Summary
PRRES20190564
Building Permit - Residential
Certificate of Occupancy
BEHOME LLC
NEW SINGLE FAMILY
NEW HOUSE, UNFINISHED BASEMENT, COVERED DECK
03/14/2019
03/20/2019
07/07/2020
Locations
Contacts
BE HOME LLC, Address:7618 S ARNETT RD, Phone:(816) 591-6013  
MIKE@BEHOMELLC.COM  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
KC ELECTRICAL CONTRACTORS, LLC, Address:986 MOORE PL, Phone:(816) 739-8851  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
BEHOME LLC, Address:7618 S ARNETT RD  
Reviews
Review Type Outcome Est. Completion Date Completed
Residential Plan Review Approved 03/18/2019 03/20/2019
Development Center
05 Provide square footage of living area, garage area, unfinished basement
Corrective Action Required
03/14/2019

Provide square footage of living area, garage area, unfinished basement area, etc (IRC Section R304) Provide sq footage for garage, unfinished basement, covered deck, uncovered deck on construction plans.
06 Designate use of each room or space
Corrective Action Required
03/14/2019

Designate use of each room or space including but not limited to; basement storage, garages, and attic areas intended for storage space. Need to clarify if you plan on having a covered deck as well as an uncovered deck. Plans shows both but application shows only a covered deck.
12 Detail required separation between garage and living area including door
Corrective Action Required
03/14/2019

Detail required separation between garage and living area including door, door closer and gypsum board. (IRC R302.5) We need door closer detain.
Miscellaneous Correction
Corrective Action Required
03/14/2019

Please provide the address on all pages of the construction documents.
Miscellaneous Correction
Corrective Action Required
03/14/2019

Mechanical contractor must be licensed with the city of Lee's Summit.
Plot Plan Review Approved 03/18/2019 03/19/2019
Steve Conrick
Sidewalks
Corrective Action Required
03/18/2019

Sidewalks with dimensions must be provided on the plot plan. ***Missing ada ramp and sidewalk call out*
Drainage swales
Corrective Action Required
03/18/2019

Drainage swales (where required); show spot elevations within the swale as required to conform to the approved master drainage plan (if applicable), must be provide *There is a swale that begins in the rear yard*
City infrustructure
Corrective Action Required
03/18/2019

Show all manholes, water valve boxes, fire hydrants, and stormwater structures. *Missing curb inlet*
As-graded plot plan
Corrective Action Required
03/18/2019

A as-graded plot plan per Section 7-160, Code of Ordinances, is required prior to occupancy. *Please add note "AS-GRADED PLOT PLAN IS REQUIRED PRIOR TO SODDING."*
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee New Single Family $1,370.88 $1,370.88 Paid 03/20/2019
Right of Way Permit Fee $80.00 $80.00 Paid 03/20/2019
8331507-Sewer Connection Fee $600.00 $600.00 Paid 03/20/2019
Water Tap Fee $3,409.00 $3,409.00 Paid 03/20/2019
Water Meter Fee $408.37 $408.37 Paid 03/20/2019
Not Ready Inspection Fee $50.00 $50.00 Paid 06/17/2020
Not Ready Inspection Fee $50.00 $50.00 Paid 06/17/2020
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 4/2/2019 (2:45) 4/2/2019 at 2:40 PM 04/02/2019
Water Service Inspection - R Not Ready 4/12/2019 4/12/2019 at 12:35 PM 04/12/2019
Underslab Plumbing Inspection - Residential Passed 4/15/2019 4/15/2019 at 8:20 AM 04/15/2019
Sewer Service Inspection - R Failed 5/2/2019 5/2/2019 at 11:10 AM 05/02/2019
Misc
Corrective Action Required
05/02/2019
INSTALL SEWER TRACER WIRE
Sewer Service Inspection - R Passed 5/2/2019 (1:00) 5/2/2019 at 1:55 PM 05/02/2019
Misc
Resolved
05/02/2019
INSTALL SEWER TRACER WIRE
Water Service Inspection - R Partial 4/16/2019 (8:00) 5/2/2019 05/02/2019
Water Service Inspection - R Passed 5/7/2019 at 11:55 AM 05/07/2019
All Rough Inspection - Residential Failed 6/6/2019 6/6/2019 at 10:15 AM 06/06/2019
Misc
Corrective Action Required
06/05/2019
FRAMING: -Nail all garage portal brace wall strap holes -Install full stud support for double joist at duct chase/garage wall -Anchor rear exterior wall sill plates per code -Support hip above master bedroom -Strap across stud-header at rear master bedroom wall -Solid block under lvl point load at hydrotub/bedroom wall -Fb space adjacent to master bathroom tub from roof -Nail hanger above master bathroom shower -Fb master closet duct chase and wall from furdown -Install ceiling joist hangers at master closet chase -Install lvl support (lvl running above master bathroom and half bath) -Solid block under lvl point load near fireplace wall shelf. Need min 1.5” bearing of solidblock onto I beam -Solid block under lvl point load inside return air space below great room light switch -Install security blocking for rear exterior door -Support hip above kitchen lvl beam -Provide attic access to roof space larger than 30 sq ft -Nail all rafter-ceiling joist connections -Over notched rafters at beam connections above 2nd fl closet -The tub/bedroom 3 wall is not a load bearing wall. Move roof struts to bearing wall -Toe nail joists to foundation wall sill plates with 3-8d -Install triple joist below kitchen lvl beam per plan ELECTRICAL: -Install intersystem bonding terminal near service. FYI: KCPL disallow grounding of the meter. Also the use of metal raceway to enclose the grounding electrode conductor requires bonding clamp at end of metal raceway -Complete circuit to hydrotub. GFCI must be readily accessible -Install a receptacle within 3ft of sink inside half bathroom PLUMBING: -Install stud shoe for exterior wall studs bored more than 40% in master bathroom -Install stud shoe at over bored laundry wall stud -Protect water lines in master bathroom shower, master closet/garage wall -Protect plumbing in 2nd fl bedroom and bathroom -Install top plate straps where bored more than 50% -Install roof flashing for vents -Support vent in attic at max 4 ft spacing MECHANICAL: -Complete panning off ceiling return air from roof at 2nd fl bedrooms **DO NOT INSULATE
Electrical Service Inspection Failed 6/6/2019 6/6/2019 06/06/2019
Misc
Corrective Action Required
06/05/2019
-The grounding electrode conductor shall be continuous from service panel to ufer with no splice or the splice must be irreversible -Install a listed rebar grounding clamp. The copper conductor must not be in direct contact with dissimilar metal
Gas Service Inspection - Residential Failed 6/6/2019 6/6/2019 06/06/2019
Misc
Corrective Action Required
06/05/2019
-No pressure
Erosion Control Inspection Residential Failed 6/6/2019 06/06/2019
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
06/06/2019
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED.
Electrical Service Inspection Passed 6/13/2019 6/13/2019 06/13/2019
Misc
Resolved
06/13/2019
-The grounding electrode conductor shall be continuous from service panel to ufer with no splice or the splice must be irreversible -Install a listed rebar grounding clamp. The copper conductor must not be in direct contact with dissimilar metal
Gas Service Inspection - Residential Failed 6/13/2019 6/13/2019 06/13/2019
Misc
Corrective Action Required
06/06/2019
-No pressure
All Rough Inspection - Residential Failed 6/13/2019 6/13/2019 at 9:40 AM 06/13/2019
Misc
Corrective Action Required
06/06/2019
FRAMING: -Solid block under lvl point load at hydrotub/bedroom wall **Support point load to I beam below in basement -Nail hanger above master bathroom shower **double joist hanger -Fb master closet duct chase and wall from furdown -Install lvl support (lvl running above master bathroom and half bath) -Provide attic access to roof space larger than 30 sq ft **install headers -Toe nail joists to foundation wall sill plates with 3-8d ELECTRICAL: -Complete circuit to hydrotub. GFCI must be readily accessible **the pump receptacle must be within 12" of access opening, in direct view -Install a receptacle within 3ft of sink inside half bathroom **circuit for bathroom receptacle cannot feed receptacles in laundry area. Must stay in bathroom **Feed master bathroom light from general lighting circuit, not from the 20 amp circuit supplying the sink receptacles PLUMBING: -Protect plumbing in 2nd fl bedroom and bathroom -Install top plate straps where bored more than 50% **OK TO INSULATE
All Rough Inspection - Residential Passed 6/17/2019 6/17/2019 at 10:10 AM 06/17/2019
Misc
Resolved
06/17/2019
FRAMING: -Solid block under lvl point load at hydrotub/bedroom wall **Support point load to I beam below in basement -Nail hanger above master bathroom shower **double joist hanger -Fb master closet duct chase and wall from furdown -Install lvl support (lvl running above master bathroom and half bath) -Provide attic access to roof space larger than 30 sq ft **install headers -Toe nail joists to foundation wall sill plates with 3-8d ELECTRICAL: -Complete circuit to hydrotub. GFCI must be readily accessible **the pump receptacle must be within 12" of access opening, in direct view -Install a receptacle within 3ft of sink inside half bathroom **circuit for bathroom receptacle cannot feed receptacles in laundry area. Must stay in bathroom **Feed master bathroom light from general lighting circuit, not from the 20 amp circuit supplying the sink receptacles PLUMBING: -Protect plumbing in 2nd fl bedroom and bathroom -Install top plate straps where bored more than 50% **OK TO INSULATE
Gas Service Inspection - Residential Passed 6/17/2019 6/17/2019 06/17/2019
Misc
Resolved
06/17/2019
-No pressure
Sidewalk Inspection Passed 8/13/2019 (P.M.) 8/13/2019 08/15/2019
Misc
Informational
08/13/2019
SIDEWALK- forms and materials passed pre-inspection.
Misc
Informational
08/15/2019
Sidewalk- passed final inspection.
Driveway Inspection Failed 7/30/2019 (A.M.) 7/30/2019 09/10/2019
Misc
Informational
08/13/2019
DRIVEWAY- forms and materials passed pre-inspection.
Misc
Informational
08/15/2019
Driveway-passed final inspection.
Misc
Corrective Action Required
09/10/2019
Sidewalks broken during grading and landscaping. Last panel in the front and last panel on the side of house.
Sidewalk Inspection Failed 12/19/2019 12/19/2019
Misc
Informational
08/13/2019
SIDEWALK- forms and materials passed pre-inspection.
Miscellaneous Correction
Corrective Action Required
12/19/2019
Steve Robbins 12/19/2019 3:06 PM Sidewalk was cracked during installation of landscaping and needs to be corrected before temporary occupancy can be received.
Occupancy Inspection - Codes Residential Failed 6/15/2020 6/15/2020 06/15/2020
Informational
04/12/2019
-WATER WAS SCHEDULED AS "READY NOW", BUT NOTHING WAS READY. ONLY THE UNDERSLAB PLUMBING INSIDE, BUT IT IS NOT EVEN A SAME-DAY INSPECTION, LET ALONE 2-HR INSPECTION. NOT-READY FEE ASSESSED
Misc
Corrective Action Required
09/24/2019
-Water meter well needs dug out and lowered to match grade. -ALL FEES NEED TO BE PAID BEFORE OCCUPANCY -PROVIDE HANDRAIL IN GARAGE STAIRS -COMPLETE ALL EXTERIOR DRAINAGE -PROVIDE AFCI PROTECTION PER CODE -PROVIDE GFCI PROTECTED RECEPTACLE FOR DISHWASHER AND IN LAUNDRY ROOM -PROVIDE SPARK RINGS WHERE RECESSED IN WOOD -PROVIDE HAMMER ARRESTORS -COVER PLATE UNDER SINK AND IN BASEMENT CEILING -FAULTY GFCI UPSTAIRS BEDROOM -SEAL PLENUM IN BASEMENT -REMOVE SCREW FROM ANTI SYPHON DEVICES -LOCKOUT DEVICES FOR ALL HARDWIRED APPLIANCES -PROVIDE CLAMP FOR AC WHIP
Plot Plan Inspection Passed 6/16/2020 at 10:05 AM 06/16/2020
Erosion Control Inspection Residential Passed 06/16/2020
DCM2 ESC DEFICIENT INSTALLATION
Resolved
06/16/2020
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED.
Occupancy Inspection - Codes Residential Failed 7/1/2020 at 8:45 AM 07/01/2020
Misc
Corrective Action Required
06/16/2020
-REPLACE BROKEN WATER METER LID -PROVIDE HANDRAIL IN GARAGE STAIRS **NOT DONE. REQUIRED FOR STAIR WITH 4 OR MORE RISERS -COMPLETE ALL EXTERIOR DRAINAGE **CITY ORDINANCE REQUIRES MIN 3 FT OF STORM WATER DISCHARGE FROM BUILDING -PROVIDE AFCI PROTECTION PER CODE **REQUIRE FOR SMOKE ALARM CIRCUIT. PERMIT STILL UNDER PREVIOUS CODE CYCLE -PROVIDE GFCI PROTECTED RECEPTACLE FOR LAUNDRY RECEPTACLE LOCATED WITHIN SIX FT OF SINK -PROVIDE SPARK RINGS WHERE RECESSED IN WOOD **THROUGHOUT HOUSE WHERE THE ELECTRICAL BOX IS RECESSED BEHIND COMBUSTIBLE WALL FINISH -PROVIDE HAMMER ARRESTOR FOR DISHWASHER WATER SUPPLY -FAULTY GFCI UPSTAIRS BEDROOM **NO POWER TO RECEPTACLE -SEAL PLENUM IN BASEMENT **NOT DONE -LOCKOUT DEVICES FOR ALL HARDWIRED APPLIANCES **KITCHEN HOOD BREAKER -PROVIDE CLAMP FOR AC WHIP **SECURE THE WHIP WITHIN 12" OF DISCONNECT ADDENUM: NEED ACCESS TO THE SEWER CLEAN OUT AND WATER SERVICE VALVES; THE RECEPTACLE AT THE FURNACE MUST BE SINGLE PLUG DEDICATED FOR THE WATER HEATER OR GFCI-PROTECTED; NEED 1/2" GYPSUM FIRE PROTECTION UNDER THE BOXED OUT WALL IN THE GARAGE
Occupancy Inspection - Codes Residential Failed 7/6/2020 7/6/2020 at 8:40 AM 07/06/2020
Misc
Corrective Action Required
07/01/2020
-REPLACE BROKEN WATER METER LID -PROVIDE GFCI PROTECTED RECEPTACLE FOR LAUNDRY RECEPTACLE LOCATED WITHIN SIX FT OF SINK **THE WASHER RECEPTACLE OUTLET WITHIN SIX FT OF THE SINK MUST BE GFCI-PROTECTED -PROVIDE SPARK RINGS WHERE RECESSED IN WOOD **THROUGHOUT HOUSE WHERE THE ELECTRICAL BOX IS RECESSED BEHIND COMBUSTIBLE WALL FINISH. THE BOX MUST FLUSH WITH THE COMBUSTIBLE WALL FINISH -LOCKOUT DEVICES FOR ALL HARDWIRED APPLIANCES **KITCHEN HOOD BREAKER -PROVIDE CLAMP FOR AC WHIP **SECURE THE WHIP WITHIN 12" OF DISCONNECT -THE RECEPTACLE AT THE FURNACE MUST BE SINGLE PLUG DEDICATED FOR THE WATER HEATER OR GFCI-PROTECTED; NEED 1/2" GYPSUM FIRE PROTECTION UNDER THE BOXED OUT WALL IN THE GARAGE
Occupancy Inspection - Codes Residential Full C of O 7/8/2020 7/8/2020 at 2:40 PM 07/07/2020
Misc
Resolved
07/07/2020
-REPLACE BROKEN WATER METER LID -PROVIDE GFCI PROTECTED RECEPTACLE FOR LAUNDRY RECEPTACLE LOCATED WITHIN SIX FT OF SINK **THE WASHER RECEPTACLE OUTLET WITHIN SIX FT OF THE SINK MUST BE GFCI-PROTECTED -PROVIDE SPARK RINGS WHERE RECESSED IN WOOD **THROUGHOUT HOUSE WHERE THE ELECTRICAL BOX IS RECESSED BEHIND COMBUSTIBLE WALL FINISH. THE BOX MUST FLUSH WITH THE COMBUSTIBLE WALL FINISH -LOCKOUT DEVICES FOR ALL HARDWIRED APPLIANCES **KITCHEN HOOD BREAKER -PROVIDE CLAMP FOR AC WHIP **SECURE THE WHIP WITHIN 12" OF DISCONNECT -THE RECEPTACLE AT THE FURNACE MUST BE SINGLE PLUG DEDICATED FOR THE WATER HEATER OR GFCI-PROTECTED; NEED 1/2" GYPSUM FIRE PROTECTION UNDER THE BOXED OUT WALL IN THE GARAGE
Documents & Images
Date Uploaded File Type Document Name
03/14/2019 Letter Codes Residential Plan Review
03/18/2019 Letter Codes Residential Plan Review
03/20/2019 Receipt Receipt for transaction: 2019-000952
03/20/2019 Letter Codes Building Permit
04/02/2019 Letter INSPECTION SUMMARY
04/12/2019 Letter INSPECTION SUMMARY
04/12/2019 Plot Plan DOC041219-04122019124622
04/15/2019 Letter INSPECTION SUMMARY
05/02/2019 Letter INSPECTION SUMMARY
05/02/2019 Letter INSPECTION SUMMARY
05/02/2019 Letter INSPECTION SUMMARY
05/07/2019 Letter INSPECTION SUMMARY
06/06/2019 Letter INSPECTION SUMMARY
06/06/2019 Letter INSPECTION SUMMARY
06/06/2019 Letter INSPECTION SUMMARY
06/06/2019 Letter INSPECTION SUMMARY
06/13/2019 Letter INSPECTION SUMMARY
06/13/2019 Letter INSPECTION SUMMARY
06/13/2019 Letter INSPECTION SUMMARY
06/17/2019 Letter INSPECTION SUMMARY
06/17/2019 Letter INSPECTION SUMMARY
08/13/2019 Letter INSPECTION SUMMARY
08/13/2019 Letter INSPECTION SUMMARY
08/15/2019 Letter INSPECTION SUMMARY
08/15/2019 Letter INSPECTION SUMMARY
08/15/2019 Letter INSPECTION SUMMARY
08/15/2019 Letter INSPECTION SUMMARY
12/19/2019 Letter DE-Daily Inspection Summary
06/10/2020 Monticello 2nd Plat Lot 33 20.0609
06/15/2020 Letter INSPECTION SUMMARY
06/16/2020 Letter INSPECTION SUMMARY
06/16/2020 Letter INSPECTION SUMMARY
06/17/2020 Receipt Receipt for transaction: 2020-003135
07/01/2020 Letter INSPECTION SUMMARY
07/06/2020 Letter INSPECTION SUMMARY
07/07/2020 Letter Codes Final Certificate of Occupancy
07/07/2020 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home