Permit Application Status

PRRES20212466


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20212466
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - UNFINISHED BASEMENT - COVERED DECK STOP WORK ORDER generated on 07/16/2021 12:00 AM by username 'Mark Harding'. STOP WORK ORDER removed on 07/20/2021 12:00 AM by username 'Robb Popp'.
05/13/2021
06/15/2021
11/13/2021
01/05/2024
Locations
Contacts
STEWART BUILDERS LLC, Address:12 SEQUOYAH PT, Phone:(816) 510-7850  
RANDY@STEWARTBUILDERSKC.COM  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
TRI-COUNTY PLUMBING LLC, Address:PO BOX 234, Phone:(816) 720-3222  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $1,472.01 $1,472.01 Paid 06/15/2021
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 06/15/2021
7232302-Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 06/15/2021
8331507-Sewer Connection Fee $540.00 $540.00 Paid 06/15/2021
8331401-Water Tap Fee $3,581.00 $3,581.00 Paid 06/15/2021
8350015-Water Meter Fee $455.54 $455.54 Paid 06/15/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Failed - Stop Work 7/16/2021 7/16/2021 07/16/2021
Misc
Corrective Action Required
07/16/2021
3rd Party inspection denied. No address, no erosion control, no construction entrance. Stop Construction issued. False engineers report stating erosion controls is in place. David Ainsworth PE.
Misc
Corrective Action Required
07/16/2021
Do not pour foundation until erosion control and construction entrance is in place and re-inspected.
Footing Inspection - Residential Passed 07/20/2021
Misc
Resolved
07/20/2021
3rd Party inspection denied. No address, no erosion control, no construction entrance. Stop Construction issued. False engineers report stating erosion controls is in place. David Ainsworth PE.
Misc
Resolved
07/20/2021
Do not pour foundation until erosion control and construction entrance is in place and re-inspected.
Miscellaneous Correction
Corrective Action Required
07/20/2021
Footing approved by David Ainsworth
Underslab Plumbing Inspection - Residential Passed 8/3/2021 8/3/2021 08/03/2021
Sewer Service Inspection - R Passed 8/20/2021 (8:15) 8/20/2021 08/20/2021
Water Service Inspection - R Passed 8/20/2021 (1:45) 8/20/2021 08/20/2021
Erosion Control Inspection Residential Failed 5/6/2022 5/6/2022 05/06/2022
DCM5 ESC INSP DENIED
Corrective Action Required
05/06/2022
REQUESTED INSPECTION(S) DENIED DUE TO DEFICIENT EROSION CONTROL INSTALLATION. MAINTAIN EROSION CONTROL ON LOT
Electrical Service Inspection Failed 5/6/2022 5/6/2022 05/06/2022
Misc
Corrective Action Required
05/06/2022
REQUESTED INSPECTION(S) DENIED DUE TO DEFICIENT EROSION CONTROL INSTALLATION. MAINTAIN EROSION CONTROL ON LOT
Gas Service Inspection - Residential Failed 5/6/2022 5/6/2022 05/06/2022
Misc
Corrective Action Required
05/06/2022
REQUESTED INSPECTION(S) DENIED DUE TO DEFICIENT EROSION CONTROL INSTALLATION. MAINTAIN EROSION CONTROL ON LOT
All Rough Inspection - Residential Failed 5/6/2022 5/6/2022 05/06/2022
Misc
Corrective Action Required
05/06/2022
REQUESTED INSPECTION(S) DENIED DUE TO DEFICIENT EROSION CONTROL INSTALLATION. MAINTAIN EROSION CONTROL ON LOT
Electrical Service Inspection Failed 5/11/2022 5/11/2022 05/11/2022
Misc
Corrective Action Required
05/06/2022
NO PRESSURE ON GAUGE, IDENTIFY BONDING CONDUCTOR WITH GREEN AT BOTH ENDS
Gas Service Inspection - Residential Failed 5/11/2022 5/11/2022 05/11/2022
Misc
Corrective Action Required
05/06/2022
NO PRESSURE ON GAUGE, IDENTIFY BONDING CONDUCTOR AT BOTH ENDS
Electrical Service Inspection Passed 05/11/2022
Misc
Resolved
05/11/2022
NO PRESSURE ON GAUGE, IDENTIFY BONDING CONDUCTOR WITH GREEN AT BOTH ENDS
All Rough Inspection - Residential Failed 5/11/2022 5/11/2022 05/11/2022
Misc
Corrective Action Required
05/06/2022
HOUSE NOT READY. ADDRESS ALL ITEMS BEFORE RE INSPECTION. HAVE ENGINEER ADDRESS FRAMING ISSUES WITH ENGINEER BEFORE REINSPECTION -Tighten all anchor bolts -Remove insulation from wall and ceiling joists -Pan off fur out and hvac chase with approved materials -Overnotched hip joist at entry/ garage beam -Address ceiling joist, hip, rafter and beam taper cuts and overnotched rafters throughout -Fireblock gap sheathing to roof space at garage return wall -Address end rafter not bearing on 1.5” at glue lam -Support hip above glue lam -Support hips in double car bay - not easily visible due to plywood but visibly not supported -Support 2x/lvl/glue lam at double car header both sides -Provide attic access for single car bay -Fur down for R19 at mechanical in garage -Seal top plate penetration in laundry -Address roof bearing on ceiling joists in kitchen -Anchor column bases in basement
Gas Service Inspection - Residential Passed 5/25/2022 5/25/2022 05/25/2022
Misc
Resolved
05/25/2022
All Rough Inspection - Residential Failed 5/25/2022 5/25/2022 05/25/2022
Misc
Corrective Action Required
05/11/2022
-Pan off fur out and hvac chase with approved materials -Support hip above glue lam -Support hips in double car bay - not easily visible due to plywood but visibly not supported -Support 2x/lvl/glue lam at double car header both sides 5-25-22 - Fire block penetration at RA hallway outside of laundry - Fire block master shower DWV - Land electrical in box and tie wires in master bathroom - Security blocking at sliding door - Open lid of deck roof for inspection - Provide clearance at B vent and ductwork in attic space
All Rough Inspection - Residential Passed 5/26/2022 05/26/2022
Misc
Resolved
05/26/2022
Piers/Caissons Inspection - Residential Passed 8/12/2022 (9:00) 8/12/2022 08/12/2022
Driveway Inspection Passed 8/22/2022 8/22/2022 08/22/2022
Misc
Informational
08/22/2022
On Monday, 8-22-2022. I performed and passed a driveway inspection at this location for concrete placement.
Plot Plan Inspection Passed 9/30/2022 09/30/2022
Erosion Control Inspection Residential Failed 1/26/2023 01/26/2023
DCM5 ESC INSP DENIED
Resolved
01/26/2023
REQUESTED INSPECTION(S) DENIED DUE TO DEFICIENT EROSION CONTROL INSTALLATION. MAINTAIN EROSION CONTROL ON LOT
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
01/26/2023
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Mitchell Schwarz 01/26/2023 2:57 PM
Erosion Control Inspection Residential Passed 6/26/2023 06/26/2023
DCM3 ESC REQUIRED 2 DAY
Resolved
06/26/2023
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Mitchell Schwarz 01/26/2023 2:57 PM
Occupancy Inspection - Codes Residential Failed 6/26/2023 6/26/2023 06/26/2023
Miscellaneous Correction
Corrective Action Required
06/26/2023
-Sod to siding must have a 6 inch clearance. -Two exterior splash pads are broken -Sidewalk inspection must pass
Sidewalk Inspection Passed 6/27/2023 6/27/2023 06/27/2023
Misc
Informational
06/27/2023
6-27-23 PS Sidewalk meets ADA and LS specifications
Occupancy Inspection - Codes Residential Full C of O 1/5/2024 1/5/2024 01/05/2024
Miscellaneous Correction
Resolved
01/05/2024
-Sod to siding must have a 6 inch clearance. -Two exterior splash pads are broken -Sidewalk inspection must pass
Documents & Images
Date Uploaded File Type Document Name
05/13/2021 Application Form APPLICATION
05/13/2021 Application Form excise tax
05/13/2021 DW Permit Plan Harrison II Lot 2 Cobey Creek
05/13/2021 Lot 2 CC Plot Plan
05/17/2021 Permit Codes Residential Plan Review
05/20/2021 Lot 2 CC Plot Plan Revised
05/20/2021 Plot Plan APPROVED PLOT PLAN
05/21/2021 DW Revised Permit Plan Harrison II Lot 2 Cobey Creek 508 SE David Rd
05/21/2021 Approved Plans APPROVED PLANS
05/21/2021 Permit Codes Residential Plan Review
06/15/2021 Permit DS Building Permit
06/15/2021 Receipt Receipt for transaction:2021-004420
07/14/2021 M L Crose 508 SE David Rd LSMO Cobey Creek Lot 2 Stewart P 2021-2466
07/16/2021 Letter Stop Work Order
07/16/2021 508 se david
07/20/2021 Letter INSPECTION SUMMARY
08/03/2021 Letter INSPECTION SUMMARY
08/20/2021 Letter INSPECTION SUMMARY
08/20/2021 Letter INSPECTION SUMMARY
05/04/2022 Plans APPROVED I JOIST PLAN
05/06/2022 Letter INSPECTION SUMMARY
05/06/2022 Letter INSPECTION SUMMARY
05/06/2022 Letter INSPECTION SUMMARY
05/06/2022 Letter INSPECTION SUMMARY
05/11/2022 Letter INSPECTION SUMMARY
05/11/2022 Letter INSPECTION SUMMARY
05/11/2022 Letter INSPECTION SUMMARY
05/11/2022 Letter INSPECTION SUMMARY
05/23/2022 DW FRAMING ADDENDUM[1]
05/25/2022 Letter INSPECTION SUMMARY
05/25/2022 Letter INSPECTION SUMMARY
05/26/2022 Letter INSPECTION SUMMARY
08/12/2022 Letter INSPECTION SUMMARY
08/22/2022 Letter INSPECTION SUMMARY
09/29/2022 Plot Plan APPROVED AS GRADED PLOT PLAN
09/30/2022 Letter INSPECTION SUMMARY
01/26/2023 Letter INSPECTION SUMMARY
06/15/2023 Letter Codes 140 Day Letter
06/26/2023 Letter INSPECTION SUMMARY
06/26/2023 Letter INSPECTION SUMMARY
06/27/2023 Letter INSPECTION SUMMARY
11/14/2023 Letter Codes 140 Day Letter
12/28/2023 Letter Codes 180 Day Letter
01/05/2024 Letter Codes Final Certificate of Occupancy
01/05/2024 Letter Field Certificate of Occupancy
01/05/2024 Letter Codes 180 Day Letter
01/05/2024 Letter Codes 140 Day Letter
01/05/2024 Letter Codes 140 Day Letter
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home