential Failed 11/4/2022 11/4/2022 11/04/2022
Misc
Corrective Action Required
11/04/2022
-splash blocks and sump pump discharge to extend 36” from foundation -address pending driveway and sidewalk inspection -provide permanent address of proper size and illumination -garage door to be self closing and latching -open junction box’s above kitchen -install hardware at rear slider -remove chandelier above tub in master -replace spindle at deck allowing greater than 4” sphere through -spindles at stairwell guard inside home -2 1/2” through bolts at each deck post to beam connection -angle brackets at end joists W and E at deck -provide gravel to drain in well -tamper caps at a/c unit -complete lawn irrigation permit -pay all fees
Misc
Informational
11/04/2022
Back flow device is in basement
Driveway Inspection Passed 2/17/2023 2/17/2023 02/17/2023
Misc
Informational
07/27/2022
7.27.2022 conducted a driveway inspection and pass the sub-grade to pour concrete 2-17-23 RH. Meets LS specification.
Sidewalk Inspection Passed 2/17/2023 2/17/2023 02/17/2023
Misc
Informational
07/27/2022
7.27.2022 conducted a sidewalk inspection and pass the sub-grade to pour concrete 2-17-23 RH. Sidewalk meets LS and ADA Specification.
All Rough Inspection - Residential Passed 6/24/2022 6/24/2022 05/26/2023
Misc
Resolved
05/26/2023
Occupancy Inspection - Codes Residential Failed 5/26/2023 5/26/2023 05/26/2023
Misc
Corrective Action Required
11/04/2022
-provide proper post to beam connection at deck
Misc
Informational
11/04/2022
Back flow device is in basement
Erosion Control Inspection Residential Passed 05/31/2023
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
05/31/2023
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. Mitchell Schwarz 04/28/2022 8:14 AM
Occupancy Inspection - Codes Residential Full C of O 6/1/2023 6/1/2023 05/31/2023
Misc
Resolved
05/31/2023
-provide proper post to beam connection at deck
Misc
Resolved
05/31/2023
Back flow device is in basement
Documents & Images
Date Uploaded File Type Document Name
10/05/2021 2035 Wheatfield Ct Lot 40 City Application
10/05/2021 Permit Codes Residential Plan Review
10/06/2021 Approved Plans approved plans
10/08/2021 Plot Plan APPROVED PLOT PLAN
10/08/2021 Permit Codes Residential Plan Review
10/11/2021 Permit DS Building Permit
10/11/2021 Receipt Receipt for transaction:2021-007895
10/20/2021 Letter INSPECTION SUMMARY
11/12/2021 Letter INSPECTION SUMMARY
11/15/2021 Letter INSPECTION SUMMARY
11/16/2021 Letter INSPECTION SUMMARY
03/29/2022 Letter INSPECTION SUMMARY
04/11/2022 Final_2022_04_11_DPier_LSMO_Pat Cochran Concrete
04/12/2022 Final_2022_04_11_DPier_LSMO_Pat Cochran Concrete
04/28/2022 Letter INSPECTION SUMMARY
04/28/2022 Letter INSPECTION SUMMARY
04/28/2022 Letter INSPECTION SUMMARY
04/28/2022 Letter INSPECTION SUMMARY
05/05/2022 Letter INSPECTION SUMMARY
05/05/2022 Letter INSPECTION SUMMARY
05/06/2022 Letter INSPECTION SUMMARY
05/16/2022 Letter INSPECTION SUMMARY
05/27/2022 2035 Wheatfield Court - Structural Letter (May 25, 2022)
06/01/2022 Letter INSPECTION SUMMARY
06/14/2022 Letter INSPECTION SUMMARY
06/24/2022 IMG_20220624_094335
06/24/2022 IMG_20220624_094321
06/24/2022 IMG_20220624_094302
06/24/2022 Letter INSPECTION SUMMARY
08/02/2022 Letter INSPECTION SUMMARY
08/02/2022 Letter INSPECTION SUMMARY
11/04/2022 Letter INSPECTION SUMMARY
11/04/2022 Letter INSPECTION SUMMARY
11/04/2022 Letter INSPECTION SUMMARY
12/07/2022 2035 Wheatfield Ct ROW
12/07/2022 Receipt Receipt for transaction:2022-009350
02/17/2023 Letter INSPECTION SUMMARY
02/17/2023 Letter INSPECTION SUMMARY
05/26/2023 Letter INSPECTION SUMMARY
05/26/2023 Letter INSPECTION SUMMARY
05/31/2023 Letter INSPECTION SUMMARY
05/31/2023 Letter Field Certificate of Occupancy
05/31/2023 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home