Permit Application Status

PRRES20202276


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20202276
Building Permit - Residential
Certificate of Occupancy
SILVERSTONE DEVELOPMENT LLC
NEW SINGLE FAMILY
NEW HOUSE - FINISHED/UNFINISHED BASEMENT - COVERED PATIO CLOSED WITH OPEN VIOLATIONS OR EXCEEDED PERMIT LIMITS
08/12/2020
09/11/2020
02/27/2024
Locations
Contacts
SILVERSTONE DEVELOPMENT LLC, Address:PO BOX 346  
NICK ZVACEK CONSTRUCTION LLC, Address:1009 INDUSTRIAL DR, Phone:(816) 213-7204  
COMFORT SYSTEMS HTG/CLG, Address:128 W Markey Rd, Phone:(816) 322-1013  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
CENTURY PLUMBING, Address:14001 CENTURY LN, Phone:(816) 765-6066  
NZVACEK@GMAIL.COM  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 08/17/2020 08/18/2020
Kim Brennan
Basement egress
Corrective Action Required
08/13/2020

Basement egress location(s) and elevation of the lowest adjacent grade must be provided on the plot plan. Please provide the LAG for the egress location.
Property boundary
Corrective Action Required
08/13/2020

Property boundary distances and bearings, as shown on the recorded plat, must be provided on the plot plan. Please provide the bearings for the front and rear of the lot
Residential Plan Review Approved 08/17/2020 08/13/2020
Kim Brennan
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee New Single Family $1,257.93 $1,257.93 Paid 09/11/2020
Right of Way Permit Fee $80.00 $80.00 Paid 09/11/2020
Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 09/11/2020
8331507-Sewer Connection Fee $600.00 $600.00 Paid 09/11/2020
Water Tap Fee $3,581.00 $3,581.00 Paid 09/11/2020
Water Meter Fee $455.54 $455.54 Paid 09/11/2020
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 10/13/2020 (1:00) 10/13/2020 10/13/2020
Erosion Control Inspection Residential Failed 12/16/2020 12/16/2020
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
12/16/2020
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED.
Underslab Plumbing Inspection - Residential Passed 12/16/2020 12/16/2020 12/16/2020
Sewer Service Inspection - R Passed 3/5/2021 (1:15) 3/5/2021 03/05/2021
Water Service Inspection - R Partial 3/5/2021 (1:15) 3/5/2021 03/05/2021
Water Service Inspection - R Passed 3/9/2021 03/09/2021
Electrical Service Inspection Passed 3/23/2021 3/23/2021 03/23/2021
Gas Service Inspection - Residential Passed 3/23/2021 3/23/2021 03/23/2021
All Rough Inspection - Residential Failed 3/23/2021 3/23/2021 03/23/2021
Misc
Corrective Action Required
03/23/2021
FRAMING &ETC: -Provide flashing above window trim -Shim gaps at bottom of garage studs -Seams at the garage PFH walls must be within 24” of the mid-wall height, not near the bottom -Provide R-13 insulation at garage/closet return air wall -Install min two 1/2” anchors for garage steel column -Fb fireplace space from roof at back wall -Nail kitchen ceiling beams hangers to 18” lvl -Security blocking for deck door -Install hangers for ceiling beam connections to triple 2x12 beam above 2nd floor bathroom -Solid block underneath laundry wall (2)2x10 beam point loads to I beam below -Fb wall at I beam web; fb wall from fur down ceiling space -Blockings at cantilevered joists PLUMBING: -Protect water line at laundry/shower wall; DVW at master closet and shower walls. Use BOCA plates; at loft MECHANICAL: -Vent half bath fan **OK TO INSULATE
All Rough Inspection - Residential Failed 3/30/2021 3/30/2021 03/30/2021
Misc
Corrective Action Required
03/23/2021
FRAMING &ETC: -Provide flashing above window trim -Shim gaps at bottom of garage studs -Seams at the garage PFH walls must be within 24” of the mid-wall height, not near the bottom -Provide R-13 insulation at garage/closet return air wall -fb wall from fur down ceiling space **OK TO INSULATE
All Rough Inspection - Residential Failed 4/6/2021 4/6/2021 04/06/2021
Misc
Corrective Action Required
03/30/2021
-Shim gaps at bottom of garage studs -fb wall from fur down ceiling space at basement closet
All Rough Inspection - Residential Failed 4/14/2021 4/14/2021 04/14/2021
Misc
Corrective Action Required
04/06/2021
-Fb wall from fur down ceiling space at basement closet **not done. The fur out exterior wall is still open to the fur down ceiling space and the I beam web space **4/14-Re-inspection fee assessed
All Rough Inspection - Residential Passed 4/19/2021 4/19/2021 04/19/2021
Misc
Resolved
04/19/2021
-Fb wall from fur down ceiling space at basement closet **not done. The fur out exterior wall is still open to the fur down ceiling space and the I beam web space **4/14-Re-inspection fee assessed
Driveway Inspection Partial 6/1/2021 6/1/2021 06/01/2021
Misc
Informational
06/01/2021
Driveway - forms and materials passed pre-inspection.
Sidewalk Inspection Partial 6/1/2021 6/1/2021 06/01/2021
Misc
Informational
06/01/2021
Sidewalk - forms and materials passed pre-inspection.
Driveway Inspection Passed 6/3/2021 6/3/2021 06/04/2021
Misc
Informational
06/01/2021
Driveway - forms and materials passed pre-inspection.
Misc
Informational
06/04/2021
Driveway - passed final inspection.
Sidewalk Inspection Passed 6/3/2021 6/3/2021 06/04/2021
Misc
Informational
06/01/2021
Sidewalk - forms and materials passed pre-inspection.
Misc
Informational
06/04/2021
Sidewalk - passed final inspection. Note: Had to remind contractor (Roy) that white cure is to be used on sidewalk.
Occupancy Inspection - Codes Residential Failed 8/23/2021 8/23/2021 08/23/2021
Misc
Corrective Action Required
08/23/2021
**INSTALL EROSION CONTROL ALONG THE STREET UNTIL SODDING -Obtain lawn irrigation permit and submit the backflow test report to city -Final grade, sod, downspout and sump pump extensions -Fix flashing above north bedroom window. Bend flashing to drain -Provide min 6” clearance from same window trim to grade -Repair damaged yard of adjacent property -Piers not inspected by city. Expose support posts. Bottom trims must have min 2” clearance from concrete floor exposed to rainfall -Secure AC whip within 12” of disconnect -Seal above AC disconnect -Attic access above front bedroom closet not available -Provide 5/8” GB under garage boxed out wall -Support lawn irrigation pex line every 32” max -Secure steel column to I beam behind basement bathroom -Fb floor penetration at tub trap above service panel -Support furnace exhaust &intake pvc every 5 ft -Have engineer address misplaced I beam support column behind wet bar. Provide support pad below column
Piers/Caissons Inspection - Residential Failed 9/2/2021 09/02/2021
Misc
Corrective Action Required
09/02/2021
PIERS ALREADY POURED AND NOT INSPECTED BY CITY. HAVE ENGINEER APPROVE THEM
Piers/Caissons Inspection - Residential Passed 9/3/2021 09/03/2021
Misc
Resolved
09/03/2021
PIERS ALREADY POURED AND NOT INSPECTED BY CITY. HAVE ENGINEER APPROVE THEM
Occupancy Inspection - Codes Residential Failed 9/7/2021 09/07/2021
Misc
Corrective Action Required
08/23/2021
-Provide min 6” clearance from same window trim to grade -Anchor rear patio roof support walls to floor -Fb floor penetration at tub trap above service panel -Have engineer address misplaced I beam support column behind wet bar. Provide support pad below column
Occupancy Inspection - Codes Residential Temporary C of O 9/7/2021 9/7/2021 09/07/2021
Misc
Corrective Action Required
09/07/2021
-Provide min 6” clearance from same window trim to grade -Anchor rear patio roof support walls to floor
Documents & Images
Date Uploaded File Type Document Name
08/12/2020 Letter Permit Application
08/12/2020 Letter License Tax Application
08/13/2020 Drawing Approved Drawings
08/13/2020 Letter Codes Residential Plan Review
08/18/2020 Plot Plan Approved Plot Plan
09/11/2020 Receipt Receipt for transaction: 2020-006189
09/11/2020 Letter DS Building Permit
10/13/2020 Letter INSPECTION SUMMARY
12/16/2020 Letter INSPECTION SUMMARY
12/16/2020 Letter INSPECTION SUMMARY
03/05/2021 Letter INSPECTION SUMMARY
03/05/2021 Letter INSPECTION SUMMARY
03/09/2021 Letter INSPECTION SUMMARY
03/23/2021 Letter INSPECTION SUMMARY
03/23/2021 Letter INSPECTION SUMMARY
03/23/2021 Letter INSPECTION SUMMARY
03/30/2021 Letter INSPECTION SUMMARY
04/06/2021 Letter INSPECTION SUMMARY
04/14/2021 Letter INSPECTION SUMMARY
04/19/2021 Letter INSPECTION SUMMARY
06/01/2021 Letter INSPECTION SUMMARY
06/01/2021 Letter INSPECTION SUMMARY
06/01/2021 Letter INSPECTION SUMMARY
06/04/2021 Letter INSPECTION SUMMARY
06/04/2021 Letter INSPECTION SUMMARY
08/23/2021 Letter INSPECTION SUMMARY
09/02/2021 Letter INSPECTION SUMMARY
09/03/2021 Letter INSPECTION SUMMARY
09/07/2021 Letter INSPECTION SUMMARY
09/07/2021 Letter Codes Temporary Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home