Summary
PRRES20213777
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE. UNFINISHED BASEMENT. COVERED DECK.
07/21/2021
10/04/2021
01/18/2022
08/22/2022
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
Summit Homes, Address:120 SE 30th St, Phone:(816) 434-5074 Ext:320  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
Right of Way Permit Fee $80.00 $80.00 Paid 07/30/2021
Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 07/30/2021
Water Meter Fee $479.24 $479.24 Paid 07/30/2021
Water Tap Fee $3,655.00 $3,655.00 Paid 07/30/2021
8331507-Sewer Connection Fee $330.00 $330.00 Paid 07/30/2021
Valuation Fee New Single Family $1,023.47 $1,023.47 Paid 07/30/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Partial 9/2/2021 9/2/2021 09/02/2021
Misc
Corrective Action Required
09/02/2021
UPLOAD SOIL CONDITION REPOT FOR FOOTING BEARING CAPACITY AND COMPACTED FILL AS NOTED ON INSPECTION REPORT
Underslab Plumbing Inspection - Residential Failed 10/5/2021 10/5/2021 10/05/2021
Misc
Corrective Action Required
10/05/2021
BACKFILL AT FOUNDATION FOR ACCESS TO INSPECT
Underslab Plumbing Inspection - Residential Passed 10/7/2021 10/7/2021 10/07/2021
Misc
Resolved
10/07/2021
Sewer Service Inspection - R Passed 10/26/2021 (1:00) 10/26/2021 10/26/2021
Water Service Inspection - R Passed 11/3/2021 (10:45) 11/3/2021 11/03/2021
Erosion Control Inspection Residential Failed 11/3/2021 11/3/2021 11/03/2021
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
11/03/2021
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Piers/Caissons Inspection - Residential Passed 4/14/2022 (1:00) 4/14/2022 04/14/2022
Corrective Action Required
04/14/2022
Gas Service Inspection - Residential Passed 5/4/2022 5/4/2022 05/04/2022
Electrical Service Inspection Passed 5/4/2022 05/04/2022
All Rough Inspection - Residential Failed 5/4/2022 5/4/2022 05/04/2022
Misc
Corrective Action Required
05/04/2022
-sheathing breaks to be in middle 24” at PFH garage -sold block sheathing breaks S wall -anchor bolts in the middle 1/3 of plate in garage -fireblock above dryer vent -address dryer vent box -missing radon roof boot -provide clearance for electrical at fire place -penetration in bed 2 closet top plate -top plate penetration bed 2 -address over bored joist for dwv south of furnace -complete hvac behind furnace -lateral bracing above front door for trusses
Erosion Control Inspection Residential Failed 5/9/2022 05/09/2022
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
05/09/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
05/09/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
All Rough Inspection - Residential Failed 5/11/2022 5/11/2022 05/11/2022
Misc
Corrective Action Required
05/04/2022
-sheathing breaks to be in middle 24” at PFH garage *okay to insulate*
All Rough Inspection - Residential Failed 5/19/2022 5/19/2022 05/19/2022
Misc
Resolved
05/19/2022
-sheathing breaks to be in middle 24” at PFH garage *okay to insulate*
All Rough Inspection - Residential Passed 5/23/2022 5/23/2022 05/23/2022
Driveway Inspection Partial 6/7/2022 6/7/2022 06/09/2022
Misc
Informational
06/09/2022
The approach has been formed and compacted. Ready for pour.
Sidewalk Inspection Partial 6/7/2022 6/7/2022 06/09/2022
Misc
Informational
06/09/2022
Sidewalk has been formed, compacted and ready to pour.
Occupancy Inspection - Codes Residential Failed 8/9/2022 8/9/2022 08/09/2022
Misc
Corrective Action Required
08/09/2022
-sod -splash blocks and sump pump discharge to extend 36” from foundation -address pending footing inspection -address pending driveway and sidewalk inspections -address to be properly illuminated -outlets in master bast not working -spindles at stairs guard rail -set screw sheered off at water anti syphon device
Plot Plan Inspection Passed 8/9/2022 08/09/2022
Driveway Inspection Passed 8/18/2022 8/18/2022 08/18/2022
Misc
Informational
06/09/2022
The approach has been formed and compacted. Ready for pour. 8-18-22 RH. Driveway meets LS and ADA specification.
Sidewalk Inspection Passed 8/18/2022 8/18/2022 08/18/2022
Misc
Informational
06/09/2022
Sidewalk has been formed, compacted and ready to pour. 8-18-22 RH. Sidewalk meets LS and ADA specification.
Occupancy Inspection - Codes Residential Failed 8/19/2022 8/19/2022 08/19/2022
Misc
Corrective Action Required
08/09/2022
-sod -splash blocks and sump pump discharge to extend 36” from foundation -address pending footing inspection -address pending driveway and sidewalk inspections -address to be properly illuminated -outlets in master bast not working -spindles at stairs guard rail -set screw sheered off at water anti syphon device
Misc
Corrective Action Required
08/19/2022
inspection denied, address letter needed for footing inspection as indicated in footing inspection. Mitchell Schwarz 08/19/2022 9:36 AM
Footing Inspection - Residential Passed 8/22/2022 08/22/2022
Misc
Resolved
08/22/2022
UPLOAD SOIL CONDITION REPOT FOR FOOTING BEARING CAPACITY AND COMPACTED FILL AS NOTED ON INSPECTION REPORT
Erosion Control Inspection Residential Passed 8/22/2022 08/22/2022
DCM3 ESC REQUIRED 2 DAY
Resolved
08/22/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Occupancy Inspection - Codes Residential Full C of O 8/22/2022 8/22/2022 08/22/2022
Misc
Resolved
08/22/2022
-sod -splash blocks and sump pump discharge to extend 36” from foundation -address pending footing inspection -address pending driveway and sidewalk inspections -address to be properly -set screw sheered off at water anti syphon device
Misc
Resolved
08/22/2022
inspection denied, address letter needed for footing inspection as indicated in footing inspection. Mitchell Schwarz 08/19/2022 9:36 AM
Documents & Images
Date Uploaded File Type Document Name
07/21/2021 H4 #126 - PERMIT APPLICATION
07/22/2021 Permit Codes Residential Plan Review
07/26/2021 Plot Plan APPROVED PLOT PLAN
07/26/2021 Approved Plans APPROVED TRUSS LAYOUT
07/26/2021 Approved Plans APPROVED TRUSS PACKAGE
07/30/2021 Approved Plans APPROVED DRAWINGS
07/30/2021 Permit Codes Residential Plan Review
07/30/2021 Permit DS Building Permit
07/30/2021 Receipt Receipt for transaction:2021-006087
09/02/2021 126 Hawthorne Ridge FTNG
09/02/2021 Letter INSPECTION SUMMARY
10/05/2021 Letter INSPECTION SUMMARY
10/07/2021 Letter INSPECTION SUMMARY
10/26/2021 Letter INSPECTION SUMMARY
11/03/2021 Letter INSPECTION SUMMARY
11/03/2021 Letter INSPECTION SUMMARY
03/15/2022 Plot Plan APPROVED PLOT PLAN
03/15/2022 Approved Plans APPROVED DECK REVISION DRAWING
03/23/2022 Letter Codes 140 Day Letter
04/14/2022 Letter INSPECTION SUMMARY
05/04/2022 Letter INSPECTION SUMMARY
05/04/2022 Letter INSPECTION SUMMARY
05/04/2022 Letter INSPECTION SUMMARY
05/06/2022 126 hawthorne ridge letter (002)
05/09/2022 Letter INSPECTION SUMMARY
05/11/2022 Letter INSPECTION SUMMARY
05/19/2022 Letter INSPECTION SUMMARY
05/23/2022 Letter INSPECTION SUMMARY
08/09/2022 Letter INSPECTION SUMMARY
08/09/2022 Letter INSPECTION SUMMARY
08/18/2022 Letter INSPECTION SUMMARY
08/18/2022 Letter INSPECTION SUMMARY
08/19/2022 126 Hawthorne Ridge FTNG
08/19/2022 Letter INSPECTION SUMMARY
08/19/2022 126 Hawthorne Ridge Subgrade
08/22/2022 Letter Field Certificate of Occupancy
08/22/2022 Letter Codes Final Certificate of Occupancy
08/22/2022 Letter INSPECTION SUMMARY
08/22/2022 Letter INSPECTION SUMMARY
08/23/2022 Plot Plan APPROVED AS BUILT PLOT PLAN
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide: