Permit Application Status

PRRES20204172


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20204172
Building Permit - Residential
Certificate of Occupancy
NLV PERGOLA PARK LLC
NEW SINGLE FAMILY
NEW HOUSE - FINISHED BASEMENT - COVERED DECK SUSPENDED SLAB
11/04/2020
11/16/2020
05/08/2021
10/25/2022
Locations
Contacts
NLV PERGOLA PARK LLC, Address:3152 SW GRANDSTAND CIR  
BELLAH HOMES LLC, Address:P O BOX 346, Phone:(816) 697-2870  
A & D HEATING AND COOLING INC, Address:2006 W MAIN ST, Phone:(816) 537-7952  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
TRI-COUNTY PLUMBING LLC, Address:PO BOX 234, Phone:(816) 720-3222  
PAUL@BELLAHHOMES.COM  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 11/17/2020 11/13/2020
Kim Brennan
Residential Plan Review Approved 11/17/2020 11/13/2020
Kim Brennan
07 Identify emergency escape openings from bedrooms
Corrective Action Required
11/13/2020

Identify emergency escape openings from bedrooms and basement(s). (IRC Section R310 as amended per Ordinance) Not identified in master bedroom
Misc
Corrective Action Required
11/13/2020

The address on the plans show 3201 SW Pergola Park Dr., and it should be 307 SW Pergola Park Dr.
Plot Plan Review Approved 11/06/2020 11/11/2020
Kim Brennan
Deck location
Corrective Action Required
11/09/2020

Deck location, with dimensions to property lines must be provided on the plot plan.
Residential Plan Review Rejected 11/06/2020 11/09/2020
Kim Brennan
07 Identify emergency escape openings from bedrooms
Corrective Action Required
11/04/2020

Identify emergency escape openings from bedrooms and basement(s). (IRC Section R310 as amended per Ordinance) Not identified in master bedroom
Misc
Corrective Action Required
11/09/2020

The address on the plans show 3201 SW Pergola Park Dr., and it should be 307 SW Pergola Park Dr.
Planning Review (RES) Approved 11/11/2020 11/09/2020
Shannon McGuire
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $1,608.23 $1,608.23 Paid 11/16/2020
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 11/16/2020
7232302-Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 11/06/2020
$1,077.12
8331507-Sewer Connection Fee $690.00 $690.00 Paid 11/16/2020
8331401-Water Tap Fee $3,581.00 $3,581.00 Paid 11/16/2020
8350015-Water Meter Fee $455.54 $455.54 Paid 11/16/2020
7232302-New Longview Road and Bridge Escrow $1,077.12 $1,077.12 Paid 11/16/2020
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Erosion Control Inspection Residential Failed 01/08/2021
Misc
Corrective Action Required
01/08/2021
Immediate Street clean up required. No further inspections until issue is resolved
Miscellaneous Inspection Failed 01/08/2021
Misc
Corrective Action Required
01/08/2021
Post site address
Footing Inspection - Residential Passed 1/8/2021 01/08/2021
Erosion Control Inspection Residential Failed 01/12/2021
Misc
Corrective Action Required
01/08/2021
Immediate Street clean up required. No further inspections until issue is resolved. No action taken from 1/8/21 report
Sewer Service Inspection - R Passed 1/22/2021 (1:00) 1/22/2021 01/22/2021
Water Service Inspection - R Partial 1/27/2021 (10:00) 1/27/2021 01/22/2021
Misc
Informational
01/22/2021
Partial approval from structure to metallic connection customer side of meter
Water Service Inspection - R Passed 01/27/2021
Misc
Resolved
01/27/2021
Partial approval from structure to metallic connection customer side of meter
Underslab Plumbing Inspection - Residential Failed 2/2/2021 2/2/2021 02/02/2021
Misc
Corrective Action Required
02/02/2021
Protect water service at concrete floor penetration
Erosion Control Inspection Residential Failed 02/02/2021
Misc
Corrective Action Required
01/12/2021
-Immediate Street clean up required -Provide and maintain gravel filter -No further inspections until issues are resolved.
Erosion Control Inspection Residential Failed 02/04/2021
Misc
Corrective Action Required
02/02/2021
-Immediate Street clean up required, Stop work order will be issued in 48 hours if not resolved -Provide and maintain gravel filter -No further inspections
Underslab Plumbing Inspection - Residential Passed 2/22/2021 2/22/2021 02/22/2021
Misc
Resolved
02/22/2021
Protect water service at concrete floor penetration
Erosion Control Inspection Residential Passed 03/03/2021
Misc
Resolved
03/03/2021
-Immediate Street clean up required, Stop work order will be issued in 48 hours if not resolved -Provide and maintain gravel filter -No further inspections
Miscellaneous Inspection Passed 03/03/2021
Misc
Resolved
03/03/2021
Post site address
Gas Service Inspection - Residential Passed 8/19/2021 8/19/2021 08/19/2021
Electrical Service Inspection Passed 8/19/2021 8/19/2021 08/19/2021
All Rough Inspection - Residential Failed 8/19/2021 8/19/2021 08/19/2021
Misc
Corrective Action Required
08/19/2021
-Provide attic access to all roof spaces larger than 30 sq ft -Support hip rafters at ridge above garage -Install collar ties near ridge per code -Anchor garage sill plates within 12” of breaks -Fb garage plumbing chase from joist space and half bath ceiling space; Fb wall adjacent to refrigerator from joist space -Provide R-13 at garage/pantry chase wall -Pan off return air from pantry chase -Provide full support for double joist at garage/mud wall -Install joist hangers at I beam attachments above kitchen -Provide a wall receptacle within 6 ft of end of kitchen countertop. FYI: countertop receptacle doesn’t count -All windows larger than 9 sq ft and less than 18” above finish floor shall be safety tempered glass windows -Support ridge beam to rear dining wall; provide collar ties at ridge beam -Install 4 stud support for lvl beam at rear dining -Install 3 stud support for deck roof beam at rear dining -Provide full support for 4x joist at rear great room wall at shelf -Install fireplace; fb fireplace space -Toe-nail all joists to wall top plates -Install joist hangers at beam connections throughout -Provide full support for 4x beam at front bedroom both at exterior wall and at bedroom/toilet wall -Over notched ceiling joist above master closet -Support hip rafter beam above master bathroom/closet doorway -Provide 3 stud support for lvl beam at master bathroom sink wall; brace end of beam from rotation -Protect plumbing at master bathroom/closet bottom wall plate with BOCA plate -Support hip rafter beam above master bedroom at uppermost end -Brace end of lvl beam above master bedroom from rotation -Have engineer address support for master bedroom ceiling dead load supported by rafters -Provide master bedroom wall receptacle within 6 ft of deck door -Master bedroom deck door: security-block 3 stud spaces out; fill in gap at each hinge and at strike plate side from 12” above to 12” below dead bolt strike plate -Complete return air ducting to bedroom 4 -Brace ceiling joists above bedroom 4 -Provide wall receptacle spacing per code at bedroom 2 -OMG provide 3 stud support for ceiling beam outside 2nd fl bedrooms -Install rafter tie at highest ridge above stair -Support hip rafters above observatory room, play nook, and launch pad -Provide roof support purlins per plan -Fb basement wall space vertically every ten ft or less -Provide direct stud support underneath joists at curved stair wall -Provide combustion air openings per code once the spec for the instant water heater is known -Staple wiring min 1.25” from the wood surface at rear basement recreation room wall -Complete all trades for basement -Anchor basement sill plates per code -Support (2)2x10 joist at stair wall near light switch -Dryer duct length exceed limit. **Too many deficiencies. This is not a complete list. **Do not insulate **Master bathroom shower valve receptacle outlet shall be accessible
All Rough Inspection - Residential Failed 8/24/2021 8/24/2021 08/24/2021
Misc
Corrective Action Required
08/19/2021
-Restore erosion contrlol at back of lot before any further inspections -Install collar ties and rafter ties per code at dining per figure R802.4.5 -Anchor garage sill plates within 12” of breaks -Fb half bath ceiling space at entry wall and seal dwv penetration -Fb dead space at stairwell -Seal all through floor penetrations at dead space by garage/pantry, fridge, etc. -Provide a wall receptacle within 6 ft of end of kitchen countertop. FYI: countertop receptacle doesn’t count -All windows larger than 9 sq ft and less than 18” above finish floor shall be safety tempered glass windows -Install 3 stud support for deck roof beam at rear master bed -Install fireplace; fb fireplace space-seal gaps between plates -Seal top plate penetration at garage entry -Have engineer address support for master bedroom ceiling dead load supported by rafters -Address ceiling beam outside 2nd fl bedrooms only 1" of bearing outside of bed 3 -Provide bonding screw and jumper at light outside of bed 4 -Provide roof support purlins per plan-2x6 purlin at master bed -Fb basement wall space vertically every ten ft or less-Seal gaps and penetrations in fireblocking at tops of furout walls and 10' horizontal fb at wet bar area -Provide direct stud support for stair framing -Provide combustion air openings per code once the spec for the instant water heater is known -Staple wiring min 1.25” from the wood surface at rear basement recreation room wall -Complete all trades for basement-office and bath to remain unfinished -Anchor basement sill plates per code -Support (2)2x10 joist at stair wall near light switch-second joist is only supported by cripple stud at doorway and no structural header -Dryer duct length exceed limit. -Seal penetrations in rim joist and beam pocket in garage -Nail rafter to joist connections at garage -Provide full support for double joist in office closet -Seal t-op plate penetration at bed 3 exterior -Seal bottom plate penetration at bed 4 doorway -Anchor steel column to floor at stairwell -Fireblock bottom of stairs at wall space -FB ceiling line in theater at finished spaces and closets -Identify ufer ground and gas bonding conductors at both ends **Deck framing incomplete at this time ***Master bathroom shower valve receptacle outlet shall be accessible
All Rough Inspection - Residential Passed 8/27/2021 8/27/2021 08/27/2021
Misc
Resolved
08/27/2021
-Restore erosion contrlol at back of lot before any further inspections -Install collar ties and rafter ties per code at dining per figure R802.4.5 -Anchor garage sill plates within 12” of breaks -Fb half bath ceiling space at entry wall and seal dwv penetration -Fb dead space at stairwell -Seal all through floor penetrations at dead space by garage/pantry, fridge, etc. -Provide a wall receptacle within 6 ft of end of kitchen countertop. FYI: countertop receptacle doesn’t count -All windows larger than 9 sq ft and less than 18” above finish floor shall be safety tempered glass windows -Install 3 stud support for deck roof beam at rear master bed -Install fireplace; fb fireplace space-seal gaps between plates -Seal top plate penetration at garage entry -Have engineer address support for master bedroom ceiling dead load supported by rafters -Address ceiling beam outside 2nd fl bedrooms only 1" of bearing outside of bed 3 -Provide bonding screw and jumper at light outside of bed 4 -Provide roof support purlins per plan-2x6 purlin at master bed -Fb basement wall space vertically every ten ft or less-Seal gaps and penetrations in fireblocking at tops of furout walls and 10' horizontal fb at wet bar area -Provide direct stud support for stair framing -Provide combustion air openings per code once the spec for the instant water heater is known -Staple wiring min 1.25” from the wood surface at rear basement recreation room wall -Complete all trades for basement-office and bath to remain unfinished -Anchor basement sill plates per code -Support (2)2x10 joist at stair wall near light switch-second joist is only supported by cripple stud at doorway and no structural header -Dryer duct length exceed limit. -Seal penetrations in rim joist and beam pocket in garage -Nail rafter to joist connections at garage -Provide full support for double joist in office closet -Seal t-op plate penetration at bed 3 exterior -Seal bottom plate penetration at bed 4 doorway -Anchor steel column to floor at stairwell -Fireblock bottom of stairs at wall space -FB ceiling line in theater at finished spaces and closets -Identify ufer ground and gas bonding conductors at both ends **Deck framing incomplete at this time ***Master bathroom shower valve receptacle outlet shall be accessible
Driveway Inspection Partial 10/25/2021 10/25/2021 10/25/2021
Misc
Informational
10/25/2021
Forms were placed and aggregate was present and compacted. RP 10-25-21
Driveway Inspection Passed 10/29/2021 10/29/2021 10/27/2021
Misc
Informational
10/25/2021
Forms were placed and aggregate was present and compacted. RP 10-25-21
Misc
Informational
10/27/2021
Driveway meets LS and Ada specs. 10/27 ES
Sidewalk Inspection Partial 12/13/2021 12/13/2021 12/13/2021
Misc
Informational
12/13/2021
Sidewalk is framed up and has aggregate in place and compacted. 12/13 ES
Sidewalk Inspection Passed 12/17/2021 12/17/2021 12/17/2021
Misc
Informational
12/13/2021
Sidewalk is framed up and has aggregate in place and compacted. 12/13 ES
Misc
Informational
12/17/2021
Sidewalk meets LS and Ada spec. 12/17/21
Occupancy Inspection - Codes Residential Failed 1/18/2022 1/18/2022 01/18/2022
Misc
Corrective Action Required
08/27/2021
-All windows larger than 9 sq ft and less than 18” above finish floor shall be safety tempered glass windows -Deck not inspected at rough in
Miscellaneous Correction
Corrective Action Required
01/18/2022
- Lock and secondary lock on front door - Nail hangers on deck joist - Provide 2 1/2” through bolts for all post to beam connections at deck - Final grading and sod - Garage door shall be self closing - Address water meter height to grade - remove dust covering from smoke detector top of stairs - provide pier inspection for deck
Piers/Caissons Inspection - Residential Passed 01/20/2022
Occupancy Inspection - Codes Residential Temporary C of O 1/20/2022 1/20/2022 01/20/2022
Misc
Resolved
01/20/2022
Miscellaneous Correction
Resolved
10/25/2022
Occupancy Inspection - Codes Residential Full C of O 10/25/2022 10/25/2022 10/25/2022
Miscellaneous Correction
Resolved
10/25/2022
Documents & Images
Date Uploaded File Type Document Name
11/04/2020 Application Form Permit Application and license tax form
11/04/2020 BHPPergolaOakbrookLot109Sealed
11/09/2020 Letter Codes Residential Plan Review
11/11/2020 Plot Plan Approved Plot Plan
11/13/2020 Approved Plans Approved Drawings
11/16/2020 Letter DS Building Permit
11/16/2020 Receipt Receipt for transaction: 2020-007569
01/08/2021 Letter INSPECTION SUMMARY
01/08/2021 Letter INSPECTION SUMMARY
01/08/2021 M L Crose 3207 SW Pergola Park Lot 109 LSMO Bellah Homes 3rd Party Footing Inspection Report 1-07-21
01/08/2021 Letter INSPECTION SUMMARY
01/12/2021 Letter INSPECTION SUMMARY
01/22/2021 Letter INSPECTION SUMMARY
01/22/2021 Letter INSPECTION SUMMARY
01/27/2021 Letter INSPECTION SUMMARY
02/02/2021 Letter INSPECTION SUMMARY
02/02/2021 Letter INSPECTION SUMMARY
02/04/2021 Letter INSPECTION SUMMARY
02/22/2021 Letter INSPECTION SUMMARY
03/03/2021 Letter INSPECTION SUMMARY
03/03/2021 Letter INSPECTION SUMMARY
08/19/2021 Letter INSPECTION SUMMARY
08/19/2021 Letter INSPECTION SUMMARY
08/19/2021 Letter INSPECTION SUMMARY
08/24/2021 Letter INSPECTION SUMMARY
08/26/2021 3207 SW Pergola Park Drive - Structural Letter (August 26, 2021)[2455]
08/27/2021 Letter INSPECTION SUMMARY
10/25/2021 Letter INSPECTION SUMMARY
10/27/2021 Letter INSPECTION SUMMARY
12/13/2021 Letter INSPECTION SUMMARY
12/17/2021 Letter INSPECTION SUMMARY
01/18/2022 Letter INSPECTION SUMMARY
01/20/2022 Letter INSPECTION SUMMARY
01/20/2022 Letter Codes Temporary Certificate of Occupancy
06/09/2022 Letter Codes 140 Day Letter
10/25/2022 Letter Field Certificate of Occupancy
10/25/2022 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home