Permit Application Status

PRRES20212837


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20212837
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - UNFINISHED BASEMENT - UNCOVERED PATIO
06/03/2021
06/04/2021
11/30/2021
08/08/2022
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
Summit Homes, Address:120 SE 30th St, Phone:(816) 434-5074 Ext:320  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
LOREN@SUMMITHOMESKC.COM  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee New Single Family $1,183.88 $1,183.88 Paid 06/04/2021
Right of Way Permit Fee $80.00 $80.00 Paid 06/04/2021
Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 06/04/2021
Water Tap Fee $3,581.00 $3,581.00 Paid 06/04/2021
Water Meter Fee $455.54 $455.54 Paid 06/04/2021
8331507-Sewer Connection Fee $540.00 $540.00 Paid 06/04/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 7/8/2021 7/8/2021 07/08/2021
Underslab Plumbing Inspection - Residential Passed 8/6/2021 8/6/2021 08/06/2021
Sewer Service Inspection - R Passed 8/25/2021 (1:00) 8/25/2021 08/25/2021
Water Service Inspection - R Passed 8/26/2021 08/26/2021
Erosion Control Inspection Residential Failed 8/26/2021 8/26/2021 08/26/2021
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
08/26/2021
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Electrical Service Inspection Passed 1/18/2022 1/18/2022 01/18/2022
Gas Service Inspection - Residential Failed 1/18/2022 1/18/2022 01/18/2022
Misc
Corrective Action Required
01/18/2022
-COMPLETE GAS LINE INSTALL AT FIREPLACE
All Rough Inspection - Residential Failed 1/18/2022 1/18/2022 01/18/2022
Misc
Corrective Action Required
01/18/2022
-Truss hold downs at all truss ends throughout -nail protection plate at all NM 1 1/4” or less from end of stud- see garage -address top plate to top plate connection at intersecting corner as required by code- see garage wall, front entry wall, have engineer address -fur down at garage ceiling to allow for insulation at HVAC -joist hanger at sgl joist to header connection south garage -anchor bolts required within 12” of plate breaks at garage -seal annular space around penetrations in fireblock at furred down soffit end at garage -solid block between joists, lateral restraint, kitchen wall 1st floor -address floor joist overbored for DWV north side kitchen 1st floor -support all DWV 48” oc, traps not considered support -secure all vertical DWV 2” or less at mid point -Install all windows -fireblock HVAC/plumbing chase at foyer/garage -complete gas line install at fireplace -secure gas flex line at fireplace -seal all bottom plate penetrations - see great room -joist hangers required all sgl joist to dbl joist connection at foyer 1st floor -seal unused top plate bore front office 1st floor -min (4) stud pack at all girder truss beating ends per plans -(3) 2x4 stud pack at glulam beams bearing ends at garage wall per plans -(2) 2x4 trimmer studs at garage entry door, kitchen, pantry, master bedroom per plans -header off floor joist cut for HVAC at box out, 1st floor foyer closet, joist currently supported by non load bearing wall -(4) 2x4 stud pack at glulam bearing end 1st floor great room per plans -LIB bracing at all locations per plans -(3) 2x4 trimmer studs at glulam header 1st floor flex window per plans -CS-PF bracing per plans at 1st floor flex window per plans -missing stud at 2nd floor bath wall -vent all bath exhaust fans to exterior at 2nd floor -fireblock HVAC chase 2nd floor hall -Have engineer address (3) trusses that have been altered in field at master bedroom -address top plate to top plate connection 2x6 to 2x4 wall 2nd floor stair wall -all truss hangers per plans -all truss bracing per plans -Anchor all SCH 40 columns to floor at basement -solid block between joists every 48” oc for kitchen island per plans -nail sheathing CS-PF per plans/code -nail all exterior sheathing per plans
Gas Service Inspection - Residential Passed 2/11/2022 2/11/2022 02/11/2022
Misc
Resolved
02/11/2022
-COMPLETE GAS LINE INSTALL AT FIREPLACE
All Rough Inspection - Residential Failed 2/11/2022 2/11/2022 02/11/2022
Misc
Corrective Action Required
01/18/2022
-address top plate to top plate connection at intersecting corner as required by code- see garage wall, front entry wall, have engineer address FIX TO ENGINEER SPECIFICATIONS -anchor bolts required within 12” of plate breaks at garage AND TIGHT -seal annular space around penetrations in fireblock at furred down soffit end at garage -support all DWV 48” oc, traps not considered support -secure all vertical DWV 2” or less at mid point -Install all windows -seal all bottom plate penetrations - see great room stair wall -seal unused top plate bore front office 1st floor -min (4) stud pack at all girder truss beating ends per plans -(2) 2x4 trimmer studs at master bedroom per plans -(3) 2x4 trimmer studs at glulam header 1st floor flex window per plans -missing stud at 2nd floor bath wall -vent all bath exhaust fans to exterior at 2nd floor see bath 3 -Have engineer address (3) trusses that have been altered in field at master bedroom -truss hold downs at master bed to bath 2 wall -address top plate to top plate connection 2x6 to 2x4 wall 2nd floor stair wall fix to engineer specifications
All Rough Inspection - Residential Failed 2/22/2022 2/22/2022 02/22/2022
Misc
Corrective Action Required
02/11/2022
-anchor bolts required within 12” of plate breaks at garage AND TIGHT -seal annular space around penetrations in fireblock at furred down soffit end at garage see hvac chase to furr down in garage -secure all vertical DWV 2” or less at mid point -Install all windows -seal unused top plate bore front office 1st floor-NEAR ENTRY -min (4) stud pack at all girder truss beating ends per plans -(2) 2x4 trimmer studs at master bedroom per plan -(3) 2x4 trimmer studs at 1st floor flex window per plans -truss hold downs at master bed to bath 2 wall
All Rough Inspection - Residential Passed 2/24/2022 2/24/2022 02/24/2022
Misc
Resolved
02/24/2022
-seal annular space around penetrations in fireblock at furred down soffit end at garage see hvac chase to furr down in garage -truss hold downs at master bed to bath 2 wall
Driveway Inspection Passed 4/14/2022 4/14/2022 04/14/2022
Misc
Informational
04/14/2022
On Thursday, 4-14-2022, I preformed a driveway inspection and passed the sub-grade for concrete placement.
Sidewalk Inspection Passed 4/14/2022 4/14/2022 04/14/2022
Misc
Informational
04/14/2022
On Thursday 4-14-2022, I performed and passed a sidewalk inspection for concrete placement.
Occupancy Inspection - Codes Residential Failed 6/1/2022 6/1/2022 06/01/2022
Misc
Corrective Action Required
06/01/2022
-final grade and sod -splash blocks and sump pump discharge to extend 36” from foundation -check water meter at time of final grade and sod -premise identification to be properly illuminated -guard rail at front stoop as required where more than 30” from ground 36” out -hand rail at basement stairs
Occupancy Inspection - Codes Residential Temporary C of O 6/3/2022 6/3/2022 06/03/2022
Misc
Corrective Action Required
06/01/2022
TCO UNTIL 7/5/22 -final grade and sod -splash blocks and sump pump discharge to extend 36” from foundation -check water meter at time of final grade and sod
Miscellaneous Inspection Failed 7/13/2022 07/13/2022
FD2703.6 Signs.
Informational
07/13/2022
I received a call from Public Works that there was a stop sign down at this property. The sign was damaged and not put back in properly. It also was noticed that the valve box on the property was also damaged. Public Works said that it apprears to have been damaged by someone grading or installing sprinklers. I would suggest no Final Occupancy until this has been resolved.
Plot Plan Inspection Passed 8/8/2022 08/08/2022
Erosion Control Inspection Residential Passed 8/8/2022 08/08/2022
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
08/08/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Miscellaneous Inspection Passed 8/8/2022 8/8/2022 08/08/2022
FD2703.6 Signs.
Resolved
08/08/2022
I received a call from Public Works that there was a stop sign down at this property. The sign was damaged and not put back in properly. It also was noticed that the valve box on the property was also damaged. Public Works said that it apprears to have been damaged by someone grading or installing sprinklers. I would suggest no Final Occupancy until this has been resolved.
Occupancy Inspection - Codes Residential Full C of O 8/8/2022 8/8/2022 08/08/2022
Misc
Resolved
08/08/2022
TCO UNTIL 7/5/22 -final grade and sod -splash blocks and sump pump discharge to extend 36” from foundation -check water meter at time of final grade and sod
Documents & Images
Date Uploaded File Type Document Name
06/03/2021 H4 #109 - PERMIT APP
06/03/2021 Approved Plans Approved Drawings
06/03/2021 Approved Plans Approved Truss Layout
06/03/2021 Approved Plans Approved Truss Package
06/03/2021 Permit Codes Residential Plan Review
06/04/2021 Plot Plan Approved Plot Plan
06/04/2021 Permit Codes Residential Plan Review
06/04/2021 Permit DS Building Permit
06/04/2021 Receipt Receipt for transaction:2021-003945
07/07/2021 Lot 109 Hawthorne Ridge Footing Inspection
07/08/2021 Letter INSPECTION SUMMARY
08/06/2021 Letter INSPECTION SUMMARY
08/25/2021 Letter INSPECTION SUMMARY
08/26/2021 Letter INSPECTION SUMMARY
08/26/2021 Letter INSPECTION SUMMARY
01/18/2022 Letter INSPECTION SUMMARY
01/18/2022 Letter INSPECTION SUMMARY
01/18/2022 Letter INSPECTION SUMMARY
01/28/2022 109 HAWTHORNE RIDGE ROOF LAYOUT REVISED 8-26
01/28/2022 Approved Plans Approved Revised Drawings
02/03/2022 109 hawthorne ridge overbored hole and spliced top plate letter
02/11/2022 Letter INSPECTION SUMMARY
02/11/2022 Letter INSPECTION SUMMARY
02/16/2022 Approved Plans Approved Truss repair
02/22/2022 Letter INSPECTION SUMMARY
02/24/2022 109 Hawthorne Ridge trimmer studs
02/24/2022 Letter INSPECTION SUMMARY
04/14/2022 Letter INSPECTION SUMMARY
04/14/2022 Letter INSPECTION SUMMARY
06/01/2022 Letter INSPECTION SUMMARY
06/03/2022 Letter Codes Temporary Certificate of Occupancy
07/13/2022 Letter INSPECTION SUMMARY
07/18/2022 Plot Plan Approved As Graded Plot Plan
07/21/2022 Letter INSPECTION SUMMARY
08/08/2022 Letter Codes Final Certificate of Occupancy
08/08/2022 Letter Field Certificate of Occupancy
08/08/2022 Letter INSPECTION SUMMARY
08/08/2022 Letter INSPECTION SUMMARY
08/08/2022 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home