NEW SINGLE FAMILY
NEW HOUSE - PARTIAL FINISHED BASEMENT - COVERED DECK
07/10/2019
08/02/2019
07/09/2020
Locations
Contacts
TRUMARK HOMES, LLC, Address:424 SE MAXWELL DR, Phone:(816) 564-5613  
YANCIK@SBCGLOBAL.NET  
BLUE VALLEY HEATING & COOLING LLC, Address:P O BOX 241, Phone:(816) 867-5122  
IMPACT ELECTRICAL SOLUTIONS LLC, Address:14 ANCHOR DRIVE, Phone:(816) 674-9345  
A BRIGHT PLUMBING LLC, Address:201 NE WOODBURY DR, Phone:(816) 867-4540  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 07/12/2019 08/01/2019
Steve Conrick
Basement elevation
Corrective Action Required
07/12/2019

The Basement floor elevation and basement type (e.g. full/standard, daylight, walk-out, etc.) *You must have approval by sealed letter from design engineer of MDP to use a different basement type than what is called out on the MDP.
Residential Plan Review Approved 07/12/2019 07/10/2019
Dylan Eppert
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee New Single Family $1,156.83 $1,156.83 Paid 08/02/2019
8331507-Sewer Connection Fee $540.00 $540.00 Paid 08/02/2019
Water Tap Fee $3,477.00 $3,477.00 Paid 08/02/2019
Water Meter Fee $425.02 $425.02 Paid 08/02/2019
Right of Way Permit Fee $80.00 $80.00 Paid 08/02/2019
Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 08/02/2019
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 8/2/2019 at 12:40 PM 08/02/2019
Sewer Service Inspection - R Passed 8/14/2019 (9:45) 8/14/2019 at 10:15 AM 08/14/2019
Underslab Plumbing Inspection - Residential Passed 8/15/2019 at 9:45 AM 08/15/2019
Water Service Inspection - R Passed 8/15/2019 (2:15) 8/15/2019 at 2:40 PM 08/15/2019
Piers/Caissons Inspection - Residential Failed 8/20/2019 8/20/2019 at 10:55 AM 08/20/2019
Misc
Corrective Action Required
08/20/2019
-PROVIDE PLAN ON SITE -CLEAN OUT LOOSE DIRT FROM PIER HOLES -PIER HOLE OFFSET. CHECK PLAN
Piers/Caissons Inspection - Residential Passed 8/20/2019 (11:30) 8/20/2019 at 1:20 PM 08/20/2019
Misc
Resolved
08/20/2019
-PROVIDE PLAN ON SITE -CLEAN OUT LOOSE DIRT FROM PIER HOLES -PIER HOLE OFFSET. CHECK PLAN
Piers/Caissons Inspection - Residential Passed 9/16/2019 (Ready Now) 9/16/2019 at 1:50 PM 09/16/2019
Informational
09/16/2019
STAIR LADING PIERS
Electrical Service Inspection Passed 10/11/2019 10/11/2019 10/11/2019
Gas Service Inspection - Residential Failed 10/11/2019 10/11/2019 10/11/2019
Misc
Corrective Action Required
10/11/2019
-Provide min ten psi test pressure
All Rough Inspection - Residential Failed 10/11/2019 10/11/2019 at 8:25 AM 10/11/2019
Misc
Corrective Action Required
10/11/2019
**PROVIDE 3/4” GRAVEL AT LOT ENTRANCE FRAMING: -Strap garage portal wall per code -Fb all flood&ceiling penetrations -Strap top plate bored more than 50% above master bathroom sink -Anchor sill plate within 12” of break near basement walkout door -Fb basement wall vertically at ten ft or less; use 3/4” nominal sheathing for fire blocking, not 1/2”; Fb wall from joist space and soffit -Install missing I beam support column near furnace -Install hangers at joist connections at stair wall -Install solid blocking under rear dining lvl point load MECHANICAL: -Vent bath fans -Dryer duct cannot be distorted -Seal all return air space penetrations -Fasten fireplace to frame -Pan off return air from the unused joist space (above barn door in basement ) PLUMBING: -Nail stud shoe at master shower wall ELECTRICAL: -Smoke alarm outside master bedroom must be near top of ceiling and min ten ft from cooking appliance -Over filled box at basement bathroom switch (38 cubic inches conductor fill) **OK TO INSULATE **GROUNDING CONNECTION MUST BE ACCESSIBLE
All Rough Inspection - Residential Failed 10/15/2019 10/15/2019 at 2:00 PM 10/15/2019
Misc
Corrective Action Required
10/11/2019
**PROVIDE 3/4” GRAVEL AT LOT ENTRANCE FRAMING: -Fb basement wall vertically at ten ft or less; use 3/4” nominal sheathing for fire blocking, not 1/2”; Fb wall from joist space and soffit **OK TO INSULATE **GROUNDING CONNECTION MUST BE ACCESSIBLE
Gas Service Inspection - Residential Passed 10/15/2019 10/15/2019
Misc
Resolved
10/15/2019
-Provide min ten psi test pressure
All Rough Inspection - Residential Failed 10/17/2019 10/17/2019 at 10:25 AM 10/17/2019
Misc
Corrective Action Required
10/15/2019
*********************************** PROVIDE 3/4” GRAVEL AT LOT ENTRANCE. NO FURTHER INSPECTION IS EROSION CONTROL IS NOT IN COMPLIANCE *********************************** FRAMING: -Fb basement wall vertically at ten ft or less; use 3/4” nominal sheathing for fire blocking, not 1/2”; Fb wall from joist space and soffit **Fb wall every ten ft or less: small 1" or less gap between stud and foundation wall can be foamed with fireblocking foam. For larger gap, use 3/4" sheathing or 2x lumber **OK TO INSULATE **GROUNDING CONNECTION MUST BE ACCESSIBLE
All Rough Inspection - Residential Passed 10/21/2019 10/21/2019 at 9:30 AM 10/21/2019
Misc
Resolved
10/21/2019
*********************************** PROVIDE 3/4” GRAVEL AT LOT ENTRANCE. NO FURTHER INSPECTION IS EROSION CONTROL IS NOT IN COMPLIANCE *********************************** FRAMING: -Fb basement wall vertically at ten ft or less; use 3/4” nominal sheathing for fire blocking, not 1/2”; Fb wall from joist space and soffit **Fb wall every ten ft or less: small 1" or less gap between stud and foundation wall can be foamed with fireblocking foam. For larger gap, use 3/4" sheathing or 2x lumber **OK TO INSULATE **GROUNDING CONNECTION MUST BE ACCESSIBLE
Driveway Inspection Partial 11/22/2019 11/22/2019 11/22/2019
Misc
Informational
11/22/2019
11-22-19 1:57pm The driveway is formed and aggregate is compacted. They were told to have expansion for the curb. They were told to stay ADA compliant for the sidewalk that runs through the drive.
Sidewalk Inspection Partial 12/6/2019 (A.M.) 12/6/2019 12/06/2019
Misc
Informational
12/06/2019
Sidewalk - forms & materials passed pre-inspection.
Driveway Inspection Passed 12/06/2019
Misc
Informational
11/22/2019
11-22-19 1:57pm The driveway is formed and aggregate is compacted. They were told to have expansion for the curb. They were told to stay ADA compliant for the sidewalk that runs through the drive.
Misc
Informational
12/06/2019
Driveway- passed inspection.
Piers/Caissons Inspection - Residential Passed 12/27/2019 12/27/2019 at 8:50 AM 12/27/2019
Informational
12/27/2019
PATIO PERGODA PIERS-OK
Occupancy Inspection - Codes Residential Failed 3/24/2020 at 8:50 AM 03/24/2020
Misc
Corrective Action Required
03/24/2020
** SHALL INSTALL EROSION CONTROL ALONG STREET AND AROUND REAR CORNER. CLEAN UP STREET -Sidewalk not approved on record -Outside not inspected at this time. Make sure to seal all exterior lights and wall penetrations; sewer tracer wire port; 40 amp AC breaker match label -Install address -Final grade, sod -Garage door not self closing -Provide plan on site. Need to check something -Remove cover from smoke alarm -Install flood light bulbs -Deck: block/reinforce guardrail posts; handrail must extend to top riser -Install water heater and Install breaker lock. Do not block access to water service shut-off valve and other valve
Sidewalk Inspection Passed 3/30/2020 3/30/2020 03/30/2020
Misc
Informational
12/06/2019
Sidewalk - forms & materials passed pre-inspection.
Corrective Action Required
03/30/2020
Corrective Action Required
03/30/2020
Corrective Action Required
03/30/2020
The sidewalk has passed.
Erosion Control Inspection Residential Failed 3/30/2020 03/30/2020
Misc
Corrective Action Required
03/30/2020
Mud and silt by the sidewalk o the side of the house, sidewalk needs to be cleaned up.
Erosion Control Inspection Residential Failed 4/2/2020 04/02/2020
Misc
Corrective Action Required
03/30/2020
** SHALL INSTALL EROSION CONTROL ALONG THE STREET AND AROUND REAR CORNER. CLEAN UP STREET. -FAILURE TO INSTALL EROSION CONTROL WITHIN TWO BUSINESS DAYS WILL RESULT IN A STOP-WORK ORDER
Erosion Control Inspection Residential Passed 07/02/2020
Misc
Resolved
07/02/2020
** SHALL INSTALL EROSION CONTROL ALONG THE STREET AND AROUND REAR CORNER. CLEAN UP STREET. -FAILURE TO INSTALL EROSION CONTROL WITHIN TWO BUSINESS DAYS WILL RESULT IN A STOP-WORK ORDER
Occupancy Inspection - Codes Residential Temporary C of O 7/2/2020 7/2/2020 at 9:55 AM 07/02/2020
Misc
Corrective Action Required
03/24/2020
-Deck: handrail must extend to top riser **Either install an un-spliced handrail or install handrail support bracket at the spliced joint. FYI: code requires that the handrail must be able to handle 200 lbs of concentrate force
Occupancy Inspection - Codes Residential Full C of O 7/9/2020 7/9/2020 at 7:45 AM 07/09/2020
Misc
Resolved
07/09/2020
-Deck: handrail must extend to top riser **Either install an un-spliced handrail or install handrail support bracket at the spliced joint. FYI: code requires that the handrail must be able to handle 200 lbs of concentrate force
Documents & Images
Date Uploaded File Type Document Name
07/12/2019 Letter Codes Residential Plan Review
08/02/2019 Receipt Receipt for transaction: 2019-005264
08/02/2019 Letter DS Building Permit
08/02/2019 Engineer Report/Study DOC080219
08/02/2019 Plot Plan DOC080219-001
08/14/2019 Letter INSPECTION SUMMARY
08/15/2019 Letter INSPECTION SUMMARY
08/15/2019 Letter INSPECTION SUMMARY
08/20/2019 Letter INSPECTION SUMMARY
08/20/2019 Letter INSPECTION SUMMARY
09/16/2019 Letter INSPECTION SUMMARY
10/11/2019 Letter INSPECTION SUMMARY
10/11/2019 Letter INSPECTION SUMMARY
10/11/2019 Letter INSPECTION SUMMARY
10/15/2019 Letter INSPECTION SUMMARY
10/15/2019 Letter INSPECTION SUMMARY
10/15/2019 Letter INSPECTION SUMMARY
10/17/2019 Letter INSPECTION SUMMARY
10/21/2019 Letter INSPECTION SUMMARY
11/22/2019 Letter INSPECTION SUMMARY
12/06/2019 Letter INSPECTION SUMMARY
12/06/2019 Letter INSPECTION SUMMARY
12/27/2019 Letter INSPECTION SUMMARY
03/24/2020 Letter INSPECTION SUMMARY
03/30/2020 Letter DE-Daily Inspection Summary
04/02/2020 Letter INSPECTION SUMMARY
07/02/2020 Letter INSPECTION SUMMARY
07/02/2020 Letter Codes Temporary Certificate of Occupancy
07/09/2020 Letter Codes Final Certificate of Occupancy
07/09/2020 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home