Summary
PRRES20214187
Building Permit - Residential
Certificate of Occupancy
WINTERSET 6 LLC
NEW SINGLE FAMILY
NEW HOUSE. FINISHED WALKOUT BASEMENT. COVERED DECK.
08/11/2021
09/01/2021
02/09/2022
09/07/2023
Locations
Contacts
GALE HOMES II INC, Address:400 SW LONGVIEW BLVD, Unit 109, Phone:(816) 761-9292  
MFAULKNER@GALECOMMUNITIES.COM  
WINTERSET 6 LLC, Address:2602 N STADIUM BLVD  
MC ELECTRICAL SERVICES INC, Address:1502 N VANSANT RD, Phone:(816) 392-3970  
APEX HEATING & AIR CONDITIONING INC, Address:1202 NW EAGLE RIDGE BLVD, Phone:(816) 228-2739  
R & R PLUMBING INC, Address:2001 GASLIGHT DR, Phone:(816) 772-5431  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $1,294.37 $1,294.37 Paid 09/01/2021
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 09/01/2021
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid 09/01/2021
8331507-Sewer Connection Fee $480.00 $480.00 Paid 09/01/2021
8331401-Water Tap Fee $3,655.00 $3,655.00 Paid 09/01/2021
8350015-Water Meter Fee $479.24 $479.24 Paid 09/01/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Erosion Control Inspection Residential Failed 2/28/2022 02/28/2022
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
02/28/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Footing Inspection - Residential Passed 3/21/2022 03/21/2022
Erosion Control Inspection Residential Failed 4/18/2022 04/18/2022
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
02/28/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. ALSO POST ADDRESS STOP WORK WILL BE ISSUED 4/21/22 IF NOT ADDRESSED
Sewer Service Inspection - R Passed 4/19/2022 04/19/2022
Water Service Inspection - R Partial 4/19/2022 04/19/2022
Miscellaneous Correction
Corrective Action Required
04/19/2022
Partial, foundation out, tap not complete
Water Service Inspection - R Passed 4/20/2022 (9:00) 4/20/2022 04/20/2022
Miscellaneous Correction
Resolved
04/20/2022
Underslab Plumbing Inspection - Residential Passed 4/26/2022 4/26/2022 04/26/2022
Piers/Caissons Inspection - Residential Passed 07/13/2022
Misc
Informational
07/13/2022
inspection completed by Apex third party.
Electrical Service Inspection Passed 7/13/2022 7/13/2022 07/13/2022
Gas Service Inspection - Residential Passed 7/13/2022 7/13/2022 07/13/2022
Erosion Control Inspection Residential Failed 7/13/2022 07/13/2022
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
04/18/2022
EROSION control needs repair at front of lot. - replace swaddles - Trim tall vegetation on lot.
All Rough Inspection - Residential Failed 7/13/2022 7/13/2022 07/13/2022
Miscellaneous Correction
Corrective Action Required
07/13/2022
-Anchor bolts middle third of plate garage -Fire block penetration nm garage double bay in header -Nail 2x4 to header 2 rows at 3” on center portal frame -Nail exterior corner master bedroom near deck -Strap top plate entry garage side not tied in -Complete nailing LIB pantry -Anchor steel columns at refrigerator -Nail exterior corners in dining room - Nail off CSPF at dining room header - Open covering on deck and front porch or —- - provide ladder for inspection - Fire block soffit ends basement bar/ media - Through bolts on deck post to beam connections 2&1/2” per post - Cut tall vegetation on lot
All Rough Inspection - Residential Failed 7/15/2022 7/15/2022 07/15/2022
Miscellaneous Correction
Corrective Action Required
07/13/2022
-Fire block penetration nm garage double bay in header - Nail off CSPF at dining room header
All Rough Inspection - Residential Passed 7/22/2022 7/22/2022 07/22/2022
Miscellaneous Correction
Resolved
07/22/2022
Driveway Inspection Partial 9/9/2022 9/9/2022 09/09/2022
Misc
Informational
09/09/2022
Driveway was framed up with aggregate in and compacted. Approximately 60lf of curbing needs to be replaced in front of this address. Spoke with concrete crew onsite and informed them of this. They will be ripping curb out and will pour it on 9/12 @ 8am. 9/9/22 ES
Driveway Inspection Partial 9/12/2022 (8:00) 9/12/2022 09/13/2022
Misc
Informational
09/09/2022
Driveway was framed up with aggregate in and compacted. Approximately 60lf of curbing needs to be replaced in front of this address. Spoke with concrete crew onsite and informed them of this. They will be ripping curb out and will pour it on 9/12 @ 8am. 9/9/22 ES Curbing was replaced across front of property and they were pouring concrete later in the day. 9/12/22 ES
Driveway Inspection Partial 9/16/2022 9/16/2022 09/27/2022
Misc
Informational
09/13/2022
Driveway was framed up with aggregate in and compacted. Approximately 60lf of curbing needs to be replaced in front of this address. Spoke with concrete crew onsite and informed them of this. They will be ripping curb out and will pour it on 9/12 @ 8am. 9/9/22 ES Curbing was replaced across front of property and they were pouring concrete later in the day. 9/12/22 ES Curb and approach both meet LS spec. 9/27/22 ES
Driveway Inspection Passed 09/27/2022
Misc
Informational
09/27/2022
Driveway was framed up with aggregate in and compacted. Approximately 60lf of curbing needs to be replaced in front of this address. Spoke with concrete crew onsite and informed them of this. They will be ripping curb out and will pour it on 9/12 @ 8am. 9/9/22 ES Curbing was replaced across front of property and they were pouring concrete later in the day. 9/12/22 ES Curb and approach both meet LS spec. 9/27/22 ES
Erosion Control Inspection Residential Passed 2/14/2023 02/14/2023
DCM3 ESC REQUIRED 2 DAY
Resolved
02/14/2023
Occupancy Inspection - Codes Residential Failed 2/23/2023 2/23/2023 02/23/2023
Misc
Corrective Action Required
02/23/2023
- Sump discharge to be 36” from foundation - Provide splash pads - Add ledger locks at break in ledger at deck - Seal all exterior penetrations - Garage doors must be self closing - Address cubby with ship’s ladder - Add hanger to ductwork in mechanical room near steel columns - Outlet on patio dead - Label non gfci outlet at grinder pump - - Provide (2) 1/2” on each post to beam connections at deck
Plot Plan Inspection Passed 2/23/2023 02/23/2023
Occupancy Inspection - Codes Residential Failed 8/22/2023 08/22/2023
Misc
Corrective Action Required
02/23/2023
- Add ledger locks at break in ledger at deck - Garage doors must be self closing - Address cubby with ship’s ladder - Add hanger to ductwork in mechanical room near steel columns - Outlet on patio dead - Label non gfci outlet at grinder pump
Occupancy Inspection - Codes Residential Full C of O 9/7/2023 09/07/2023
Misc
Resolved
09/07/2023
- Add ledger locks at break in ledger at deck - Garage doors must be self closing - Address cubby with ship’s ladder - Add hanger to ductwork in mechanical room near steel columns - Outlet on patio dead - Label non gfci outlet at grinder pump
Documents & Images
Date Uploaded File Type Document Name
08/12/2021 2021_08_05 Gale Homes_Lot 1473 Winterset Valley_Permit Sets_sealed
08/12/2021 Application Form APPLICATION
08/12/2021 Application Form EXCISE TAX FORM
08/13/2021 Permit Codes Residential Plan Review
08/16/2021 FPS21-0821-Owen Lumber-Gale Homes Lot 1473 Winterset Valley-Layout
09/01/2021 Letter LETTER
09/01/2021 Approved Plans APPROVED JOIST DRAWINGS
09/01/2021 Approved Plans APPROVED DRAWINGS
09/01/2021 Permit Codes Residential Plan Review
09/01/2021 Permit DS Building Permit
09/01/2021 Receipt Receipt for transaction:2021-007063
12/20/2021 2021_12_10 Gale Homes_Lot 1473 Winterset Valley_Pier Report_sealed
12/21/2021 2021_12_10 Gale Homes_Lot 1473 Winterset Valley_Pier Report_sealed
12/21/2021 2021_12_10 Gale Homes_Lot 1473 Winterset Valley_Pier Schedule_sealed
12/21/2021 2021_12_09 Gale Homes_Lot 1473 Winterset Valley_Permit Sets_sealed
12/29/2021 Plot Plan APPROVED PLOT PLAN
12/30/2021 Approved Plans APPROVED DRAWINGS
12/30/2021 Email Memo
12/30/2021 Drawing DRAWINGS
01/24/2022 Final_2022_01_12_HPier_LSMO_Gale Homes
02/28/2022 Letter INSPECTION SUMMARY
02/28/2022 Letter Codes 180 Day Letter
03/21/2022 Letter INSPECTION SUMMARY
04/18/2022 Letter INSPECTION SUMMARY
04/19/2022 Letter INSPECTION SUMMARY
04/19/2022 Letter INSPECTION SUMMARY
04/20/2022 Letter INSPECTION SUMMARY
04/26/2022 Letter INSPECTION SUMMARY
06/28/2022 Final_2022_06_06_Struct_LSMO_Gale Homes
07/13/2022 Letter INSPECTION SUMMARY
07/13/2022 Letter INSPECTION SUMMARY
07/13/2022 Letter INSPECTION SUMMARY
07/13/2022 Letter INSPECTION SUMMARY
07/13/2022 Letter INSPECTION SUMMARY
07/15/2022 Letter INSPECTION SUMMARY
07/22/2022 Letter INSPECTION SUMMARY
09/09/2022 Letter INSPECTION SUMMARY
09/13/2022 Letter INSPECTION SUMMARY
09/27/2022 Letter INSPECTION SUMMARY
09/27/2022 Letter INSPECTION SUMMARY
02/23/2023 Letter INSPECTION SUMMARY
02/23/2023 Letter INSPECTION SUMMARY
02/23/2023 Letter INSPECTION SUMMARY
02/27/2023 Sprinkler Release 3014 NW Thoreau Pl
02/27/2023 ROW irrigation locations 3014 NW Thoreau Pl
07/13/2023 Letter Codes 140 Day Letter
08/22/2023 Letter Codes 180 Day Letter
08/22/2023 Letter INSPECTION SUMMARY
09/07/2023 Letter Codes Final Certificate of Occupancy
09/07/2023 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home