Permit Application Status

PRRES20212709


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20212709
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - FINISHED AND UNFINISHED BASEMENT - COVERED DECK
05/25/2021
06/01/2021
07/07/2022
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
Summit Homes, Address:120 SE 30th St, Phone:(816) 434-5074 Ext:320  
PERMITTING@SUMMITHOMESKC.COM  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
Right of Way Permit Fee $80.00 $80.00 Paid 06/01/2021
Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 06/01/2021
Valuation Fee New Single Family $1,031.60 $1,031.60 Paid 06/01/2021
8331507-Sewer Connection Fee $420.00 $420.00 Paid 06/01/2021
Water Tap Fee $3,581.00 $3,581.00 Paid 06/01/2021
Water Meter Fee $455.54 $455.54 Paid 06/01/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 7/20/2021 7/20/2021 07/20/2021
Underslab Plumbing Inspection - Residential Failed 8/10/2021 8/10/2021 08/10/2021
Misc
Corrective Action Required
08/10/2021
INSTALL INTERIOR DRAIN TILE
Underslab Plumbing Inspection - Residential Passed 8/19/2021 8/19/2021 08/19/2021
Misc
Resolved
08/19/2021
Sewer Service Inspection - R Passed 8/27/2021 (1:00) 8/27/2021 08/27/2021
Water Service Inspection - R Passed 8/31/2021 08/31/2021
Erosion Control Inspection Residential Failed 8/31/2021 8/31/2021 08/31/2021
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
08/31/2021
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Gas Service Inspection - Residential Passed 1/25/2022 1/25/2022 01/25/2022
Electrical Service Inspection Passed 2/1/2022 2/1/2022 02/01/2022
All Rough Inspection - Residential Failed 2/1/2022 2/1/2022 02/01/2022
Misc
Corrective Action Required
02/01/2022
-provide anchor bolt for sill plate at south side of sgl car garage door -protect all NM within 6’ of attic entrance -provide engineer letter on field fix of straps for top plate to top plate connection at west garage wall -add stud shoe to stud bored for SE cable at garage exterior wall -studs over notched for NM and GEC at girder truss stud pack west garage wall -provide nail protection plates at NM 1 /4” or less from end of stud-see garage -(2) 2x4 trimmer studs at garage entry per plans -top plate to top plate connection as required by code at front entry exterior wall, great room fireplace exterior wall -Install all exterior doors and windows -seal unused top plate bore at master bed -seal top plate penetration at pantry -fireblock between studs at wall line fireplace exterior wall at great room, open to attic space above -solid block all sheathing breaks -fireblock between studs at top plate for bump out furring strips at tub, 1st floor north bath -Min (4) 2X stud pack at girder truss bearing ends per plans -CS-PF design per plans at dining room windows, see plans/IRC R602.10.6.4 -all truss lateral bracing per plans -provide anchor bolt at bottom sill plate NW corner of basement -security blocking at basement walkout -complete fur out for beam corner at basement den -address floor joist cut for DWV north basement -provide 1” clearance from combustibles at b vent basement mechanical -complete bath exhaust duct at basement bath -fireblock vertical to horizontal at furred down soffit ends finished basement -SW basement bedroom corner framing incomplete, (3) corner studs, sill plate and dbl top plate should extend to corner -add plumbing for basement den wet bar -2x12 floor joist, dbl every other joist at cantilever den per plans -nail all exterior sheathing per plans
Erosion Control Inspection Residential Partial 2/1/2022 2/1/2022 02/01/2022
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
02/01/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Misc
Corrective Action Required
02/01/2022
EROSION CONTROL ACCEPTABLE AT TIME OF INSPECTION
All Rough Inspection - Residential Failed 2/28/2022 2/28/2022 02/28/2022
Misc
Corrective Action Required
02/01/2022
-protect all NM within 6’ of attic entrance -provide engineer letter on field fix of straps for top plate to top plate connection at west garage wall -studs over notched for NM and GEC at girder truss stud pack west garage wall -top plate to top plate connection as required by code at front entry exterior wall, great room fireplace exterior wall -Min (4) 2X stud pack at girder truss bearing ends per plans -CS-PF design per plans at dining room windows, see plans/IRC exterior nail pattern -complete fur out for beam corner at basement den -address floor joist cut for DWV north basement -complete bath exhaust duct at basement bath -fix all engineer letter items to engineer specifications
All Rough Inspection - Residential Passed 3/4/2022 3/4/2022 03/04/2022
Misc
Corrective Action Required
02/28/2022
Driveway Inspection Passed 4/4/2022 4/4/2022 04/04/2022
Misc
Informational
04/04/2022
On Monday 4-04-2022, I performed and passed a driveway inspection. The sub-grade and forms were acceptable to place concrete.
Sidewalk Inspection Passed 4/4/2022 4/4/2022 04/04/2022
Misc
Informational
04/04/2022
On Monday 4-04-2022, I performed and passed the sub-grade and forms for concrete placement.
Piers/Caissons Inspection - Residential Passed 6/15/2022 06/15/2022
Misc
Informational
06/15/2022
addressed in third party footing inspection
Occupancy Inspection - Codes Residential Failed 6/15/2022 6/15/2022 06/15/2022
Misc
Corrective Action Required
06/15/2022
-access to master tub motor to code -afci protection for mud room -splash blocks and sump pump discharge to extend 36” from foundation -water meter lid to grade (maintain 14”-18” clearance from meter lid to well lid) -siding from ground to code see back of lot -submit as graded plot plan -outlet at hvac to be GFCI protected
Plot Plan Inspection Passed 7/5/2022 07/05/2022
Erosion Control Inspection Residential Passed 7/5/2022 07/05/2022
Misc
Resolved
07/05/2022
EROSION CONTROL ACCEPTABLE AT TIME OF INSPECTION
Occupancy Inspection - Codes Residential Failed 7/5/2022 7/5/2022 07/05/2022
Misc
Corrective Action Required
06/15/2022
-water meter lid to grade (maintain 14”-18” clearance from meter lid ring)
Occupancy Inspection - Codes Residential Full C of O 7/7/2022 7/7/2022 07/07/2022
Misc
Resolved
07/07/2022
-water meter lid to grade (maintain 14”-18” clearance from meter lid ring)
Documents & Images
Date Uploaded File Type Document Name
05/25/2021 159 Hawthorne Ridge Roof Layout
05/25/2021 HT #159 - PERMIT APP
05/25/2021 LOT 159 FINAL
05/25/2021 HT #159 - Newhaven - Mediterranean - WO15x10C - Sheets- signed
05/25/2021 2770190 RF SEALS 05032021
05/27/2021 Approved Plans APPROVED PLANS
05/27/2021 Approved Plans APPROVED PLOT PLAN
05/27/2021 Approved Plans APPROVED TRUSS DRAWINGS
05/27/2021 Approved Plans APPROVED TRUSS LAYOUT
06/01/2021 Permit Codes Residential Plan Review
06/01/2021 Permit DS Building Permit
06/01/2021 Receipt Receipt for transaction:2021-003705
07/19/2021 159 Hawthorne Ridge Footing Inspection
07/20/2021 Letter INSPECTION SUMMARY
08/10/2021 Letter INSPECTION SUMMARY
08/19/2021 Letter INSPECTION SUMMARY
08/27/2021 Letter INSPECTION SUMMARY
08/31/2021 Letter INSPECTION SUMMARY
08/31/2021 Letter INSPECTION SUMMARY
01/25/2022 Letter INSPECTION SUMMARY
01/25/2022 Letter INSPECTION SUMMARY
02/01/2022 Letter INSPECTION SUMMARY
02/01/2022 Letter INSPECTION SUMMARY
02/01/2022 Letter INSPECTION SUMMARY
02/25/2022 159 Hawthorne Ridge Letter rev
02/28/2022 Letter INSPECTION SUMMARY
03/02/2022 159 Hawthorne Ridge Letter 3-1-22
03/04/2022 Letter INSPECTION SUMMARY
04/04/2022 Letter INSPECTION SUMMARY
04/04/2022 Letter INSPECTION SUMMARY
04/27/2022 Letter INSPECTION SUMMARY
06/15/2022 Letter INSPECTION SUMMARY
06/15/2022 Letter INSPECTION SUMMARY
06/16/2022 Plot Plan APPROVED AS GRADED PLOT PLAN
07/05/2022 Letter INSPECTION SUMMARY
07/05/2022 Letter INSPECTION SUMMARY
07/05/2022 Letter INSPECTION SUMMARY
07/07/2022 Letter Field Certificate of Occupancy
07/07/2022 Letter Codes Final Certificate of Occupancy
07/13/2022 146 Hawthorne Ridge Field Issue 2
07/13/2022 LOT 101 ASBUILT 7-8-22
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home