Permit Application Status

PRRES20204436


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20204436
Building Permit - Residential
Certificate of Occupancy
CMH PARKS INC
NEW SINGLE FAMILY
NEW HOUSE - UNFINISHED BASEMENT - COVERED DECK
11/23/2020
12/01/2020
05/23/2021
09/17/2021
Locations
Contacts
CMH PARKS INC, Address:5000 CLAYTON RD  
CLAYTON PROPERTIES GROUP, INC, Address:10450 Holmes Rd Suite 100, Phone:(816) 246-6700  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
RYAN@SUMMITHOMESKC.COM  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 12/03/2020 12/01/2020
Kim Brennan
Drainage swales/berms
Corrective Action Required
12/01/2020

Drainage swales/berms: provide cross-section elevations as required to conform to the accepted "As graded" Master Drainge Plan (MDP), include cross-section detail from MDP.
Residential Plan Review Approved 12/03/2020 12/01/2020
Kim Brennan
Plot Plan Review Rejected 11/30/2020 11/24/2020
Kim Brennan
Drainage swales/berms
Corrective Action Required
11/24/2020

Drainage swales/berms: provide cross-section elevations as required to conform to the accepted "As graded" Master Drainge Plan (MDP), include cross-section detail from MDP.
Residential Plan Review Approved 11/30/2020 11/24/2020
Kim Brennan
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee New Single Family $1,291.96 $1,291.96 Paid 12/01/2020
Right of Way Permit Fee $80.00 $80.00 Paid 12/01/2020
Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 12/01/2020
8331507-Sewer Connection Fee $630.00 $630.00 Paid 12/01/2020
Water Tap Fee $3,581.00 $3,581.00 Paid 12/01/2020
Water Meter Fee $455.54 $455.54 Paid 12/01/2020
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Sewer Service Inspection - R Passed 1/26/2021 (Ready Now) 1/26/2021 01/26/2021
Water Service Inspection - R Passed 1/28/2021 (2:00) 1/28/2021 01/28/2021
Underslab Plumbing Inspection - Residential Failed 2/1/2021 2/1/2021 02/01/2021
Misc
Corrective Action Required
02/01/2021
-POST ADDRESS -RE ESTABLISH AND MAINTAIN EROSION CONTROL ON LOT, CLEAN MUD FROM STREET
Erosion Control Inspection Residential Failed 2/1/2021 2/1/2021 02/01/2021
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
02/01/2021
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. -RE ESTABLISH AND MAINTAIN EROSION CONTROL ON LOT, CLEAN MUD FROM STREET
Underslab Plumbing Inspection - Residential Passed 2/3/2021 2/3/2021 02/03/2021
Misc
Resolved
02/03/2021
All Rough Inspection - Residential Failed 5/4/2021 5/4/2021 05/04/2021
Misc
Corrective Action Required
05/04/2021
-seal all top plate penetrations throughout -lumber in contact with concrete must be pressure treated - see garage -pan off cantilever in garage -2X at furred down in garage 3’ or more must be connected to the floor joists to support the ceiling load -Fireblock HVAV/DWV chase at garage -Install boot seals at all roof penetrations -Fireblock bump out at garage wall sgl car garage -Garage PFH panel splices shall occur over and be nailed to common blocking within the middle 24” of the portal, one row 3” oc nailing required in each panel edge -Secure all vertical DWV 2” or less at mid point -Fireblock deadspace, E side of fridge 1st floor -Fireblock vertical to horizontal at chase in living room at windows 1st floor -All truss hangers per plans -Attic access garage per plans -Top plate short at bed#4 2nd floor, dbl girder truss not full bearing on top plate -Bocca protection plate at DWV bottom plate master bed -All truss lateral bracing per plans -(4) 2x4 stud packs at all girder truss ends per plans -Properly support stair landings -Anchor bolts required within 12” of plate break in basement -Insulate first, then solid block at cantilevers -3” SCH column at pier location “C”, W8x10 steel beam as shown on plans -Nail exterior sheathing per plans, 6” edge, 12” field *deck incomplete at time of rough in*
Gas Service Inspection - Residential Passed 5/13/2021 5/13/2021 05/13/2021
Electrical Service Inspection Passed 5/13/2021 5/13/2021 05/13/2021
All Rough Inspection - Residential Failed 5/13/2021 5/13/2021 05/13/2021
Misc
Corrective Action Required
05/04/2021
-lumber in contact with concrete must be pressure treated - see garage -pan off cantilever in garage - Seal Fireblock HVAC/DWV chase at garage -Fireblock bump out at garage wall sgl car garage -Garage PFH panel splices shall occur over and be nailed to common blocking within the middle 24” of the portal, one row 3” oc nailing required in each panel edge -Fireblock deadspace, E side of fridge 1st floor -Fireblock vertical to horizontal at chase in living room at windows 1st floor-seal gaps -All truss hangers per plans- missingTJC37at J1 covered porch, H2.5 SW garage trusses -Top plate short at bed#4 2nd floor, dbl girder truss not full bearing on top plate -Bocca protection plate at DWV bottom plate master bed -Properly support stair landings -Nail exterior sheathing per plans, 6” edge, 12” field -Provide (2) 1/2" through bolts at post/ beam connections -Support both plies of double end joists
All Rough Inspection - Residential Failed 5/20/2021 5/20/2021 05/20/2021
Misc
Corrective Action Required
05/13/2021
- Seal Fireblock HVAC/DWV chase at garage
All Rough Inspection - Residential Passed 5/21/2021 5/21/2021 05/21/2021
Misc
Resolved
05/21/2021
Occupancy Inspection - Codes Residential Failed 8/10/2021 8/10/2021 08/10/2021
Misc
Corrective Action Required
08/10/2021
-Upload footing inspection report to permit -Maintain erosion control on lot, protect swale and storm inlet at rear of lot -Submit as graded plot plan for review and approval -Final grade -Sod -Splash blocks at downspouts and sump pump -complete stone/siding front porch and garage exterior -max 4” sphere between spindles at covered porch -security screws at back door -install fixtures or plate at boxes above kitchen island -dishwasher must be GFCI protected -Install fixture or plate at box above front entry -Install toilet or cap open flange at 2nd floor bath -Install light fixtures at master bath vanity -Install handrail basement stairs -AFCI protection required at washer circuit -GFCI protection required at washer circuit
Erosion Control Inspection Residential Failed 8/10/2021 8/10/2021 08/10/2021
DCM2 ESC DEFICIENT INSTALLATION
Resolved
08/10/2021
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. -RE ESTABLISH AND MAINTAIN EROSION CONTROL ON LOT, CLEAN MUD FROM STREET
Misc
Corrective Action Required
08/10/2021
ADDRESS EROSION CONTROL ON LOT, REQUIRED UNTIL SOD IS PLACED. PROTECT SWALE AND STORM INLET AT REAR OF LOT
Footing Inspection - Residential Passed 8/12/2021 8/12/2021 08/12/2021
Misc
Informational
08/12/2021
APPROVED PER BRADLEY HUXOL 12/20/20
Occupancy Inspection - Codes Residential Failed 8/12/2021 8/12/2021 08/12/2021
Misc
Corrective Action Required
08/10/2021
-Maintain erosion control on lot, protect swale and storm inlet at rear of lot -Submit as graded plot plan for review and approval -Final grade -Sod -Splash blocks at downspouts and sump pump -complete stone/siding front porch and garage exterior -max 4” sphere between spindles at covered porch -security screws at back door -install fixtures or plate at boxes above kitchen island -dishwasher must be GFCI protected -Install fixture or plate at box above front entry -Install toilet or cap open flange at 2nd floor bath -Install light fixtures at master bath vanity -Install handrail basement stairs -AFCI protection required at washer circuit -GFCI protection required at washer circuit
Plot Plan Inspection Passed 8/20/2021 08/20/2021
Occupancy Inspection - Codes Residential Temporary C of O 8/25/2021 8/25/2021 08/25/2021
Misc
Corrective Action Required
08/12/2021
TCO until 9-22-21 -Obtain lawn irrigation permit and backflow certification -max 4” sphere between spindles at covered porch-secure spindles at bottom -Seal exterior penetration by AC unit -Secure sump discharge -1/2" through bolts required at deck post to beam connections- currently not 1/2" and not tight -Provide proper hanger at end joist at east -Clean trash, debris and rocks from swale and continue vegetation-Protect inlet until complete
Erosion Control Inspection Residential Passed 09/08/2021
Misc
Resolved
09/08/2021
Occupancy Inspection - Codes Residential Failed 9/8/2021 9/8/2021 09/08/2021
Misc
Corrective Action Required
08/25/2021
TCO until 9-22-21 -Final driveway and sidewalk inspections required, contact development services to schedule -Secure sump discharge-heel and discharge line 7” above grade, not supported -1/2" through bolts required at deck post to beam connections- currently not 1/2" and not tight
Sidewalk Inspection Passed 7/6/2021 09/08/2021
Misc
Informational
07/06/2021
Sidewalk - forms and materials passed pre-inspection.
Misc
Informational
09/08/2021
On 9-08-2020. I performed a visual sidewalk inspection and found sidewalk finish passes inspection.
Driveway Inspection Passed 7/6/2021 09/08/2021
Misc
Informational
07/06/2021
John M. Jackson 7/6/21 Tuesday Driveway - forms and materials passed pre-inspection.
Misc
Informational
09/08/2021
On Wednesday, 9-08-2020. I performed a visual driveway inspection and found the concrete finish passes inspection.
Occupancy Inspection - Codes Residential Full C of O 9/17/2021 9/17/2021 09/17/2021
Misc
Resolved
09/17/2021
Documents & Images
Date Uploaded File Type Document Name
11/23/2020 Application Form Permit Application and license tax form
11/24/2020 Approved Plans Approved Drawings
11/24/2020 Approved Plans Approved Truss Layout
11/24/2020 Approved Plans Approved Truss Package
11/24/2020 Letter Codes Residential Plan Review
12/01/2020 Receipt Receipt for transaction:2020-007778
12/01/2020 Letter DS Building Permit
01/26/2021 Letter INSPECTION SUMMARY
01/28/2021 Letter INSPECTION SUMMARY
02/01/2021 Letter INSPECTION SUMMARY
02/01/2021 Letter INSPECTION SUMMARY
02/03/2021 Letter INSPECTION SUMMARY
05/04/2021 Letter INSPECTION SUMMARY
05/13/2021 Letter INSPECTION SUMMARY
05/13/2021 Letter INSPECTION SUMMARY
05/13/2021 Letter INSPECTION SUMMARY
05/20/2021 Letter INSPECTION SUMMARY
05/21/2021 Letter INSPECTION SUMMARY
07/06/2021 Letter INSPECTION SUMMARY
07/06/2021 Letter INSPECTION SUMMARY
08/10/2021 Letter INSPECTION SUMMARY
08/10/2021 Letter INSPECTION SUMMARY
08/11/2021 Lot 34 Hawthorne Ridge footing inspection
08/12/2021 Letter INSPECTION SUMMARY
08/12/2021 Letter INSPECTION SUMMARY
08/19/2021 Plot Plan approved as graded plot plan
08/20/2021 Letter INSPECTION SUMMARY
08/25/2021 Letter Codes Temporary Certificate of Occupancy
08/25/2021 34 Hawthorne Ridge deck post letter
09/08/2021 Letter INSPECTION SUMMARY
09/08/2021 Letter INSPECTION SUMMARY
09/08/2021 Letter INSPECTION SUMMARY
09/08/2021 Letter INSPECTION SUMMARY
09/15/2021 Letter INSPECTION SUMMARY
09/15/2021 Letter INSPECTION SUMMARY
09/17/2021 Letter Field Certificate of Occupancy
09/17/2021 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home