Permit Application Status

PRRES20202107


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20202107
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - UNFINISHED BASEMENT - COVERED DECK STOP WORK ORDER generated on 02/24/2021 12:00 AM by username 'Patrick Schonfeldt'. STOP WORK ORDER removed on 04/02/2021 12:00 AM by username 'Patrick Schonfeldt'.
07/29/2020
07/29/2020
05/20/2021
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
DUSTIN@SUMMITHOMESKC.COM  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 07/31/2020 07/29/2020
Kim Brennan
Residential Plan Review Approved 07/31/2020 07/29/2020
Kim Brennan
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $1,227.59 $1,227.59 Paid 07/29/2020
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid 07/29/2020
8331401-Water Tap Fee $3,581.00 $3,581.00 Paid 07/29/2020
8350015-Water Meter Fee $455.54 $455.54 Paid 07/29/2020
8331504-EFHB Middle Big Creek, Full $636.12 $636.12 Paid 07/29/2020
8331507-Sewer Connection Fee $570.00 $570.00 Paid 07/29/2020
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 07/29/2020
9110080-3rd and Subsequent Inspection Fee (Per Hour) $250.00 $250.00 Paid 05/12/2021
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 05/12/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Miscellaneous Inspection Failed 8/26/2020 8/26/2020 08/26/2020
Misc
Corrective Action Required
08/26/2020
- HOUSE NOT READY FOR ALL ROUGH INSPECTION SCHEDULED 8/26 -
Footing Inspection - Residential Passed 9/14/2020 (1:00) 9/14/2020 09/14/2020
Underslab Plumbing Inspection - Residential Passed 10/6/2020 10/6/2020 10/06/2020
Piers/Caissons Inspection - Residential Passed 11/16/2020 (11:00) 11/16/2020 11/16/2020
All Rough Inspection - Residential Not Ready 1/4/2021 1/4/2021 01/04/2021
Misc
Corrective Action Required
01/04/2021
NO INSPECTION PERFORMED -NO CITY APPROVED HOUSE PLANS OR TRUSS PLANS ON SITE -
Electrical Service Inspection Passed 1/7/2021 1/7/2021 01/07/2021
Gas Piping Inspection - Residential Passed 1/7/2021 1/7/2021 01/07/2021
Gas Service Inspection - Residential Failed 1/7/2021 1/7/2021 01/07/2021
Misc
Corrective Action Required
01/07/2021
-GAS PRESSURE AT 8 PSI, MUST MAINTAIN 10 PSI FOR TEST
All Rough Inspection - Residential Failed 1/7/2021 01/07/2021
Misc
Corrective Action Required
01/04/2021
-Anchor bolts required within 12” of plate breaks in garage -Fireblock plumbing furred down at garage wall -Secure all DWV 2” or less at mid point -Security blocking at exterior doors -Seal all penetrations through air returns and plenums -Penetrations bored in floor joists less than 2” from end of member and less than 2” from additional bores in joist - 1st floor above refrigerator and along kitchen area -Floor joists penetration for pex less than 2” apart, 1st floor living room near windows -Fireblock deadspace at foyer/living room -Joist hangers at joist to lvl connection 1st floor front entry -12”oc nailing at all abutting and intersecting wall corners, braced wall panels -Seal all top and bottom plate penetrations -Insulate first, then solid block at cantilevers per plans -(2) 2x6 at front door/foyer closet corner per plans -Truss hangers per plans -Attic access garage per plans -LIB bracing per plans -connect 2x6 top plate to 2x4 top plate at 2nd floor stairs -Bocca protection plate at DWV bottom plate 2nd floor master bed wall -Fireblock 2nd floor HVAC chase hall -structural straps at all top plates bored 50% or more all exterior walls and all interior load bearing walls -Stud shoes at all DWV master bath exterior wall, nail all stud shoes currently installed -Penetrations for NM in floor joists less than 2” from end of joist -Several locations throughout basement -DWV cleanout covered at bottom basement stair -Install lag bolts at deck ledger per code -(2) bolts at post rim connections at deck -Install angel clip on inner ply at rim at deck ledger -Nail all joist hangers at deck
Gas Service Inspection - Residential Failed 1/12/2021 1/12/2021 01/12/2021
Misc
Corrective Action Required
01/07/2021
-GAS PRESSURE AT 8 PSI, MUST MAINTAIN 10 PSI FOR TEST
All Rough Inspection - Residential Failed 1/12/2021 1/12/2021 01/12/2021
Misc
Corrective Action Required
01/07/2021
-Secure all DWV 2” or less at mid point -Seal all penetrations through air returns and plenums -kitchen ceiling joist penetrations -Penetrations bored in floor joists less than 2” from end of member and less than 2” from additional bores in joist - 1st floor above refrigerator and along kitchen area - replace or submit engineered solution -Floor joists penetration for pex less than 2” apart, 1st floor living room near windows - replace or submit engineered solution -Seal all top and bottom plate penetrations - above front door 2nd floor top plate -Insulate first, then solid block at cantilevers per plans -Truss hangers per plans -Attic access garage per plans -LIB bracing per plans -Fireblock 2nd floor HVAC chase hall -structural straps at all top plates bored 50% or more all exterior walls and all interior load bearing walls -Stud shoes at all DWV master bath exterior wall, nail all stud shoes currently installed -Penetrations for NM in floor joists less than 2” from end of joist -Several locations throughout basement - replace or submit engineered solution -DWV cleanout covered at bottom basement stair
Sewer Service Inspection - R Passed 1/14/2021 1/14/2021 01/14/2021
Water Service Inspection - R Partial 1/14/2021 1/14/2021 01/14/2021
Misc
Informational
01/14/2021
-INSPECTED PARTIAL PEX WATER AT MID POINT OF YARD TO HOUSE ENTRANCE
Gas Service Inspection - Residential Passed 1/14/2021 1/14/2021 01/14/2021
Misc
Resolved
01/14/2021
All Rough Inspection - Residential Failed 1/14/2021 1/14/2021 01/14/2021
Misc
Corrective Action Required
01/12/2021
-Seal all penetrations through air returns and plenums -kitchen ceiling joist penetrations -Penetrations bored in floor joists less than 2” from end of member and less than 2” from additional bores in joist - 1st floor above refrigerator and along kitchen area - replace or submit engineered solution -Floor joists penetration for pex less than 2” apart, 1st floor living room near windows - replace or submit engineered solution -Seal all top and bottom plate penetrations - above front door 2nd floor top plate -Insulate first, then solid block at cantilevers per plans -Truss hangers per plans -covered deck -Attic access garage per plans -Fireblock 2nd floor HVAC chase hall -seal gaps at penetration(s) -structural straps at all top plates bored 50% or more all exterior walls and all interior load bearing walls - see master bath top exterior wall -Stud shoe at DWV master bath exterior wall, over 40% bore of stud -Penetrations for NM in floor joists less than 2” from end of joist -Several locations throughout basement - replace or submit engineered solution -DWV cleanout covered at bottom basement stair
Water Service Inspection - R Passed 1/19/2021 (10:45) 1/19/2021 01/19/2021
Misc
Resolved
01/19/2021
All Rough Inspection - Residential Failed 1/19/2021 1/19/2021 01/19/2021
Misc
Corrective Action Required
01/14/2021
-Seal all penetrations through air returns and plenums -kitchen ceiling joist penetrations -Penetrations bored in floor joists less than 2” from end of member and less than 2” from additional bores in joist - 1st floor above refrigerator and along kitchen area - replace or submit engineered solution -Floor joists penetration for pex less than 2” apart, 1st floor living room near windows - replace or submit engineered solution -Truss hangers per plans -covered deck -Attic access garage per plans -Penetrations for NM in floor joists less than 2” from end of joist -Several locations throughout basement - replace or submit engineered solution -DWV cleanout covered at bottom basement stair
All Rough Inspection - Residential Failed 1/25/2021 1/25/2021 01/25/2021
Misc
Corrective Action Required
01/19/2021
-Penetrations bored in floor joists less than 2” from end of member and less than 2” from additional bores in joist - 1st floor above refrigerator and along kitchen area - replace or submit engineered solution -Floor joists penetration for pex less than 2” apart, 1st floor living room near windows - replace or submit engineered solution -Penetrations for NM in floor joists less than 2” from end of joist -Several locations throughout basement - replace or submit engineered solution NO ENGINEER LETTER ON FILE IN PERMIT - SUBMIT LETTER TO DEVTECH@CITYOFLS.NET -DWV cleanout covered at bottom basement stair **OK TO INSULATE**
Driveway Inspection Partial 2/3/2021 (P.M.) 2/3/2021 02/03/2021
Misc
Informational
02/03/2021
PRE POUR INSPECTION The forms are set and there appears to be sufficient compacted aggregate.
All Rough Inspection - Residential Failed 2/8/2021 2/8/2021 02/08/2021
Misc
Corrective Action Required
01/25/2021
-Floor joists penetration for pex less than 2” apart, 1st floor living room near windows - replace or submit engineered solution -Penetrations for NM in floor joists less than 2” from end of joist -Several locations throughout basement - replace or submit engineered solution NO ENGINEER LETTER ON FILE IN PERMIT - SUBMIT LETTER TO DEVTECH@CITYOFLS.NET -DWV cleanout covered at bottom basement stair **OK TO INSULATE**
All Rough Inspection - Residential Failed 2/10/2021 2/10/2021 02/10/2021
Misc
Corrective Action Required
02/08/2021
-Floor joists penetration for pex less than 2” apart, 1st floor living room near windows - replace or submit engineered solution -Penetrations for NM in floor joists less than 2” from end of joist -Several locations throughout basement - replace or submit engineered solution NO ENGINEER LETTER ON FILE IN PERMIT - SUBMIT LETTER TO DEVTECH@CITYOFLS.NET -DWV cleanout covered at bottom basement stair **OK TO INSULATE** ENG letter does not address multiple locations. Strap added in the kitchen does not meet the ENG letter. Please address all location , some joist were added in the basement.
All Rough Inspection - Residential Not Ready 2/11/2021 2/11/2021 02/11/2021
Misc
Corrective Action Required
02/10/2021
-Floor joists penetration for pex less than 2” apart, 1st floor living room near windows - replace or submit engineered solution -Penetrations for NM in floor joists less than 2” from end of joist -Several locations throughout basement - replace or submit engineered solution -DWV cleanout covered at bottom basement stair - plumbing contractor on site working on issue at time of inspection **OK TO INSULATE** ENG letter does not address multiple locations. Please address all location , some joist were added in the basement.
Driveway Inspection Passed 2/10/2021 2/10/2021 02/22/2021
Misc
Informational
02/03/2021
PRE POUR INSPECTION The forms are set and there appears to be sufficient compacted aggregate.
All Rough Inspection - Residential Failed - Stop Work 2/24/2021 02/24/2021
Misc
Corrective Action Required
02/11/2021
-Floor joists penetration for pex less than 2” apart, 1st floor living room near windows - replace or submit engineered solution -Penetrations for NM in floor joists less than 2” from end of joist -Several locations throughout basement - replace or submit engineered solution -DWV cleanout covered at bottom basement stair - plumbing contractor on site working on issue at time of inspection **OK TO INSULATE** ENG letter does not address multiple locations. Please address all location , some joist were added in the basement. -2/24/21 - HOUSE HAS BEEN ROCKED WITHOUT APPROVAL, REMOVE ALL SHEETROCK FROM HOUSE - STOP WORK ORDER ISSUES
All Rough Inspection - Residential Passed 4/2/2021 4/2/2021 04/02/2021
Misc
Resolved
04/02/2021
Erosion Control Inspection Residential Passed 05/17/2021
Plot Plan Inspection Passed 05/17/2021
Occupancy Inspection - Codes Residential Failed 5/17/2021 5/17/2021 05/17/2021
Misc
Corrective Action Required
05/17/2021
-Install spindles at basement stairs -Anti siphon device required at spigot on main water line in basement, ensure set screw head is clipped off anti siphon after installation -(2) 1/2" through bolts required at each post/beam connection per code at deck, R507.5.1(2)
Occupancy Inspection - Codes Residential Failed 5/19/2021 5/19/2021 05/19/2021
Misc
Corrective Action Required
05/17/2021
-Anti siphon device required at spigot on main water line in basement, ensure set screw head is clipped off anti siphon after installation
Occupancy Inspection - Codes Residential Full C of O 5/20/2021 5/20/2021 05/20/2021
Misc
Resolved
05/20/2021
Documents & Images
Date Uploaded File Type Document Name
07/29/2020 Letter Permit Application and license tax form
07/29/2020 Drawing Approved Drawings
07/29/2020 Drawing Approved Truss Layout
07/29/2020 Drawing Approved Truss Package
07/29/2020 Plot Plan Approved Plot Plan
07/29/2020 Receipt Receipt for transaction:2020-004817
07/29/2020 Letter DS Building Permit
08/26/2020 Letter INSPECTION SUMMARY
09/14/2020 Letter INSPECTION SUMMARY
10/06/2020 Letter INSPECTION SUMMARY
11/16/2020 Letter INSPECTION SUMMARY
01/04/2021 Letter INSPECTION SUMMARY
01/07/2021 Letter INSPECTION SUMMARY
01/07/2021 Letter INSPECTION SUMMARY
01/07/2021 Letter INSPECTION SUMMARY
01/07/2021 Letter INSPECTION SUMMARY
01/12/2021 Letter INSPECTION SUMMARY
01/12/2021 Letter INSPECTION SUMMARY
01/14/2021 Letter INSPECTION SUMMARY
01/14/2021 Letter INSPECTION SUMMARY
01/14/2021 Letter INSPECTION SUMMARY
01/14/2021 Letter INSPECTION SUMMARY
01/19/2021 Letter INSPECTION SUMMARY
01/19/2021 Letter INSPECTION SUMMARY
01/25/2021 Letter INSPECTION SUMMARY
02/03/2021 Letter INSPECTION SUMMARY
02/04/2021 94 Manor at Stoney Creek Holes in Floor Joists Letter
02/08/2021 Letter INSPECTION SUMMARY
02/10/2021 Letter INSPECTION SUMMARY
02/11/2021 Letter INSPECTION SUMMARY
02/22/2021 Letter INSPECTION SUMMARY
02/24/2021 Letter Stop Work Order
02/24/2021 B607D296-6053-4700-9495-C16942141D78.jpeg
02/24/2021 82EFFFF4-BAD8-4123-AF64-D4868C512D37.jpeg
03/18/2021 02E43B0A-9701-469F-9FD1-275AB01E890F
03/31/2021 Lot 94 Structural Inspection - Signed
04/02/2021 Letter INSPECTION SUMMARY
05/12/2021 Receipt Receipt for transaction:2021-002910
05/17/2021 Letter INSPECTION SUMMARY
05/17/2021 Letter INSPECTION SUMMARY
05/17/2021 Letter INSPECTION SUMMARY
05/19/2021 Letter INSPECTION SUMMARY
05/20/2021 Letter Field Certificate of Occupancy
05/20/2021 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home