Permit Application Status

PRRES20204843


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20204843
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - ROOF TRUSSES - TILE ROOF - UNIFNISHED BASEMENT - COVERED DECK
12/18/2020
12/21/2020
06/19/2021
11/15/2021
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
PERMITTING@SUMMITHOMESKC.COM  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 12/23/2020 12/21/2020
Brandon Kalwei
Residential Plan Review Approved 12/23/2020 12/21/2020
Brandon Kalwei
14 Identify roof covering material (IRC Section R905)
Corrective Action Required
12/21/2020

Identify roof covering material (IRC Section R905) Plan shows composition roofing material, application shows cement/tile roof. Need to verify on plans
Plot Plan Review Approved 12/22/2020 12/21/2020
Brandon Kalwei
Residential Plan Review Rejected 12/22/2020 12/18/2020
Brandon Kalwei
14 Identify roof covering material (IRC Section R905)
Corrective Action Required
12/18/2020

Identify roof covering material (IRC Section R905) Plan shows composition roofing material, application shows cement/tile roof. Need to verify on plans
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $1,563.07 $1,563.07 Paid 12/21/2020
8331507-Sewer Connection Fee $600.00 $600.00 Paid 12/21/2020
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 12/21/2020
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid 12/21/2020
8331401-Water Tap Fee $3,581.00 $3,581.00 Paid 12/21/2020
8350015-Water Meter Fee $455.54 $455.54 Paid 12/21/2020
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 11/12/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Erosion Control Inspection Residential Failed 2/22/2021 02/22/2021
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
02/22/2021
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. - MAINTAIN SILT FENCE - - MAINTAIN GRAVEL FILTER - - MAINTAIN GUTTER BUDDY'S -
Sewer Service Inspection - R Passed 2/22/2021 (1:15) 2/22/2021 02/22/2021
Footing Inspection - Residential Failed 2/22/2021 02/22/2021
Misc
Corrective Action Required
02/22/2021
- NO FOOTING INSPECTION ON RECORD SUBMIT 3RD PARTY INSPECTIONS WITHIN 48 HOURS OF POUR -
Water Service Inspection - R Passed 2/23/2021 (11:30) 2/23/2021 02/23/2021
Footing Inspection - Residential Passed 2/22/2021 03/02/2021
Misc
Resolved
03/02/2021
Misc
Informational
03/02/2021
- 3RD PARTY FOOTING BY DEREK PEREZ @ RES SIGNED & SEALED BY BRADLEY HUXOL - - UFER LOCATED NEAR SOUTH WEST ( RIGHT REAR ) CORNER OF GARAGE FOUNDATION WALL -
Underslab Plumbing Inspection - Residential Failed 3/3/2021 3/3/2021 03/03/2021
R506.2.5 Interior Underslab Drains
Corrective Action Required
03/03/2021
CONCRETE FLOORS (ON GROUND). ADDED 7-927. Where foundations retain earth and enclose habitable or usable space located below grade, drains shall be provided below the floor slab. Drainage tiles, perforated pipe or other approved systems or materials shall be installed at or below the area(s) to be protected; shall be placed with positive or neutral slope to minimize the accumulation of deposits in the drainage system; and shall discharge by gravity or mechanical means to an approved storm water drainage system. The underslab drainage system shall be installed around the inner perimeter of the area(s) to be protected, or, in a manner that will provide adequate drainage for all area(s) to be protected and is approved by the building official. Interior underslab drains installed on uncompacted fill material shall be supported by mechanical means which are adequately tied into the concrete slab to ensure proper drainage throughout the underslab drain(s). - COMPLETE UNDERSLAB INTERIOR DRAIN TILE CONNECTION TO SUMP PUMP -
Underslab Plumbing Inspection - Residential Passed 3/4/2021 3/4/2021 03/04/2021
R506.2.5 Interior Underslab Drains
Resolved
03/04/2021
Electrical Service Inspection Passed 5/10/2021 05/10/2021
Gas Service Inspection - Residential Failed 5/10/2021 05/10/2021
Miscellaneous Correction
Corrective Action Required
05/10/2021
SECURE / SHIELD AND CONNECT GAS LINE AT FIREPLACE
All Rough Inspection - Residential Failed 5/10/2021 05/10/2021
Miscellaneous Correction
Corrective Action Required
05/10/2021
Install back ordered windows & doors Provide min 2 anchor bolts SCH 40 column garage Unable to verify nailing patter PFH portal frame garage PFH portal frame garage fasten top plate to header with two rows of 16D sinkers @ 3" OC per plan Seal electrical top plate penetration owners entry @ coat closet Provide anchor bolt NW corner of garage Provide interior LIB bracing per plan Provide boca plate Bed 1 W I closet at pex lines Seal electrical penetrations top plate Bed 1 W I closet Seal exterior penetration rear wall Bed #1 Nail studs at intersecting wall corners at braced wall panels per plan Secure / Shield & connect gas line at fireplace Provide 6 x 6 full height continuous post covered deck per plan Provide CS-PF exterior bracing per plan at SGD Secure bath exhaust with metallic tape bath # 2 Tighten anchor bolts basement Provide siding at cantilever rear wall basement under deck Provide (3) 2 x 4 studs & SCH 40 column under stairs near service panel per plan Provide blocking floor joist parallel to foundation wall Shim cripple studs under (4) LVLs rear wall basement for solid bearing Provide CS-PF ext bracing at back ordered windows south rear wall basement per plan Provide (6) 2 x 6 GT Bearing loft top of stairs per plan Seal electrical penetration top plate at above Provide WSP Bracing bed 2 per plan & solid block nail per code same at stairway Expose deck & porch trusses / framing
Erosion Control Inspection Residential Failed 5/10/2021 05/10/2021
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
02/22/2021
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. - MAINTAIN SILT FENCE - - MAINTAIN GRAVEL FILTER - - MAINTAIN GUTTER BUDDY'S -
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
05/10/2021
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. - MAINTAIN SILT FENCE - - MAINTAIN GRAVEL FILTER - - CLEAN STREET -
Gas Service Inspection - Residential Passed 5/20/2021 5/20/2021 05/20/2021
Miscellaneous Correction
Resolved
05/20/2021
All Rough Inspection - Residential Failed 5/20/2021 5/20/2021 05/20/2021
Miscellaneous Correction
Corrective Action Required
05/10/2021
Install back ordered windows & doors PFH portal frame garage fasten top plate to header with two rows of 16D sinkers @ 3" OC per plan Nail studs at intersecting wall corners at braced wall panels Provide 6 x 6 full height continuous post covered deck per plan Secure bath exhaust with metallic tape bath # 2 Provide SCH 40 column under stairs near service panel per plan Provide CS-PF ext bracing at back ordered windows south rear wall basement per plan Provide WSP Bracing bed 2 per plan
All Rough Inspection - Residential Not Ready 5/25/2021 5/25/2021 05/25/2021
Miscellaneous Correction
Corrective Action Required
05/20/2021
Install back ordered windows & doors PFH portal frame garage fasten top plate to header with two rows of 16D sinkers @ 3" OC per plan ( nail LVL header to top plate) Provide 6 x 6 full height continuous post covered deck per plan ( engineer letter ? ) Secure bath exhaust with metallic tape bath # 2 ( not done) Provide SCH 40 column under stairs near service panel (per plan ) not done Provide CS-PF ext bracing at back ordered windows south rear wall basement per plan ( no straps on rear wall) Provide WSP Bracing bed 2 per plan ( engineer letter ? )
All Rough Inspection - Residential Failed 5/27/2021 5/27/2021 05/27/2021
Miscellaneous Correction
Corrective Action Required
05/25/2021
Install back ordered windows & doors Provide CS-PF ext bracing nailing patter 3" OC at back ordered windows rear wall basement per plan OK TO INSULATE
Driveway Inspection Partial 6/4/2021 6/4/2021 06/04/2021
Misc
Informational
06/04/2021
Forms were placed and aggregate was present and compacted. RP 6-4-21
Driveway Inspection Passed 6/11/2021 6/11/2021 06/11/2021
Misc
Informational
06/04/2021
Forms were placed and aggregate was present and compacted. RP 6-4-21
Misc
Informational
06/11/2021
Finished driveway meets LS specs. RP 6-11-21
Plot Plan Inspection Passed 9/30/2021 09/30/2021
Piers/Caissons Inspection - Residential Passed 9/30/2021 09/30/2021
Misc
Informational
09/30/2021
3rd party by RES on footing report
Occupancy Inspection - Codes Residential Failed 9/30/2021 9/30/2021 09/30/2021
Miscellaneous Correction
Corrective Action Required
09/30/2021
Rough in failed window nailing CS-PF still missing windows Pay outstanding fees Engineer letter foundation wall crack under beam Provide deadbolt front door Provide missing window front door & basement with flashing Provide access to jacuzzi tub motor Provide cover plate linen closet second story Provide through bolts deck beam per code Provide ledger locks per code Complete exterior trim at single car garage door Seal top of meter can & ac disconnect Seal exterior penetrations at gas line, low volt at meter can Sump shall discharge 36" from foundation
Occupancy Inspection - Codes Residential Failed 10/26/2021 10/26/2021 10/26/2021
Miscellaneous Correction
Corrective Action Required
09/30/2021
Provide cover plate linen closet second story Provide through bolts deck beam per code Provide ledger locks per code
All Rough Inspection - Residential Passed 10/27/2021 10/27/2021 10/27/2021
Miscellaneous Correction
Resolved
10/27/2021
Occupancy Inspection - Codes Residential Failed 10/27/2021 10/27/2021 10/27/2021
Miscellaneous Correction
Corrective Action Required
10/26/2021
Provide through bolts deck beam per code Provide ledger locks per code
Occupancy Inspection - Codes Residential Temporary C of O 10/28/2021 10/28/2021 10/28/2021
Miscellaneous Correction
Corrective Action Required
10/27/2021
TCO UNTIL 11/26/2021 Provide through bolts deck beam per code Provide ledger locks per code
Occupancy Inspection - Codes Residential Failed 11/12/2021 11/12/2021 11/12/2021
Miscellaneous Correction
Corrective Action Required
11/12/2021
Pay fees
Occupancy Inspection - Codes Residential Full C of O 11/15/2021 11/15/2021 11/15/2021
Miscellaneous Correction
Resolved
11/15/2021
Documents & Images
Date Uploaded File Type Document Name
12/18/2020 Approved Plans APPROVED TRUSS LAYOUT
12/18/2020 Approved Plans APPROVED TRUSS LAYOUT
12/18/2020 Approved Plans APPROVED TRUSS DRAWINGS
12/21/2020 Plot Plan APPROVED PLOT PLAN
12/21/2020 Letter Codes Residential Plan Review
12/21/2020 Application Form APPLICATION
12/21/2020 Approved Plans APPROVED PLANS
12/21/2020 Receipt Receipt for transaction:2020-008138
12/21/2020 Letter DS Building Permit
02/22/2021 Letter INSPECTION SUMMARY
02/22/2021 Letter INSPECTION SUMMARY
02/22/2021 Letter INSPECTION SUMMARY
02/22/2021 Letter INSPECTION SUMMARY
02/22/2021 Letter INSPECTION SUMMARY
02/23/2021 Letter INSPECTION SUMMARY
03/02/2021 Lot 114 Woodside Ridge Footing Inspection
03/02/2021 Letter INSPECTION SUMMARY
03/03/2021 Letter INSPECTION SUMMARY
03/03/2021 Letter INSPECTION SUMMARY
03/04/2021 Letter INSPECTION SUMMARY
05/10/2021 Letter INSPECTION SUMMARY
05/10/2021 Letter INSPECTION SUMMARY
05/10/2021 Letter INSPECTION SUMMARY
05/10/2021 Letter INSPECTION SUMMARY
05/20/2021 Letter INSPECTION SUMMARY
05/20/2021 Letter INSPECTION SUMMARY
05/20/2021 Letter INSPECTION SUMMARY
05/25/2021 Letter INSPECTION SUMMARY
05/26/2021 114 Woodside Ridge Letter
05/27/2021 Letter INSPECTION SUMMARY
06/04/2021 Letter INSPECTION SUMMARY
06/11/2021 Letter INSPECTION SUMMARY
09/30/2021 Letter INSPECTION SUMMARY
09/30/2021 Letter INSPECTION SUMMARY
09/30/2021 Letter INSPECTION SUMMARY
10/25/2021 114 Woosdie Ridge Foundation crack
10/26/2021 Letter INSPECTION SUMMARY
10/27/2021 Letter INSPECTION SUMMARY
10/27/2021 Letter INSPECTION SUMMARY
10/28/2021 Letter Codes Temporary Certificate of Occupancy
11/12/2021 Letter INSPECTION SUMMARY
11/12/2021 Receipt Receipt for transaction:2021-008722
11/15/2021 Letter Field Certificate of Occupancy
11/15/2021 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide: