PRRES20204524
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - ROOF TRUSS - FINISHED BASEMENT - CLAY TILE ROOF
12/01/2020
12/22/2020
06/19/2021
12/08/2021
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
PERMITTING@SUMMITHOMESKC.COM  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 12/28/2020 12/22/2020
Dylan Eppert
As-graded plot plan
Corrective Action Required
12/22/2020

A as-graded plot plan per Section 7-160, Code of Ordinances, is required prior to occupancy.
Residential Plan Review Approved 12/28/2020 12/22/2020
Dylan Eppert
Plot Plan Review Rejected 12/11/2020 12/21/2020
Dylan Eppert
As-graded plot plan
Corrective Action Required
12/21/2020

A as-graded plot plan per Section 7-160, Code of Ordinances, is required prior to occupancy.
Planning Review (RES) Approved 12/18/2020 12/16/2020
Shannon McGuire
Residential Plan Review Approved 12/11/2020 12/09/2020
Dylan Eppert
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $954.74 $954.74 Paid 12/22/2020
8331507-Sewer Connection Fee $420.00 $420.00 Paid 12/22/2020
8331401-Water Tap Fee $3,581.00 $3,581.00 Paid 12/22/2020
8350015-Water Meter Fee $455.54 $455.54 Paid 12/22/2020
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 12/22/2020
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid 12/22/2020
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 10/12/2021
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 10/12/2021
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 10/12/2021
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 10/12/2021
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 10/12/2021
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 10/12/2021
9110080-3rd and Subsequent Inspection Fee (Per Hour) $50.00 $50.00 Paid 10/12/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Failed 3/2/2021 03/02/2021
Misc
Corrective Action Required
03/02/2021
NO FOOTING INSPECTION ON RECORD SUBMIT 3RD PARTY INSPECTIONS WITHIN 48 HRS OF POUR
Sewer Service Inspection - R Passed 3/2/2021 03/02/2021
Water Service Inspection - R Passed 3/4/2021 (1:30) 3/4/2021 03/04/2021
Erosion Control Inspection Residential Failed 3/16/2021 03/16/2021
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
03/16/2021
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. - MAINTAIN SILT FENCE - - CLEAN STREET -
Underslab Plumbing Inspection - Residential Passed 3/16/2021 3/16/2021 03/16/2021
Footing Inspection - Residential Passed 2/23/2021 03/24/2021
Misc
Informational
03/24/2021
- 3RD PARTY FOOTING BY DEREK PEREZ @ RES SIGNED & SEALED BY BRADLEY HUXOL - - UFER LOCATED CENTER RIGHT OF SOUTH REAR GARAGE FOUNDATION WALL -
All Rough Inspection - Residential Failed 5/5/2021 5/5/2021 05/05/2021
Misc
Corrective Action Required
05/05/2021
Builder requested framing inspection of the garage PFH walls and rear porch roof only: -Install garage PFH wall straps -Tie down trusses above rear porch
Piers/Caissons Inspection - Residential Passed 6/8/2021 06/08/2021
Misc
Informational
06/08/2021
POURED FOOTING INLO DECK PIERS ON 3RD PARTY INSPECTION REPORT
Electrical Service Inspection Failed 6/8/2021 6/8/2021 06/08/2021
Misc
Corrective Action Required
06/08/2021
NOT READY FOR ROUGH IN
Gas Service Inspection - Residential Failed 6/8/2021 6/8/2021 06/08/2021
Misc
Corrective Action Required
06/08/2021
NOT READY FOR ROUGH IN
All Rough Inspection - Residential Not Ready 6/8/2021 6/8/2021 06/08/2021
Misc
Corrective Action Required
05/05/2021
Builder requested framing inspection of the garage PFH walls and rear porch roof only: -Install garage PFH wall straps -Tie down trusses above rear porch
Misc
Corrective Action Required
06/08/2021
HOUSE NOT READY FOR ROUGH IN NO INSPECTION PERFORMED LIST SUBJECT TO CHANGE ADDRESS BELOW ITEMS BEFORE RESCHEDULING Address trusses out of plumb west side Provide truss hangers per plan LUS24 Solid block breaks in sheathing nail per code Address top plate exterior corner not tied together Provide 4 studs at GT Bearing points per roof plan
All Rough Inspection - Residential Not Ready 6/17/2021 6/17/2021 06/17/2021
Misc
Corrective Action Required
06/08/2021
Builder requested framing inspection of the garage PFH walls and rear porch roof only: -Install garage PFH wall straps -Tie down trusses above rear porch
Misc
Corrective Action Required
06/08/2021
HOUSE NOT READY FOR ROUGH IN NO INSPECTION PERFORMED LIST SUBJECT TO CHANGE ADDRESS BELOW ITEMS BEFORE RESCHEDULING Address trusses out of plumb west side Provide truss hangers per plan LUS24 Solid block breaks in sheathing nail per code Address top plate exterior corner not tied together Provide 4 studs at GT Bearing points per roof plan 6-17-21 NOT READY. A FEE HAS BEEN ASSESSED. NO ITEMS FROM PREVIOUS INSPECTION HAVE BEEN ADDRESSED OR CORRECTED. - EXTERIOR BRACED WALLS REQUIRE 8D NAILS 6" OC AT EDGES AND 12" OC IN THE FIELD. THESE PANELS STAPLED ON AND THERE ARE MULTIPLE LOCATIONS WHERE THE SHEATHING IS NOT LANDING ON A STUD PER THE PREVIOUS INSPECTOIN. THE TYVEK NEEDS TO BE REMOVED TO VERIFY PROPER FASTENING METHOD AND COMPLETION OF NAILING PATTERN. -ALL EXTERIOR CORNERS NEED TO BE FRAMED AND CONNECTED PER CODE -THERE ARE MULTIPLE GT BEARING LOCATIONS THAT REQUIRE ADDITIONAL SUPPORT PER PLAN - ADDRESS THE TRUSSES THAT ARE INSTALLED OUT OF PLUMB ON THE WEST SIDE OF THE HOUSE -ADDRESS ALL OF THE ITEMS FROM THE PREVIOUS INSPECTION BEFORE RESCHEDULING
All Rough Inspection - Residential Failed 6/28/2021 6/28/2021 06/28/2021
Misc
Corrective Action Required
06/17/2021
FRAMING: -Install hangers at connections to girder truss C01 above foyer -Install 2 nails at each end of bracing strap -Brace interior wall per plan (pantry/closet wall) -Fb space adjacent to refrigerator&shower from roof -At rear dining wall corner, provide 3-stud corner and nail studs per code; or fill in gap with plywood and nail studs together per code -Strap rear dining CSPF walls headers and nail exterior siding per code. Look at plan for details -Provide full bearing for both plies of the porch (2)2x10 beam. Complete walls -Nail truss hanger above corner of slide door wall and rear great room wall -Provide continuous sheathing for rear great room wall to top plate -Install hangers at all connections to girder truss C08 -Nail sheathing to studs at master bedroom/deck wall -Nail wall intersection studs; nail all wall corner studs per code (16d@12” or equivalent nailing) -Nail together C08 girder truss above b-vent chase -Tie down C08 girder truss to laundry/garage wall; tie down C trusses to garage/mud wall; same for GT A04 to garage/closet wall -Anchor garage sill plate within 12” of break; min 2 anchors per short plate -Brace C and A trusses per plan -Anchor basement sill plate within 12” of breaks throughout; tighten down all anchor nuts -Fb basement wall vertically at ten ft or less interval; fb both basement closet walls from fur down ceiling space and soffit -Nail all deck joist hangers; lag ledger board to rim band; install middle support post for deck beam -One wrong joist hanger installed above furnace ELECTRICAL: -Re-install electrical in front bedroom and master bedroom -Seal all wiring penetrations of return air space -Secure NM cable at max 4.5 ft and min 1.25” from stud surface at corner of rear great room wall and slide door wall MECHANICAL: -Provide min 1” clearance from b-vent to combustible PLUMBING: -Secure pex water line at basement bathroom tub **DO NOT INSULATE
Misc
Resolved
06/28/2021
Electrical Service Inspection Passed 6/28/2021 6/28/2021 06/28/2021
Misc
Resolved
06/28/2021
NOT READY FOR ROUGH IN
Gas Service Inspection - Residential Passed 6/28/2021 6/28/2021 06/28/2021
Misc
Resolved
06/28/2021
NOT READY FOR ROUGH IN
All Rough Inspection - Residential Not Ready 6/30/2021 6/30/2021 06/30/2021
Misc
Corrective Action Required
06/28/2021
FRAMING: -Install 2 nails at each end of bracing strap -Brace interior wall per plan (pantry/closet wall) -Fb space adjacent to refrigerator&shower from roof -Strap rear dining CSPF walls headers and nail exterior siding per code. Look at plan for details -Provide full bearing for both plies of the porch (2)2x10 beam. Complete walls -Provide continuous sheathing for rear great room wall to top plate -Nail sheathing to studs at master bedroom/deck wall -Nail wall intersection studs; nail all wall corner studs per code (16d@12” or equivalent nailing) -Tie down C08 girder truss to laundry/garage wall; tie down C trusses to garage/mud wall; same for GT A04 to garage/closet wall -Anchor garage sill plate within 12” of break; min 2 anchors per short plate -Brace C and A trusses per plan -Anchor basement sill plate within 12” of breaks throughout; tighten down all anchor nuts -Fb basement wall vertically at ten ft or less interval; fb both basement closet walls from fur down ceiling space and soffit -Nail all deck joist hangers; lag ledger board to rim band; install middle support post for deck beam. ELECTRICAL: -Re-install electrical in front bedroom and master bedroom -Seal all wiring penetrations of return air space -Secure NM cable at max 4.5 ft and min 1.25” from stud surface at corner of rear great room wall and slide door wall PLUMBING: -Secure pex water line at basement bathroom tub **DO NOT INSULATE
All Rough Inspection - Residential Not Ready 7/9/2021 7/12/2021 07/12/2021
Misc
Corrective Action Required
06/30/2021
FRAMING: -Install 2 nails at each end of bracing strap -Fb space adjacent to refrigerator&shower from roof -Strap rear dining CSPF walls headers and nail exterior siding per code. Look at plan for details -Provide full bearing for both plies of the porch (2)2x10 beam. Complete walls -Provide continuous sheathing for rear great room wall to top plate -Nail sheathing to studs at master bedroom/deck wall -Nail wall intersection studs; nail all wall corner studs per code (16d@12” or equivalent nailing) -Tie down C08 girder truss to laundry/garage wall; tie down C trusses to garage/mud wall; same for GT A04 to garage/closet wall -Anchor garage sill plate within 12” of break; min 2 anchors per short plate -Brace C and A trusses per plan -Anchor basement sill plate within 12” of breaks throughout; tighten down all anchor nuts -Fb basement wall vertically at ten ft or less interval; fb both basement closet walls from fur down ceiling space and soffit -Nail all deck joist hangers; lag ledger board to rim band; install middle support post for deck beam. ELECTRICAL: -Re-install electrical in front bedroom and master bedroom -Seal all wiring penetrations of return air space -Secure NM cable at max 4.5 ft and min 1.25” from stud surface at corner of rear great room wall and slide door wall **DO NOT INSULATE
All Rough Inspection - Residential Not Ready 7/14/2021 7/14/2021 07/14/2021
Misc
Corrective Action Required
07/12/2021
FRAMING: -Install 2 nails at each end of bracing strap (LIBs only have one nail in top ) -Fb space adjacent to refrigerator&shower from roof -Strap rear dining CSPF walls headers and nail exterior siding per code. Look at plan for details -Provide full bearing for both plies of the porch (2)2x10 beam. Complete walls -Provide continuous sheathing for rear great room wall to top plate ( solid block & nail per code ) -Nail sheathing to studs at master bedroom/deck wall -Nail wall intersection studs; nail all wall corner studs per code (16d@12” or equivalent nailing) -Tie down C08 girder truss to laundry/garage wall; tie down C trusses to garage/mud wall; same for GT A04 to garage/closet wall -Anchor garage sill plate within 12” of break; min 2 anchors per short plate -Brace C and A trusses per plan -Anchor basement sill plate within 12” of breaks throughout; tighten down all anchor nuts -Fb basement wall vertically at ten ft or less interval; fb both basement closet walls from fur down ceiling space and soffit -Nail all deck joist hangers; lag ledger board to rim band; install middle support post for deck beam. ELECTRICAL: -Re-install electrical in front bedroom and master bedroom -Seal all wiring penetrations of return air space -Secure NM cable at max 4.5 ft and min 1.25” from stud surface at corner of rear great room wall and slide door wall **DO NOT INSULATE NOT READY 7/14/21 : DO NOT INSULATE 7/14/21
All Rough Inspection - Residential Not Ready 7/16/2021 7/16/2021 07/16/2021
Misc
Corrective Action Required
07/14/2021
FRAMING: -Fb space adjacent to refrigerator&shower from roof (Stand in front of tub and look up) -Strap rear dining CSPF walls headers and nail exterior siding per code. Look at plan for details -Provide full bearing for both plies of the porch (2)2x10 beam. Complete walls -Provide continuous sheathing for rear great room wall to top plate ( solid block & nail per code ) -Nail sheathing to studs at master bedroom/deck wall -Tie down GT A04 to garage/closet wall -Anchor garage sill plate within 12” of break; min 2 anchors per short plate -Brace C and A trusses per plan -Fb basement wall vertically at ten ft or less interval; fb both basement closet walls from fur down ceiling space and soffit ( seal gaps ) -Nail all deck joist hangers; lag ledger board to rim band; install middle support post for deck beam. ELECTRICAL: -Re-install electrical in front bedroom and master bedroom -Seal all wiring penetrations of return air space -Secure NM cable at max 4.5 ft and min 1.25” from stud surface at corner of rear great room wall and slide door wall **DO NOT INSULATE NOT READY 7/14/21 : DO NOT INSULATE 7/14/21
All Rough Inspection - Residential Passed 7/21/2021 7/21/2021 07/21/2021
Misc
Resolved
07/21/2021
FRAMING: -Fb space adjacent to refrigerator&shower from roof (Stand in front of tub and look up) -Strap rear dining CSPF walls headers and nail exterior siding per code. Look at plan for details -Provide full bearing for both plies of the porch (2)2x10 beam. Complete walls -Provide continuous sheathing for rear great room wall to top plate ( solid block & nail per code ) -Nail sheathing to studs at master bedroom/deck wall -Fb basement wall vertically at ten ft or less interval; fb both basement closet walls from fur down ceiling space and soffit ( seal gaps ) -Nail all deck joist hangers; lag ledger board to rim band; install middle support post for **DO NOT INSULATE NOT READY 7/14/21 : DO NOT INSULATE 7/14/21
Driveway Inspection Partial 8/12/2021 8/12/2021 08/12/2021
Misc
Informational
08/12/2021
Forms were placed and aggregate was present and compacted. They also need to patch chipped curbing. RP 8-12-21
Driveway Inspection Passed 8/20/2021 8/20/2021 08/20/2021
Misc
Informational
08/12/2021
Forms were placed and aggregate was present and compacted. They also need to patch chipped curbing. RP 8-12-21
Misc
Informational
08/20/2021
Finished driveway meets LS and ADA specs. RP 8-20-21
Sidewalk Inspection Partial 10/7/2021 10/7/2021 10/07/2021
Misc
Informational
10/07/2021
10:25 10-7-21 AM Forms are in place and aggregate is present and compacted
Occupancy Inspection - Codes Residential Failed 10/12/2021 10/12/2021
Misc
Corrective Action Required
10/12/2021
- exterior incomplete, missing stuco at deck. Open box at deck outlet. - Open electrical box ceiling of entry. -missing joist hanger nails at deck. - secure deck post to post anchor. - attic acces in garage is 1/2 rock provide 5/8" rock, leave open for inspection. -breaker 11 on main panel will not stay open. - Pay fees - sod, final grade, check water meter, splachblocks. - no sidewalk. - garage step over 3/8 difference at top step.
Sidewalk Inspection Passed 10/15/2021 10/15/2021 10/12/2021
Misc
Informational
10/07/2021
10:25 10-7-21 AM Forms are in place and aggregate is present and compacted
Misc
Informational
10/12/2021
Sidewalk looks good and meets all ADA specs
Occupancy Inspection - Codes Residential Failed 10/21/2021 10/21/2021 10/21/2021
Misc
Corrective Action Required
10/12/2021
- sod, final grade, check water meter, splachblocks. - no sidewalk.
Occupancy Inspection - Codes Residential Temporary C of O 10/22/2021 10/22/2021
Misc
Corrective Action Required
10/21/2021
- sod, final grade, check water meter, splachblocks. - no sidewalk. on west side of drive to lot line. check all exterior items at re-inspection 30 day tco
Plot Plan Inspection Passed 11/30/2021 11/30/2021
Occupancy Inspection - Codes Residential Temporary C of O 11/30/2021 11/30/2021
Misc
Corrective Action Required
10/22/2021
- no sidewalk. on west side of drive to lot line. check all exterior items at re-inspection 60 day tco
Occupancy Inspection - Codes Residential Full C of O 12/8/2021 12/8/2021 12/08/2021
Misc
Resolved
12/08/2021
- no sidewalk. on west side of drive to lot line. check all exterior items at re-inspection 60 day tco
Documents & Images
Date Uploaded File Type Document Name
12/01/2020 Application Form W1 #17 - Permit App
12/03/2020 17 WOODSIDE RIDGE ROOF LAYOUT
12/03/2020 W1 #17 - Palermo - Mediterranean - Sheets- signed
12/03/2020 LOT 17 FINAL
12/03/2020 2544696 RF SEAL 11242020
12/09/2020 Drawing APPROVED TRUSS LAYOUT
12/09/2020 Specifications APPROVED TRUSS PACKAGE
12/10/2020 Plans APPROVED HOUSE PLAN
12/21/2020 Letter Codes Residential Plan Review
12/22/2020 Plot Plan approved plot plan
12/22/2020 Receipt Receipt for transaction:2020-008169
12/22/2020 Letter DS Building Permit
03/02/2021 Letter INSPECTION SUMMARY
03/02/2021 Letter INSPECTION SUMMARY
03/02/2021 Letter INSPECTION SUMMARY
03/02/2021 Letter INSPECTION SUMMARY
03/04/2021 Letter INSPECTION SUMMARY
03/16/2021 Letter INSPECTION SUMMARY
03/16/2021 Letter INSPECTION SUMMARY
03/23/2021 W1-17 Woodside Ridge Footing Inspection
03/24/2021 Letter INSPECTION SUMMARY
05/05/2021 Letter INSPECTION SUMMARY
06/08/2021 Letter INSPECTION SUMMARY
06/08/2021 Letter INSPECTION SUMMARY
06/17/2021 Letter INSPECTION SUMMARY
06/17/2021 Letter INSPECTION SUMMARY
06/17/2021 Letter INSPECTION SUMMARY
06/17/2021 Letter INSPECTION SUMMARY
06/28/2021 Letter INSPECTION SUMMARY
06/28/2021 Letter INSPECTION SUMMARY
06/28/2021 Letter INSPECTION SUMMARY
06/28/2021 Letter INSPECTION SUMMARY
06/28/2021 Letter INSPECTION SUMMARY
06/28/2021 Letter INSPECTION SUMMARY
06/30/2021 Letter INSPECTION SUMMARY
06/30/2021 Letter INSPECTION SUMMARY
07/12/2021 Letter INSPECTION SUMMARY
07/16/2021 Letter INSPECTION SUMMARY
07/16/2021 Letter INSPECTION SUMMARY
07/21/2021 Letter INSPECTION SUMMARY
08/12/2021 Letter INSPECTION SUMMARY
08/20/2021 Letter INSPECTION SUMMARY
10/07/2021 Letter INSPECTION SUMMARY
10/12/2021 Letter INSPECTION SUMMARY
10/12/2021 Letter INSPECTION SUMMARY
10/12/2021 Letter INSPECTION SUMMARY
10/12/2021 Receipt Receipt for transaction:2021-007938
10/21/2021 Letter INSPECTION SUMMARY
10/22/2021 Letter Codes Temporary Certificate of Occupancy
11/30/2021 Letter INSPECTION SUMMARY
11/30/2021 Letter FW External TCO extension 2037 ASSHURST
11/30/2021 Letter Codes Temporary Certificate of Occupancy
12/08/2021 Letter Codes Final Certificate of Occupancy
12/08/2021 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home