Summary
PRRES20192709
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - COVERED PATIO
09/20/2019
09/24/2019
05/14/2020
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
PERMITTING@SUMMITHOMESKC.COM  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
KIMBEL MECHANICAL SYSTEMS, INC, Address:1936 N SHILOH DR, Phone:(479) 756-1099  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 09/24/2019 09/24/2019
Dylan Eppert
Residential Plan Review Approved 09/25/2019 09/24/2019
Dylan Eppert
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $1,405.20 $1,405.20 Paid 09/24/2019
8331507-Sewer Connection Fee $570.00 $570.00 Paid 09/24/2019
8331401-Water Tap Fee $3,477.00 $3,477.00 Paid 09/24/2019
8350015-Water Meter Fee $425.02 $425.02 Paid 09/24/2019
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 09/24/2019
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid 09/24/2019
9110078-Valuation Fee New Single Family $55.77 $55.77 Paid 02/26/2020
$1,460.97
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 10/7/2019 (11:30) 10/7/2019 10/07/2019
Underslab Plumbing Inspection - Residential Failed 10/29/2019 10/29/2019 10/29/2019
Misc
Corrective Action Required
10/29/2019
-No address posted -Clean up street of dirt and debris, fix erosion control -Drain tile needs to be corrected and set
Underslab Plumbing Inspection - Residential Failed 10/30/2019 10/30/2019 10/30/2019
Misc
Corrective Action Required
10/29/2019
-Drain tile needs to be corrected and set around foundation walls
Underslab Plumbing Inspection - Residential Passed 11/1/2019 11/1/2019 11/01/2019
Misc
Resolved
11/01/2019
Piers/Caissons Inspection - Residential Passed 12/19/2019 (9:00) 12/19/2019 12/19/2019
All Rough Inspection - Residential Failed 1/8/2020 1/8/2020 01/08/2020
Misc
Corrective Action Required
01/08/2020
-fireblock underneath 2nd floor bathroom tub - fireblock all penetrations through top and bottom plates - protect electrical wiring and home run at bottom plate in 1st floor bedroom, 3” strike plate - protect piping at bottom plate, west wall in Kitchen - fire blocking needed through out house, dead spaces, top and bottom plates, through sub floor. - secure gas line to fireplace - triple joist hanger needed for LVLs in living room - support duct work above microwave - anchor beam posts in basement Do not insulate Failed erosion control, install erosion control on south side of lot and protect around big mound of dirt in back yard. Erosion control at front of lot is failing, clean up street of dirt and debris. All Must be done before future inspections
Gas Service Inspection - Residential Passed 1/8/2020 1/8/2020 01/08/2020
Erosion Control Inspection Residential Failed 01/08/2020
Misc
Corrective Action Required
01/08/2020
Failed erosion control, install erosion control on south side of lot and protect around big mound of dirt in back yard. Erosion control at front of lot is failing, clean up street of dirt and debris. All Must be done before future inspections
Electrical Service Inspection Passed 1/8/2020 1/8/2020 01/08/2020
Gas Piping Inspection - Residential Passed 1/8/2020 1/8/2020 01/08/2020
All Rough Inspection - Residential Failed 1/13/2020 1/13/2020 01/13/2020
Misc
Corrective Action Required
01/08/2020
- fireblock all penetrations through top and bottom plates - protect electrical wiring and home run at bottom plate in 1st floor bedroom, 3” strike plate - protect piping at bottom plate, west wall in Kitchen - fire blocking needed through out house, dead spaces, top and bottom plates, through sub floor. * dead spaces on west wall furout, deadspace behind microwave top plate - support duct work above microwave, cannot be secured by flange only Do not insulate Failed erosion control, install erosion control on south side of lot and protect around big mound of dirt in back yard. Erosion control at front of lot is failing, clean up street of dirt and debris. All Must be done before future inspections
All Rough Inspection - Residential Passed 1/15/2020 1/15/2020 01/15/2020
Misc
Resolved
01/15/2020
Erosion Control Inspection Residential Failed 02/21/2020
Misc
Corrective Action Required
01/08/2020
Failed erosion control, install erosion control on south side of lot and protect around big mound of dirt in back yard. Erosion control at front of lot is failing, clean up street of dirt and debris. All Must be done before future inspections
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
02/21/2020
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. CLEAN STREETS OF MUD AND SILT. CONTROL MUD, ROCK AND DEBRIS FROM LEAVING YOUR SITE.
Sewer Service Inspection - R Passed 3/3/2020 (1:00) 3/3/2020 03/03/2020
Water Service Inspection - R Passed 3/4/2020 (11:30) 3/4/2020 03/04/2020
Erosion Control Inspection Residential Failed 3/10/2020 03/10/2020
Misc
Corrective Action Required
02/21/2020
Failed erosion control, install erosion control on south side of lot and protect around big mound of dirt in back yard. Erosion control at front of lot is failing, clean up street of dirt and debris. All Must be done before future inspections
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
02/21/2020
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. CLEAN STREETS OF MUD AND SILT. CONTROL MUD, ROCK AND DEBRIS FROM LEAVING YOUR SITE.
Misc
Corrective Action Required
03/10/2020
Maintain silt fence Maintain gravel filter Clean street
All Rough Inspection - Residential Passed 3/10/2020 03/10/2020
Misc
Informational
03/10/2020
Basement finish
Driveway Inspection Partial 4/6/2020 (Ready Now) 4/6/2020 04/06/2020
Misc
Informational
04/06/2020
PRE POUR INSPECTION The forms are set and there appears to be sufficient compacted aggregate.
Driveway Inspection Passed 4/10/2020 04/10/2020
Misc
Informational
04/06/2020
PRE POUR INSPECTION The forms are set and there appears to be sufficient compacted aggregate.
Occupancy Inspection - Codes Residential Failed 4/22/2020 4/22/2020 04/22/2020
Misc
Corrective Action Required
04/22/2020
- Guardrail required at front porch, more than 30” above grade - Complete final grade and sod - Seal all exterior penetrations - Seal around all exterior light fixtures - Obtain lawn irrigation system permit and submit backflow certification - Place splashblocks at all downspout and sump pump discharge locations for minimum distance from foundation 36”
Occupancy Inspection - Codes Residential Temporary C of O 4/24/2020 4/24/2020 04/23/2020
Misc
Corrective Action Required
04/22/2020
- Guardrail required at front porch, more than 30” above grade - Complete final grade and sod - Seal all exterior penetrations - Seal around all exterior light fixtures - Obtain lawn irrigation system permit and submit backflow certification - Place splashblocks at all downspout and sump pump discharge locations for minimum distance from foundation 36” OK for TCO
Occupancy Inspection - Codes Residential Full C of O 5/14/2020 5/14/2020 05/14/2020
Misc
Resolved
05/14/2020
Plot Plan Inspection Passed 05/14/2020
Documents & Images
Date Uploaded File Type Document Name
09/24/2019 Receipt Receipt for transaction: 2019-006414
09/24/2019 Letter DS Building Permit
09/25/2019 Plot Plan DOC092519-09252019090537
10/07/2019 Letter INSPECTION SUMMARY
10/29/2019 Letter INSPECTION SUMMARY
10/30/2019 Letter INSPECTION SUMMARY
11/01/2019 Letter INSPECTION SUMMARY
12/19/2019 Letter INSPECTION SUMMARY
01/08/2020 Letter INSPECTION SUMMARY
01/08/2020 Letter INSPECTION SUMMARY
01/08/2020 Letter INSPECTION SUMMARY
01/08/2020 Letter INSPECTION SUMMARY
01/08/2020 Letter INSPECTION SUMMARY
01/13/2020 Letter INSPECTION SUMMARY
01/15/2020 Letter INSPECTION SUMMARY
02/21/2020 Letter DE-Daily Inspection Summary
02/26/2020 Receipt Receipt for transaction: 2020-000837
02/26/2020 Letter DS Building Permit
03/03/2020 Letter INSPECTION SUMMARY
03/04/2020 Letter INSPECTION SUMMARY
03/10/2020 Letter INSPECTION SUMMARY
03/10/2020 Letter INSPECTION SUMMARY
04/06/2020 Letter INSPECTION SUMMARY
04/10/2020 Letter INSPECTION SUMMARY
04/22/2020 Letter INSPECTION SUMMARY
04/23/2020 Letter Codes Temporary Certificate of Occupancy
05/14/2020 Letter Field Certificate of Occupancy
05/14/2020 Letter Codes Final Certificate of Occupancy
05/14/2020 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide: