PRRES20202810


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20202810
Building Permit - Residential
Certificate of Occupancy
CMH PARKS INC
NEW SINGLE FAMILY
NEW HOUSE - UNFINISHED BASEMENT - COVERED DECK
09/03/2020
09/10/2020
05/27/2021
Locations
Contacts
CMH PARKS INC, Address:5000 CLAYTON RD  
CLAYTON PROPERTIES GROUP, INC, Address:10450 Holmes Rd Suite 100, Phone:(816) 246-6700  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
RYAN@SUMMITHOMESKC.COM  
Reviews
Review Type Outcome Est. Completion Date Completed
Planning Review (RES) Approved 09/09/2020 09/09/2020
Hector Soto Jr.
Plot Plan Review Approved 09/09/2020 09/09/2020
Kim Brennan
Basement elevation
Corrective Action Required
09/04/2020

The Basement floor elevation and basement type (e.g. full/standard, daylight, walk-out, etc.) The MDP on this lot calls for a daylight basement and not a walk-out. Please advise.
Residential Plan Review Approved 09/09/2020 09/04/2020
Kim Brennan
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee New Single Family $1,412.44 $1,412.44 Paid 09/10/2020
Right of Way Permit Fee $80.00 $80.00 Paid 09/10/2020
Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 09/10/2020
8331507-Sewer Connection Fee $600.00 $600.00 Paid 09/10/2020
Water Tap Fee $3,581.00 $3,581.00 Paid 09/10/2020
Water Meter Fee $455.54 $455.54 Paid 09/10/2020
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 10/15/2020 10/15/2020 10/15/2020
Underslab Plumbing Inspection - Residential Passed 11/16/2020 11/16/2020 11/16/2020
Erosion Control Inspection Residential Failed 01/22/2021
Misc
Corrective Action Required
01/22/2021
-Erosion control requires continuous maintenance. Repair damaged sections within two business days -immediate street cleanup required -maintain gravel filter -no further inspections until issues are resolved
Electrical Service Inspection Passed 1/22/2021 1/22/2021 01/22/2021
Gas Piping Inspection - Residential Passed 1/22/2021 1/22/2021 01/22/2021
Gas Service Inspection - Residential Passed 1/22/2021 1/22/2021 01/22/2021
All Rough Inspection - Residential Failed 1/22/2021 1/22/2021 01/22/2021
Misc
Corrective Action Required
01/22/2021
-Unable to verify Method PFH Exterior fastening requirements at portal opening -Two rows of 16D sinker nails 3” oc at portal opening top plate per plan, see section view of detail -Minimum 12” field 6” edge exterior sheathing fastening -12” oc fastening, stud to stud and abutting studs at intersecting braced walls -Maximum stud spacing of 16 inch OC for interior braced wall method LIB -Anchor bolt required within 12 inches of plate splice, garage (1) & basement (4) -Fireblock all through floor penetrations -Identify white insulated conductors to be used as current carrying conductors at both points of termination -Midpoint support of all vertical 2 inch and smaller DWV -Double top plate splice is required to offset minimum 24 inches, garage -Properly fireblock vertical to horizontal, Garage/dwelling separation wall chases and soffit -properly fireblock soffit to wall connection, Garage/dwelling separation wall -Provide studs at the end of top plate, garage/dwelling separation wall at bathroom wall intersection -Properly fireblock B vent penetration of wood fireblock, kitchen chase -Provide minimum 16g galvanized metal ties 1.5” wide at over bored top plates of interior load bearing walls. Fasten ties across and to the plate at each side of the opening with minimum 4-10dx1.5” at each side. The metal tie must extend a minimum of 6” past the opening. See figure R602.6.1 -Fasten headers to King studs per code -vertical/horizontal NM conductors parallel to framing members shall be installed and supported so that the nearest outside surface of the cable is not less than 1.25” from the nearest edge of the framing member. Vertical-kitchen, GR, bed 3. horizontal- Above linen closet 2nd floor hall -three bearing 2x4 each side under LVL header, door to deck -Properly fireblock vertical to horizontal, GR chase -Exterior Braced wall Method CS-PF exterior fastening per plan, GR exterior wall -three 2x4 per plan, between entry door and dining windows -Solid block between floor joists at cantilever, dining room -Rim board header ends or splices required to span minimum 6 inches past outer full height stud of opening, Above basement windows -Provide triple joist hanger at rim board header connection, above basement window -three 2x6 at basement windows per plan -Provide double studs under double floor Joists, basement -Address over bored floor joist, first floor framing DWV penetration in basement -Maintain clearance to combustibles per listing of flex flue connector at furnace -Complete bedroom 3 closet framing -Nail plate protection at conductor stud penetration. Bedroom 3 -Fireblock top plate penetration. bath 3 & laundry -Remove contamination from metallic lighting outlet box to ensure it is properly grounded, bath 3 and bath 1 -Complete plumbing installation, bath 2 -2x6 entry wall exterior sheathing edge is below top plate, 6” edge fastening required -Four studs under all girder truss bearing points -Deck- ledger attachment per code, post/beam connection per code, provide proper bearing for all joists at attachment to ledger/structure, secure posts to columns and columns to piers, complete guard rail installation at stairs
Sewer Service Inspection - R Passed 1/27/2021 (Ready Now) 1/27/2021 01/27/2021
Water Service Inspection - R Partial 1/27/2021 1/27/2021 01/27/2021
Misc
Informational
01/27/2021
-PARTIAL ON PEX FROM MID POINT FRONT YARD TO HOUSE ENTRANCE, OK TO COVER PORTION INSPECTED
Water Service Inspection - R Passed 1/28/2021 (1:00) 1/28/2021 01/28/2021
Misc
Resolved
01/28/2021
-PARTIAL ON PEX FROM MID POINT FRONT YARD TO HOUSE ENTRANCE, OK TO COVER PORTION INSPECTED
All Rough Inspection - Residential Failed 1/28/2021 1/28/2021 01/28/2021
Misc
Corrective Action Required
01/22/2021
-Unable to verify Method PFH Exterior fastening requirements at portal opening -Two rows of 16D sinker nails 3” oc at portal opening top plate per plan, see section view of detail -Minimum 12” field 6” edge exterior sheathing fastening -Maximum stud spacing of 16 inch OC for interior braced wall method LIB-upstairs -Fireblock all through floor penetrations-tub trap bath 2 -Identify white insulated conductors to be used as current carrying conductors at both points of termination -Properly fireblock vertical to horizontal, Garage/dwelling separation wall chases and soffit-seal gaps and penetrations -properly fireblock soffit to wall connection, Garage/dwelling separation wall -Provide studs at the end of top plate, garage/dwelling separation wall at bathroom wall intersection -Properly fireblock B vent penetration of wood fireblock, kitchen chase -Fasten headers to King studs per code -three bearing 2x4 each side under LVL header, door to deck -Properly fireblock vertical to horizontal, GR chase -Exterior Braced wall Method CS-PF exterior fastening per plan, GR exterior wall -three 2x4 per plan, between entry door and dining windows -Rim board header ends or splices required to span minimum 6 inches past outer full height stud of opening, Above basement windows -three 2x6 at basement windows per plan -Provide double studs under double floor Joists, basement -Address over bored floor joist, first floor framing DWV penetration in basement -Maintain clearance to combustibles per listing of flex flue connector at furnace -Fireblock top plate penetration. bath 3 & laundry-seal gaps -Deck- post/beam connection per code, provide proper bearing for all joists at attachment to ledger/structure
All Rough Inspection - Residential Failed 2/3/2021 2/3/2021 02/03/2021
Misc
Corrective Action Required
01/28/2021
-Properly fireblock vertical to horizontal, GR chase -Exterior Braced wall Method CS-PF (exterior fastening per plan), GR exterior wall -Rim board header ends or splices required to span minimum 6 inches past outer full height stud of opening, Above basement windows -Maintain clearance to combustibles per listing of flex flue connector at furnace -Deck- post/beam connection per code ***OK TO INSULATE***
All Rough Inspection - Residential Failed 2/5/2021 2/5/2021 02/05/2021
Misc
Corrective Action Required
02/03/2021
-Maintain clearance to combustibles per listing of flex flue connector at furnace ***OK TO INSULATE AND ROCK***
Sidewalk Inspection Partial 3/26/2021 3/26/2021 03/26/2021
Misc
Informational
03/26/2021
3-26-21 1:42pm The forms are set and the aggregate is compacted.
Misc
Informational
03/26/2021
3-26-21 1:42pm The forms are set and the aggregate is compacted.
Driveway Inspection Partial 3/26/2021 3/26/2021 03/26/2021
Misc
Informational
03/26/2021
3-26-21 1:44pm The forms are set and the aggregate is compacted. They are pouring curb in front of the driveway.
Sidewalk Inspection Passed 3/30/2021 3/30/2021 03/30/2021
Misc
Informational
03/26/2021
3-26-21 1:42pm The forms are set and the aggregate is compacted.
Misc
Informational
03/26/2021
3-26-21 1:42pm The forms are set and the aggregate is compacted.
Driveway Inspection Passed 3/30/2021 3/30/2021 03/30/2021
Misc
Informational
03/26/2021
3-26-21 1:44pm The forms are set and the aggregate is compacted. They are pouring curb in front of the driveway.
All Rough Inspection - Residential Passed 4/21/2021 4/21/2021 04/21/2021
Misc
Resolved
04/21/2021
Occupancy Inspection - Codes Residential Failed 4/21/2021 4/21/2021 04/21/2021
Misc
Corrective Action Required
04/21/2021
-final grade and sod -splash blocks at all sump pump and downspouts, minimum 36” discharge from foundation -provide landing at rear deck stairs, more than 7 3/4” from bottom rise -set sewer trace box at grade -Guardrail required at front porch, more than 30” from grade -Install kitchen faucet -Install kitchen hood, exposed NM at wall -Trim back carpet to edge of spark ring and set spark ring at 1st floor office floor receptacle -clip off set screw head on anti siphon at spigot on main water line in basement
Occupancy Inspection - Codes Residential Temporary C of O 4/28/2021 4/28/2021 04/28/2021
Misc
Corrective Action Required
04/21/2021
-final grade and sod -splash blocks at all sump pump and downspouts, minimum 36” discharge from foundation -set sewer trace box at grade -Guardrail required at front porch, more than 30” from grade **OK FOR TCO - TCO EXPIRES 5/14/21**
Occupancy Inspection - Codes Residential Temporary C of O 5/14/2021 5/14/2021 05/14/2021
Misc
Corrective Action Required
04/28/2021
-Guardrail required at front porch - R312.1.1 Guards shall be provided for those portions of open sided walking surfaces that are located more than 30" measured vertically to the floor or grade below at any point within 36" horizontally to the edge of the open side. **OK FOR TCO - TCO EXPIRES 5/28/21**
Erosion Control Inspection Residential Passed 05/27/2021
Misc
Resolved
05/27/2021
Plot Plan Inspection Passed 05/27/2021
Occupancy Inspection - Codes Residential Full C of O 5/27/2021 5/27/2021 05/27/2021
Documents & Images
Date Uploaded File Type Document Name
09/03/2020 Application Form Permit Application and license tax form
09/04/2020 Letter Codes Residential Plan Review
09/09/2020 Engineer Report/Study Letter approving walkout basement
09/09/2020 Plot Plan Approved Plot Plan
09/09/2020 Approved Plans Approved Truss Package
09/09/2020 Approved Plans Approved Truss Layout
09/10/2020 Approved Plans Approved Drawings
09/10/2020 Receipt Receipt for transaction:2020-006115
09/10/2020 Letter DS Building Permit
10/05/2020 17 Hawthorne Ridge Pier Plan-Final - Signed
10/12/2020 17 Hawthorne Ridge Pier Plan-Final - Signed
10/15/2020 Lot 17 Hawthorne Ridge Footing Inspection
10/15/2020 Letter INSPECTION SUMMARY
10/29/2020 Lot 17 Hawthorne Ridge Wall Inspection
11/16/2020 Letter INSPECTION SUMMARY
01/22/2021 Letter INSPECTION SUMMARY
01/22/2021 Letter INSPECTION SUMMARY
01/22/2021 Letter INSPECTION SUMMARY
01/22/2021 Letter INSPECTION SUMMARY
01/22/2021 Letter INSPECTION SUMMARY
01/25/2021 17 Hawthorne Ridge Hole in Floor Joist Letter
01/27/2021 Letter INSPECTION SUMMARY
01/27/2021 Letter INSPECTION SUMMARY
01/28/2021 Letter INSPECTION SUMMARY
01/28/2021 Letter INSPECTION SUMMARY
02/03/2021 Letter INSPECTION SUMMARY
02/03/2021 17 Hawthorne Basement Header Letter
02/05/2021 Letter INSPECTION SUMMARY
03/26/2021 Letter INSPECTION SUMMARY
03/26/2021 Letter INSPECTION SUMMARY
03/30/2021 Letter INSPECTION SUMMARY
03/30/2021 Letter INSPECTION SUMMARY
04/21/2021 Letter INSPECTION SUMMARY
04/21/2021 Letter INSPECTION SUMMARY
04/28/2021 Letter INSPECTION SUMMARY
04/28/2021 Letter Codes Temporary Certificate of Occupancy
04/28/2021 Letter INSPECTION SUMMARY
05/14/2021 Letter Codes Temporary Certificate of Occupancy
05/27/2021 Letter INSPECTION SUMMARY
05/27/2021 Letter INSPECTION SUMMARY
05/27/2021 Letter Field Certificate of Occupancy
05/27/2021 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home